UNITED STATES i ({['.Y [
- T NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205550001 1
November 26, 1993 MEMORANDUM FOR:
Brian K. Grimes, Director i
Division of Operating Reactor Support, NRR j
i FROM:
Christopher I. Grimes, Chief Technical Specifications Branch Division of Operating Reactor Support, NRR
SUBJECT:
SUMMARY
OF OWNERS GROUPS MEETING ON THE IMPROVED STANDARD TECHNICAL SPECIFICATIONS:
SEPTEMBER 21 & 22, 1993 f
l On September 21 and 22, 1993, the Technical Specifications Branch (OTSB) met r
I l
with the Owners Groups (0G) to discuss the status of activities to implement l
the improved standard technical specifications (STS) and related matters. The' i
meeting attendees are listed in Enclosure 1.
The agenda for the staff's
_7 meeting with the Owners Groups is presented in Enclosure 2.
i The NUMARC representative suggested that the December TSIP conference in Florida be postponed because of the slip in schedule for the lead plants.
NUMARC will reschedule the conference when experience is gained on the implementation process.
The OG questioned 0TSB about the NRC lead-plant review process, particularly I
the instructions in NRR Office Letter #803 regarding the prioritization of l
amendment reviews for STS applications. OTSB informed the OG that the prioritization of STS applications is addressed in the Final Policy Statement.
The Commission's policy gives highest priority to complete conversions and i
high priority to line-item improvements. OTSB tracks line-items through the i
amendment screening process which requires the PMs to fill out tracking forma.
to determine whether the amendment request has generic applicability. Once the lead-plant amendment is approved, OTSB will process a generic letter to offer the line-item improvement to all plants.
Licensees are often aware of l
such approvals before generic letters are developed, and submit separate requests for the same TS change. The license amendment screening process will i
also identify the SER for follow-on applications which will help to expedite i
the approval of the line-item improvement TS changes.
4 The BWOG representative asked whether it is necessary to identify other plants j
wanting to pursue the same amendment in order to demonstrate the generic applicability. OTSB responded that it is not necessary, but it does help the i
utility to recognize similarities and the staff establish higher priority for l
line-item improvements with a broader range of applicability.. The OG also OTSB will obtain this information through amendment screening process.
questioned how NRC balances internal priorities on line-item and conversion reviews. OTSB responded that even though conversion reviews have priority, staff resources will be allocated so that the line-item amendments will not be delayed.
OTSB also advised the OG that the Crystal River SER will be issued soon. The j
Mbw M. A# @@[J 002070 070012 J
yur sp&
EMM 9312140405931126M U p iPC Kbiit{apdgy @ A I kw VJid J t 7 CF SUBJ S'
L-4-1PT50TSPEC CF h
- /# y gb g g fyfg -)
Brian K. Grimes November 26, 1993 Crystal River SER provides infornation related to the conversion basis that
{
should be used as a reference by the other lead plants and follow-on j
conversion applicants.
j The OG stated that there are numerous newer plants that find little economic l
gain for a complete conversion, and will use line-item improvements. OTSB i
stated that NRC policy permits line-item changes, but encourages complete conversions. The cost-benefit information submitted by the OG demonstrate that the total resources to implement line-item improvements will be much higher than that for a complete conversion, for both the licensees and the NRC. Moreover, line-item improvements will not realize the safety benefits associated with the user-friendly format and enhanced bases.
The NRC staff hopes that licensees will realize that a complete conversion is more cost effective.
For the specific STS issues, the OG provided 0TSB with the following new l
generic change packages, and several revisions to earlier packages, for our review: WOG 15 R1, BWR-06 C9 R1, BWR-08 R2, W0G-33, WOG-32, WOG-31, WOG-30, WOG-29, WOG-02 C9 R1, NRC-13, NRC-12, NRC-11, NRC-07 R1, NRC-06 R1, and NRC-03 C9 RI. We discussed the status of generic change packages received at the August meeting. This status is reflected in the updated status list provided in Enclosure 3.
Packages approved at the September OG/0TSB meeting were WOG-02 C9 R1, WOG-09 C2, BWR-13 C1-C5 and C7-C21, and NRC-09C'. The following open items were discussed.
WOG-15 R1, Steam Generator Inspection Program. 0G proposed a revised Condition B.
Basically any failure in the program will have 4 hrs'to restore.
The OG will provide a final wording for the WOG 15 R1 package.
NRC-07. The BWROG representative indicated at the August meeting that
=
they would accept the NRC-07 proposal provided that NRC put brackets on the entire condition B.
The OG provided a traveler for NRC-07 R1 to 0TSB during the meeting. However, the_0G stated that they should not have revised the NRC package; the initiator of a traveler should provide i
revisions. OTSB agreed that the same should be applied to both the NRC's and the 0G's proposed changes.
BWR-13, control rod scram time surveillance requirements. _ OTSB rejected the proposed changes to replace OPERABILITY requirements for isolation
{
valves in secondary containment penetration flow path. The staff cannot j
confirm TS compliance problems and needs additional design information.
