ML19354C289
| ML19354C289 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Vermont Yankee |
| Issue date: | 05/31/1974 |
| From: | Mcdonough L US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Purple R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8001070655 | |
| Download: ML19354C289 (2) | |
Text
i
,y e'
~
- ,$M 31 b l
1
/
/
l Memo to Files (Docket Nos. 50-269, 270 & 287)
THRU: Robert A. Purple, Chief, ORB #1, L j
1 SWITCHYARD LREAKER FAILURE RELAY PROTECTION P5I2 The following information was transmitted to Du.;e Power (Tom Cotten) by phone May 30, 1974.
We have reviewed your letter of May 3,1974, regarding th: modification of the Oconee Nuclear Station 230 KV switchyard breaker failure relay protection system.
We agree that these modifications offer reasonable assurance that this system will not inadvertantly trip due to a spurious i
signal generated by transient ground currenta and isolate the 230 KV switchyard.
1 1
The attached memo was not mailed and is for purpose of showing concurrence y
only.
l l
/I.. McDonough Operating Reactors Branch #1 Directorate of Licensing i
{
Enclosure:
1 Memo i
DISTRIBUTION:
i Docket File -
i Reading File LMcDonough 2
RAPurple TGNLh
._lgORB #1 L:0RB jll8 erricc w 3-i
. u.a. ~. >
7 h;.1]:
RAPn
,_5]lq]74 SlyI74
(! r ac.no (m.p-sn acu o2]o
..,. e h...ove.
= 1 m.m.. c a.
..u...
800107 3r5 g
5 m.
I q.
- Eg e
DISTRIBUTION Docket Files AEC PDRs Branch Readi JRBuchanan ORNL
~
Docket I:os. 50-269 TBAberna y, DTIE 50-210 ACRS
)
Goller, L:0R RAPurple, L:0R-1 LMcDonough, L:0R-1 Duke Power Cocpany TJCarter, L:0R ATIN: Mr. Austin C. Thies SMSheppard, L:0R-1 Senior Yice President SVarga, L:RP 422 South Church % treet TIppolito, L:EICS3 P. O. Box 2178 Charlotte, North Ca lina 28201 N
Gentlemen We have reviewed ycur letter of May 3,j 974, regarding the modification of the Oconee Nuclear Stag 230 KV pwitchyard breaker failure ::alay protection system. We agre that these modifications offer rsasonable 1no[dcurrentsandisolatethe230K7 inadvertently trip du assurance that this system l
signal generated by transient r an switchyard.
\\
Based on the above, we conci e th the 230 KV switchyard breaker f
failure relay protection sy[em, ',
fied as you propose, does not I
involve an unreviewed saf question\\
i
/
Sincerely,
/
i l
Robert A. P' le, Chief l
Operating Re tors Branch #1 Directorate of icensing l
cct Mr. Willips L. Porter ocones Coun Library j a n 2178
' /p201 S. Sprin Street Duke Powet_. Company Walhalla, Sou Carolina 26991 422 South Church Street Charlotte, North Carolina 28201 Mr.. Troy B. Conner Conner and Knotts
'1747 Pennsylvania Avenus, N.W.
Suite Ir*"O Washington, D. C.
20006 or rie s,- L: R-1
.LJ L ;0R.- 1
.u.
Di gh:dc.II it.
~
1
..,,,l5/20/74_.._.5617_4
,5/ /74
+
- u. s. novanan. swr enmvina orricas e.v4.sae-tee j 0-yoren AFC.318 (Rev. 9 53) AECN 0240