0TSB also rejected the proposed change to relocate the "O psig" control rod scram time limit to the Core Operating Limits Report (COLR). The staff. needs additional information to support conclusions that the "O psig" control rod scram times vary from cycle to cycle in accordance
(
with a staff approved methodology.
l l
l
_ ~. _ _.. _ _ _ _ _ _. _.. _ _. _ _ _ _, _.. _._
M Brian K. Grimes i November 26, 1993
{
Status of Section 5.0.
The responsible technical branches have been tasked to develop justifications for those portions of administrative controls to be retained.
retained in Section 5.0 with corresponding justifications.OTSB will develop a WOG-02 C9, Quadrant Power Tilt Ratio.
alternate wording in an Action statement.0G accepted the NRC proposal for BWR-12, E-Bar.
NRC requested addition information which OG will provide.
Section 4.0, reducing the scope of administrative controls.
The OG will the next meeting. provide a proposed white paper to justify preparation of a travele The status of the STS Action Items and appropriate changes are reflected in the enclosed update (Enclosure 4).
We reviewed the following items:
Item # 108, BWROG-08 R2.
August meeting in Atlanta.OTSB provided the OG with two changes at the The OG accepted the first change to the Bases, but added proposed wording to the second change which they believe make the change more technically clear.
Item #109 and #110.
TS related to the deletion of shutdown cooling requirements.
BWOG must decide whether they will appeal to NRC.
Item # 111, revision of the positive reactivity insertion Required Actions.
SRXB is to revise the generic applicability.
Itew # 116, BWR-06 C9.
Post Accident Monitoring requirements.
We dis.ussed the wording of two indication channels with Carl Schulten on a telephone conference.
0G provided revised wording and the package was approved.
124, BWR-10. The OG did not provide a list of situations where trn splication of LC0 3.0.4 is an issue.
information at the October meeting.
They will provide this Item # 125, NRC-08,ISI/IST for snubbers.
NRC provided Bases for both IST and ISI.
NRC still believes that snubbers do not meet the criteria of theNRC Commission's policy statement.
This is also reflected in the " Split Report" which allows t" enubbers to be relocated.
Item # 127, BWOG-06.
Deletion of OPDRVs.
not decided whether to delete OPDRVs, especially if the plant has ECCSThe O make up capability.
shutdown risk TS resolution.OTSB will review this issue in light of the
i I
l 1
Brian K. Grimes November 26, 1993 i
OTSB will update the guidelines and process for STS changes, which C. Grimes will likely present at the December 0G/0TSB meeting.
NRC will continue to pursue a revision of NRR Office Letter #803 to incorporate these processes.
The Crystal River review experience will also help OTSB.to provide more detailed guidance for the conversion review process. The OG will continue to i
support the development of the STS including maintenance of the Bases.
The lead plant representatives discussed implementation status as follows:
i Submittal NRC Review Implementation SONGS 11/93 6-9 months 1 year Hatch 1,2 02/94 6 months 3/95 i
Crystal River SER 11/93 12/93 Zion 1,2 01/95 unknown unknown BWR/6 10/93 9 months Grand Gulf: 1/95-3/95 i
Clinton:
4/95-66/95 Perry:
4/95-6/95
~
River Bend: 10/95-12/95 Hatch representatives informed the staff that their submittal schedule has slipped from 11/93 to 2/94 because of difficulty in completing the containment, electrical, and instrumentation sections. However, the implementation date of 3/95 has not been changed.
l The BWROG stated that they will delay proposing NUREG-1433 changes resulting from the Hatch TS review until the BWR-6 plants have complettd their l
submittals so that changes to both NUREGs can be coordinated. This would preclude duplicating proposed generic changes and provide consistency between the two standards.
It is anticipated that these changes will be provided at t
the October meeting or by mid-November. The BWROG requested that the NRC place a priority on reviewing these packages so that the BWROG would know their status by late November to early December 1993.
This schedule supports l
the Hatch Unit 1 and 2 submittal. The BWROG stated that, in the interim, the BWR-4 and BWR-6 lead plants would proceed as if the proposed generic changes were approved; hence the importance of the priority for the NRC review of i
these packages.
OTSB agreed that we would expedite the review of the BWR0G generic changes.
For the shutdown risk TS, OTSB provided the OG with a redline-strikeout version of the proposed Bases. OTSB is still scheduled to complete model TS for a generic letter in December 1993. At the August meeting, the OG agreed to provide s list of non-safety system capabilities for shutdown risk TS; however, the OG informed us that they could not provide such a list at this meeting. Some of the OG members do not agree with the underlying basis for the technical requirements, as presented in SECY-93-190.
The OG are concerned that such participation will indicate their concurrence in the need for TS changes in Low Power and Shutdown (LPS) operations, which may foreclose further discussion of the underlying requirements.
The OG wanted to postpone shutdown risk TS discussions that were planned for this meeting until after all of the OG a.mbers could decide how to proceed.
1 1
. _. - _ _... _. _ - _,.. - ~. _ - -. -.. - - - - -
Brian K. Grimes November 26, 1993 j
The schedule for future lead plant meetings is October 26-29, New Orleans, LA; December 15-17, St. Petersburg, FL; January 24-26, Irvine, CA; and february 28-March 2, Birmingham, AL.
The transition from monthly to 6-8 weeks between scheduled meeting dates will likely occur in the Spring. Thus, a mid-April is tentatively scheduled for Baltimore, MD, and a mid-June meeting is scheduled for Chicago, IL.
l Christopher I. Grimes, Chief Technical crecifications Branch Division of Operating Reactor Support, NRR
Enclosures:
As stated cc w/o enclosures:
cc w/ enclosures:
T. Murley J. Callan W. Hall, NUMARC W. Russell R. Baker, 0G i
1 i
r l
l ENCLOSURE 1 Meeting Attendees September 21 & 22, 1993 Attendee Oraanization Brian Woods SCE/BWOG Ray Baker SNC/BWROG Jim Eaton NUMARC Blair Wunderly FPC/BWOG Sharon Mahler Hatch Darrell Gardner TVA/ Watts BAR Sheri Mahoney Entergy/BWROG Don Hoffman Excel /BWROG/CE0G
[
Lee Bush Ceco l
Jim Andrachek Westinghouse l
Brian Mann Calvert Cliffs l
Ronnie lo NRC/0TSB l
Bob Tjader NRC/0TSB Angela Chu NRC/0TSB l
I l-l l
1 1
1 ENCLOSURE 2 j
NRC/ INDUSTRY MEETING i
SEPTEMBER 21-22, 1993 IRVINE, CA
- 1. Process Review (eg: PM Instruction 802 Rev. 1)
- 2. Specific technical / philosophical issues review:
WOG 15 Rev 1 BWROG 8 Rev 2 WOG 29 NRC 3 i
WOG 30 NRC 6 Rev 1 l
WOG 31 NRC 9 (appvd)
NRC 11 i
- 3. NRC Open Items
- 4. Lessons learned from Lead Plants' (ie: Watts Bar and Crystal River 3) implementation; problems requiring generic resolution.
- 5. Conversion Status
- 6. Lead Plant meeting schedule
- 8. Di--iccion of shutdown risk tech specs; receipt of proposed Bases.
kpermhre 10,1991, Reven 3 INDUSTRY /NRC iMPROVFD TECilNICAL $PI.Cif ICATIONS (ITS) NUREG CH ANGE PACKAGES I
Chapters /
OG5 Date Markup
- Rmsuw, Date Comments NRC heviewer NUREG LCOs Affnt%1 Proval,,1 Irmitvalual OG Date (if NRC/OGS Uplatal Affected to NRC/OG5 Applorable)
Approvnt LCOs/ Bases Attactml BWR.01 C1 3.2.4 BWR4 & BWR6 2/19M3 N/A 3/20M3 J. MILLER BWR.0I A Cl 3.3. I.1 BWR4 & BWR6 2/19/93 N/A 3/20M3 J. MILLER C2 3.10.8 BWR4 & BWR6 2/19M3 N/A 3/20M3 J. MILLER I"BWR42 Cl 3.1 BWR4 & BWR6 2/19/93 N/A 3/20/93 C SCHULTEN C2 1.1 BWR4 & BWR6 2/19M3 N/A 3/20M3 C SCHULTEN C3 f.I BWR4 & BWR6 2/19/93 N/A 3/20/93 C SCHULTEN C.4 1.1 ALL OGS 2/19M3 N/A 3/20M3 C SCHULTEN i
C.3 1.3 ALL OG5 2/19M3 N/A 3/20/93 c S h '** "-
C. SO1ULTEN C.6 1.3 BWR4 & BWR6 2/19193 N/A 3/20/93 C.SOlULTEN C7 1.3 ALL OGS 2/19/93 N/A 3/20M3 C SCHULTEN CR B.2.1.1 B.2. l.2 ALL OGS 2/19793 N/A 3/20M3 C SCHULTEN CRa B.2.1.1,B.2.1.2 ALL OG5 2/19/93 N/A 3/20M3 C SCHULTEN C9 B.2. 3.2 BWR4 & BWR6 2/19/93 N/A 3/20M3 C SGIULTEN C IO SR 3 0.3 ALL OG5 2/1993 N R I N3 3/20M3
'"" W ~** * *
- N S" C. SCHULTEN CII LCO 3.0.3 ALL OGS 2/19M3 N/A 3/20M3 C SCHULTEN C 12 B 3.0 BWR6 2/19M3 N/A 3/20M3 C SCHULTEN BWR-03 Cl 3.49.34.10 BWR4 & BWR6 2/1993 N/A 3/20/93 J. MILLER C2 3.49.34.10 BWR4 & BWR6 2/19M3 N/A 3/20M3 J. MILLER C3 3.4.10 BWR4 & BWR6 2/19M3 N/A OPEN C"c J. MILLER C.4 3.9.8 BWR4 & BWR6 2/19M3 N/A 6/29'93 J. MILLER C5 3.9.9 BWR4 & BWR6 2/goM3 N/A 3/2093 J. MILLER C6 3.9.9 BWR4 & BWR6 2/19/93 N/A N/A cae=m - w m =c w **
J. MILLER WOG41 Cl 1.1 WOG 2/1993 N/A 3/20M3 R. CIARDIN A C2 B 3.0 ALL OG5 2/1993 N/A 3/20M3 R. GIARDIN A WOG42 Ci 3.2.2 WOG 2/19/93 N/A 3/20/93 P.HEAPN C.2 B 3.1.10 WOG 2/1993 N/A 3/20/93 P.HEARN m
C3 B 3.1.10 WOG 2/1993 N/A 3/20f93 P.HEARN
- E C.4 B 3.2.1 WOG 2/19M3 N/A 3/2093 P.HEARN h
CS B 3.2.3 WOG 2/19M3 N/A 3/20/93 P.HEARN O
C.6 B 3.16.B 3.2.1.B 3.2.2 WOG.BWOG 2/19/91 N/A 7/28/93 P.HEARN C.7 831.7 WOG 2/19M3 N/A 7/2RM3 P.HEARN
- 23 m
(AJ
4 4
f 4
1
)
sq42mher 30.1993 Reveem 3 INDUSTRY /NRC IMPROVED TEC11NICAL SPECII~ICATIONS (ITS) NUREG CilANGE PACKAGES 2
a a
Petitage Chapeers/
OGS Date Mortup Reviw m Deee Comments NRC Reviewer NUREG 9dumher/
LCOs Affected Pruvated Imfivutual OG Date (if NRC/OGS Updated Comment Affected to NRCIOGS Applicable)
Appmved j
' Number LCO daws Attactwd WOG42 (continued)
C.8 B 3.l.8 WOG 2/19M3 N/A 8/26/93 P.HEARN C9 3.2.4.B 3.2.4 WOG 2/19/93 R.I 9/21/93 9/2i/93 e***==*
WOG43 C1 3.1.4 WOG 2/19/93 N/A 3/20M3 R. GIARDINA C2 B 3.1.5 WOG 2/19M3 N/A 3!20/93 R. GIARDINA C.3 B 3.I.7 WOG 2/19/93 N/A 3/20/93 R. GIARDINA 4
C.4 B 3.I.8 WOG 2/19/93 N/A 3/20M3 R. GIARDINA C5 B 3.1.9 WOG 2/19/93 N/A 3/20!93 R. GIARDINA C6 B 3. I.10 WOG 2/19/93 N/A 3/20/93 '
R. GIARDINA C7 B 3.2.I WOG 2/19/93 N/A 3/20M3 R. GIARDINA C8 B 3.1.5 WOG 2/19/93 N/A.
3/20M3 R. GIARDINA j
WOG44 CI 3.6.6.
PWR OGS 2/19/93 N/A 3/20/93 R. GIARDINA WOG45 Cl B 3.9.1 WOG.BWOG 2/19/93 N/A 3/20M3 -
- 3. MILLER -
C2 B3.94 WOG 2/19/93 N/A-3/20/93
- 3. MILLER C3 B 3.9.4.B 3.9.3 WOG.BWOG.
2/19M3 N/A 3/20/93
R. GIARDINA -
C2 5.7. l.2 ALL OGS '
2/19/93 N/A 3/20M3 R. GIARDINA C3 5.7.2.3 ALL OGS 2/19s93.
N/A 3/20M3 R. GIARDINA -
1 C4 5.7.2.14 ALL OGS 2/19M3 N/A 3/20M3 -
R. CIARDINA C5 5.7.2.15 ALL OGS 2/19M3 N/A 3/20M3 R. GIARDINA
'C6 5.7.2.17 ALL OGS 2/19/93 N/A 3/20M3 R. GIARDINA C7 5.7.1.1.1, -
ALL OGS 2/19/93 '
N/A 3/20/93 R. Gl *RDINA BWOG41 C.I 1.1 ALL OGS 2/19M3 N/A 3/20/93 C. SCHULTEN C2 1.1 "
ALL OGS 2/19/93 N/A 3/20M3 '
C SCIlULTEN
. C3 1.1 ALL OGS 2/19/93 N/A 3/20/93 C SCHULTEN C4 1.1 PWROGS 2/19/93 N/A 3/20/93 C. SCHULTEN C5 1.2 ALL OGS 2/19/93 N/A' 3/20/93 C SCHULTEN C6 1.3 ALL OGS 2/19/93 -
N/A 3/20/93 ~
C SCHULTEN C7 f.3 ALL OGS 2/1993 N/A -
3/20/93 C SCIIULTEN 1
kr ember 30.1993. Rev6mm 3 INDUSTRY /NRC IMPROVED TECilNICAL SPECIFICATIONS (ITS) MURE(1 CllANGE PACKAGES 3
e Padage Chapters /
OGS Date Markup Revewm Date Comments NRC Reviewer NUREG Number /
LCOs Affettal Pmwn Individual OG Dste (if NRC/OGS Updated Comment Affected to NR.
1S Applushle)
Appenveil Number LCOs/ Bases Attached BWOG-01 (consmun!)
C8 1.3 ALL OGS 2/19M3 N/A 3/20/93 C SO1ULTEN C9 1.3 ALL OGS 2/19/93 N/A 3/20/93 C. SOlULTEN C10 LCO 3.0.2 ALL OGS 2/19M3 N/A 3/20M3 C. SGIULTEN Cll SR 3.0.4 ALL OGS 2/1993 N/A 3/20M3 C.SCHULTEN BWOG.02 C1 3.4.14.3.4.6 ALL OGS 2/19/93 N/A 3/20M3
- 3. MILLER C2 3.4.14.3.4.6 ALL OGS 2/19/93 N/A 3/20/93 J. MILLER O.3 3.4.16.3.4.7.3.4.8 ALL OGS 2/19/93 N/A 3/20/93 J. MILLER BWR44 Cl 3.1.1 BWR4&BWR6 3/19/93 N/A 4/22M3 C SCHULTEN C2 3.1.2 BWR4& BWR6 3/19/93 C2 R.17/29/93 4/22/93 en,,
m
.metwee an, C SCHULTEN C3 3.1.3 BWR4& BWR6 3/19/93 C3 R.17/29M3 4/2283 es
- % stanc-nm C.SCHULTEN C4 3.1.4 BWR6 3/19/93 N/A 4/22M3 C.SCHULTEN C5 B 3.1.3 BWR6 3/19/93 N/A 4/22M3 C SCHULTEN C.6 NOT USED C SCHULTEN C7 3.6.2.1 BWR4& BWR6 3/19M3 N/A 4/22/93 C SCHULTEN C8 3.6.4.3 BWR4&BWR6 3/19/93 N/A 4/22M3 C.SCHULTEN C9 3.5.9 BWR6 3/19/93 N/A 4/22M3 C. SCHULTEN C lO B 3.9.4 BWR4&BWR6 3/19/93 N'A 4/22M3 C SCtlULTEN
] WGG47 I
CB 3.3.1 WOG 3/39N3 N/A 4/22/93 R. GIARDINA 5
C2 3.3.1 WOG 3/19/93 N/A 4/22M3 R. GIARDIN A C3 NOT USED R. GIARDIN A C4 3.3.1 WOG 3/19/93 N/A 4/22M3 R. GI ARDIN A C5 3.3.1 WOG 3/19M3 N/A 4/22M3 R. GIARDIN A C6 3.36 WOG 3/19/93 C6 R.I 5/20/93 N/A C8'****d== d"'
5 "
"'c* "-
R. GIARDIN A C7 B 3.3.1 WOG 3/19/93 N/A 4/22/93 R. GIARDIN A CS B 3.3.I WOG 3/19/93 N/A 5/20/93 C8****4""*******"""*"*""*=*"
R. GIARDIN A C9 B 3.3.1 WOG 3/19M3 N/A 4/22/93 R. GIARDIN A CIO NOT USED R. GIARDIN A Cat B 3.3.1 WOG 3/19/93 N/A 4/22/93 R. GIARDINA Cl2 B 3.3.8 WOG 3/19/93 N/A 4/22/93 R. GIARDINA Cl3 B 3.3.8 WOG 3/19M3 N/A 4/22M3 R. GIARDINA Cl4 B 3.3.1 WOG 3/19/93 N/A 4/22M3 R. GI ARDINA CI5 3.3.1 WOG 3/19/93 CIS R.2 7/13M3 7/28/93 C#8""'""**"""ca=""**
R. GI ARDINA C.I6 B 3.3.6 WOG 3/19/93 N/A 4/22M3 R. GI ARDIN A
4 sepermber 30.1993. Revs.no 3 INDUSTRYINRC IM PROVED TECIINICAL SPECIFICATIONS (ITS) NUREG Cll ANGE PACKAGES 4
Pcrkage Chapters /
OGS Date Markup Revism Date NRC/OGS Comments NRC Reviewer NUREG Number /
LCOs Affsted Pmvkled Imhvufual OG Date (if Approved Updated
' Comment Affected b NRC/OGS Applicable)
Number LCOs/ Bases 4
Attaciwul WOG.os C1 3.3.3 WOG 3/19/93 N/A N/A c8*****'t""=
R. GIARDIN A C2 3.3.7. 3.3.16 WOG.BWOG 3/19M3 N/A 4/22/93 R. GIARDIN A C.3 3.3.8 WOG 3/19/93 C.3 R i er2993 7/2853 CJWW-**==**'""'t=*"'8*"
- k. GIARDIN A C4 83.3.4 WOG 3/19M3 N/A 5/20M3 R. GIARDINA C5 B 3.3.5 WOG 3/19M3 N/A 5/20/93 R. GIARDIN A C6 B 3.3.7 PWR OGS 3/19M3 N/A 5/20/93 c%Qg "=* *
- S" "'c-R. GIARDIN A j
WOG&
C.I 3.4.2 PWROGS 3/19M3 N/A 4/22/93 C2 3.4.8.3.4.19 WOG. CEOG 3/19M3 9/22/93 P.HEARN C3 3.4.10 WOG. CEOG 3/19193 N/A 4/22M3 P.HEARN C4 3.4.15 PWR OGS 3/ ISM 3 N/A.
4/22/93 P.HEARN C5 B 3.4.2 WOG 3/19/93 N/A 4/22/93 P.HEARN C6 B 3.4.4 WOG CEOG 3/19/93 N/A 4/22M3 P.HEARN C7 93.4.5 WOG 3/19!93 N/A 4/22M3 P.HEARN C8 8 3.4.10 PWR OGS 3/19M3 N/A 4/22/93 P.HEARN C9 B 3.4.11 WOG CEOG 3/19/93 N/A 4/22M3 P.HEARN CIO B 3.4.12 WOG. CEOG 3/19/93 N/A 4/22/93 P.HEARN Cli B 3.4.12 WOG 3/19M3 N/A 4/22!93 P.HEARN WOG.10 Cl B 3.5.1 WOG 3/19M3 N/A 4/22M3 R. GIARDIN A C2 B 3.5.4 WOG 3/19/93 N/A 4/22M3 R. GIARDINA WOG-II Cl R 3.6.2. 4. 6. 8 PWROGS 3/19/93 C 8 R I tr2s93 7/28/93 e s **=,ge,* e,.,
g e 4:.mc Xe-J. MILLER i
C2 B 3.6.3 WOG CEOG 3/19/93 N/A 4/22/93
e ia w, ses = aa,s, wee w m J. MILI.1R C4 B 3.6.6 WOG. CEOG 3/19/93 N/A 4/22/93 J. MILLER C5 B 3.6.8 WOG 3/19M3 N/A 4/22/93 J. MILLER 4
C6 B 3.6.8 WOG. BWOG 3/19/93 C,4 R I t'2t93 7/28/93 e e
= n,,,,, c J. MILLER WOG-12 Cl 3.7.8 WOG 3/19/93 N/A 4/22M3 R. GIARDIN A 1
C2 3.7.10.3.7.11 PWR OGS 3/19/93 N/A 4/22/93 R. GIARDINA
~
C.3 B 3.7.7 WOG 3/19/93 N/A 4/22/93 R. GIARDINA C4 B 3.7.17 WOG-3/19/93-N/A 4/22/93 R. GIARDINA C5 8 3.7.18 WOG 3/1953 N/A 4/22M3 R. GIARDINA i
T I-
Sepsendier 30.1993 Revt=am 3 INDUSTRY /NRC IMPROVED TEGINICAL SITCil'ICATIONS (ITS) NURI.G Clf ANGE PACKAGES 5
Package Char en/
OGS Date Merkup Revmon Date Comments NRC Reviewer NUREG e
Wmber/
LCOs Affected Pvtmded Imtmdual OG Done (If NRC/OGS Updated Com sent Affetted to NRC/OGS ApphcsNe)
Appetwed Number LCOs/ Banes Attached WOG.13 C.I NOT USED R. GI ARDIN A C2
C4
'"*****"8'"
R. GI ARDIN A
""'C C6 B 3.5.1 WOG 3/19n3 N/A 4/22/93 R. GIARDINA C7 93.8.I WOG 3/1933 N/A 4r22/93 R. GIARDINA L.8 B 3.8 2 ALL OGS 3/19M3 N/A 7/28/93 R. GIARDIN A C9 B 3.8.3 ALL OGS 3/Ign3 N/A 4/22M3 R. GIARDIN A CIO B 3.8.3 ALL OGS 3/g933 N/A 4/22f93 R. GI ARDINA CII B 3.8.3 ALL OGS 3/19/93 N/A 4/22M3 R. GIARDIN A Cl2 B 3.5.5 ALL OGS 3/19/93 N/A 4/22M3 R. GIARDIN A BWOG43 CI 3.9.4 BWOG 3/19/93 N/A 4/22/93 C MOON C2 3.9.5 PWR OGS 3/19/93 N/A 4/22M3 C MOON C.3 3.9.4 PWR OGS 3/19793 N/A 4/22M3 C MOON C4 3.9.2 BWOG 3/19/93 N/A 4/22/93 C. MOON C5 3.9.5 BWOG. CEOG 3/1983 N/A 4/22M3 C MOON C6 3.9 PWR OGS 3/19M3 N/A 4/22M3 C MOON BWR45 Cl I.I ALL OGS 4/22/93 c.: R t ar2*H 6/29/93 e'""C * **"a= * * **
C. SCHULTEN C2 1.1 BWR4&6.CEOG,BWOG 4/22/93 N/A 5/20N3 C SCHULTEN C.3 f.I ALL OGS 4/22M3 N/A 5/20M3 C SCHULTEN C4 1.1 BWR4&BWR6 4/22M3 e * **c w *" %
====8 * *"
C SCHULTEN C.5 8.I BWR4& BWR6 4/22/93 N/A 5/20/93 C SCitULTEN C6 1.1 BWR4&BWR6 4/22/93 N/A 5/20/93 C. SCHULTEN C7 LCO 3.0.3 ALL OGS 4'22/93 N/A 5/20/93 C. SCHULTEN C8 1.1 BWR4ABWR6 4/22/93 N/A 5/20/93 C SOtULTEN i
C9 LCO 3.0.5 ALL OGS 4/22M3 c'**c==***"**==***'***
C SCHULTEN CIO B 3.0 ALL OGS 4/22M3 C to R 16/29t'3 OPEN C"*e"*""**==r*"""**"*'*"""e C SCIIULTEN Cli B 3.0 BWR4A BWR6 4/22n3 e ie a i smH 7/28/93 e"""(ha-*****='*=*===*'*=*
C SCHULTEN Cl2 B 3.0 ALL OGS 4/22M3 N/A 5/20M3
- E * " ~ *"** "
- C SCHULTEN Cl3 B 3.0 ALL OGS 4/22/93 C 13 R 1 e/2'H OPEN e""*r===*"*a'""*"**=*==*=*""'c C SOfULTEN Cl4 I.4 ALL OGS 4/22M3 N/A
$COM3 C SCIIULTEN Cl3 B 3.0 ALL OGS 4/22/93 N/A 5/20/93 C SCliULTEN
e September 30.1993 Revision 3 INDUSTRY /NRC IMPROVED TECilNICAL SPECff'ICATIONS (ITS) NURI~G CllANGE PACK AGES 6
Patksge Chagwers/
OGS Dese Markup Revision Date Comments NRC Reviewer.
NUREG P$ umber /
LCos Aficceed Provi&d Indmdual OG Date (If NRC/OGS Updated Comment Affected to NRClOGS Applicable)
Approved mmber LCOs/ Bases Attached BWR46 CI 1.1 BWR4&BWR6 4/22M3 N/A 5/20M3 C. SO!ULTEN C2 1.1 BWR4 4/22M3 N/A 5/20M3 C SCHULTEN C3 1.4 ALL OGS 4/22M3 C 3 8 8 8'2'93 6/29/93
'3"*r*=d*"***="r="="8*=*"*
C. SCHULTEN C4 g 3.6 BWR4&BWR6 4/22M3 N/A 5/20/93 C SCHULTEN I
C.5 3.6 BWR4&BWR6,WOG 4/22/93 N/A 5/20M3 C. SCHULTEN C6 NOT USED
' ' * " ' " " * ~
C SCHULTEN l
C7 5.9.2 ALL OGS 4/22/93 N/A 5/20M3 C SCHULTEN l
C8 5.10 ALL OGS 4/22M3 N/A 5/20M3 C SCHULTEN C9 3.3 ALL OGS 4/22n3 coR3 w2iN3 OPEN C 8 ""r====8 ** *=ap * *** = =8 "== "n.m**. e,
C SCHULTEN
= s w rse e
,.-me w a BWR 47
,= e4 mac
,. e s om.
C1 3.8. I ALL OGS 4/22/93 e a n.: nt2s/'3 OPEN CJ***'*""***"8***"""*""*c C SCHULTEN BWR48 C1 3.8.7 ALL OGS 4f22.93 c 1 a.2 9/2193 OPEN C '* * "'c%,,,,"*"*"***
- = * *
~ *===
E. TOMUNSON l
C2 3.8.7 ALL OGS 4/22/93 ce m.2 9'21N3 OPEN
.,,.w-w,,,.,,
E. TOMUNSON ee n.m noe, C3 3.R.7 ALL OGS 4/22/93 e a n.2 er2 93 OPEN "a.*"'.=.h*==*'.',*.*.*e="""***8"*""*"=
E. TOMUNSON C4 B 3.8.9 BWR4&6.WOG.CEOG 4/22n3 en a 2 w2tM3 OPEN E. TOMLINSON WCG.14 t
Cl 3.8.#
ALL OGS 4/22/93 N/A 5/20M3 E. TOMLINSON
{
BWOG44 1
Cl 3.4.16 ALL OGS 4/22M3 N/A 5/20M3 E. TOMUNSON BWOG45 CI 3.8.1.3.8.4 ALL OGS 4/22/93 N/A 5/20/93 E. TOMUNSON NRC41 Cl 4.0 ALL OGS 4/22/93 N/A 5/20/93 N/A C2 B 3.7 ALL OGS 4/22/93 N/A 5/20M3 N/A C3 3.3.1 CEOG 4/22M3 N/A.
C3 "*c ***= - **.-, w en" N/A i
)
C4 83.3.5 CEOG 4/22M3 N/A c ' h*=+ aa'=* *== m'e===='t
"*c===d "
N/A C5 3.3.5 WOG 4/22M3 N/A CJ"*c=-**=*===='*"
N/A C6 3.3.2.1 BWR4 4'22M3 N/A
'8**=*'"**=""'C='""*"
N/A C7 3.3.2.1 BWR4 4/22M3 N/A 5/20/93 N/A j
C8 3.3.5.1 BWR4 4/22M3 N/A estin
,e m nee es "
N/A C9 3.3.8.1 BWR4 4/22/93 OPEN C****"""'"**"**""'**"**>""""""
N/A CIO 3.3.8.1 BWR6 4/22/93 OPEN N/A Cl1 3.3.8 BWOG 4/22M3 OPEN N/A Cl2 3.3.8.1 CEOG.A 4/22M3 OPEN N/A Cl3 3.3.R. I CEOG-D 4/22M3 OPEN' N/A i
k
~
e September 30,1993. Revism 3 INDUSTRY /NitC IMPROVED TEClfNICAL SPECII ICATIONS (ITS) NUREG CH ANGE PACKAGES 7
Package Chapters /
OGS Date Madop Revism Date Comments NRC Reviewer NUREG Number /
LCOs Aficcted ProvidJ imhvuluel Date (if NRC Updated Comment Affected to OG Apphenble)
/OGS Number NRC/OGS LCOs/ Benes Approved Attached
.NRC42 CE VARIOUS ALL OGS 5/20M3 N/A 7/28M3 cA **=* W -** =*=' - w= ad h ame c 8 *=h ac== a m N/A C2 5.7.2.15 ALL OG5 5/20/93 N/A 5/20/93 (J h ***
N/A C3 B 3.3.1 BWOG 5/20/93 N/A 5/20MJ N/A C4 83.7.5 BWOG 5/20/93 N/A 5/20/93 N/A C5 3.3.4 CEOG 5/20M3 N/A 5/20/93 N/A Co B 3.6.3 CEOG 5/20M3 N/A 5/20M3 c ' h *n-N/A C7 B 3.3.3,B 3.6.6 CEOG ~
5/20/93 N/A 5/20M3 N/A C8 83.7.7 CEOG 5/20/93 N/A 5/20M3 N/A C9 5.5.1.1 CEOr-5/20/93 N/A 5/20M3 N/A CIO 5.7.2.15, 5.9 CEO.i 5'20/93 N/A 5/20/93 c'***"'"
N/A Cil B 2.1.2 WOi 5/20M3 N/A 5/20M3 C H * **'
N/A Cl2 B 3.6.3 WO(.
5/20/93 N/A 5/20M3 c '2 h *"-
N/A Cl3 5 7.2.16 WOG 5/20M3 N/A 5/20M3 N/A C.14
- 3. I.4 BWR4 5/20/93 N/A 5/20M3 N/A Cl3 B 3.3. B 3.6 -
BWR4 5/20M3 N/A 5/20M3 N/A CI6 B 3.6.1.3 BWR4 5/20/93 N/A 5/20/93 N/A C.17 B 3.I.8 BWR6 5/20M3 NiA 5/20M3 N/A CI8 B 3.3, B 3.6 BWR6 5/20/93 N/A 5/20/93 '
N/A Cl9 B 3.6.1.3 BWR6 5/20/93 -
N/A 5/20193 N/A C20 B 3.8.4 BWR6 5/20M3 N/A 5/20M3 N/A C21 VARIOUS ALL OGS 5/20M3 N/A 5/20M3 N/A C22 5.7 BWR4
$/20/93 N/A 5/20M3 c = **=='t - i=* ** d==
h * =6' h=====c==-
N/A l BWR-10 Cl 4.0 ALL OGS 5/20/93 N/A OPEN C ' '=e C. SCHULTEN g
' Cl LCO 3.0.4 ALL OGS 5/20M3 OPEN ed **e
- = * **** *a d mb d*==8 8=== *** %
C SCHULTEN WCD-15 CI 5.7.2.13-PWR OGS 5/20/93 cia *'Gt93 OPEN C2 "ac =e *s*i wac. = w'==* *.=- m em
- e
==
- =a=d**2'**=*
R. T3 ADER w
Cl 1.2. 3 WOG 5/20/93 N/A 6/29/93 R. T3ADER I
C2 3.2,3 WOG 5/20M3 N/A 6/29/93 R. T3ADER CEOG41 l
Cl 3.8.6 ALL OGS 5/20/93 N/A 6/29M3 E. TOMLINSON C2 3.8.6 ALL OG3 -
5/20M3 c.2 R.8 6/2*M1 7/28/93 c 2 **= e e-ias.-=w v.u. =e n=====eena m isme
=e m..
E. TOMLINSON C3 B 3.8 6 ALL OGS 5/20/93 EA 6/2993 E. TOMLINSON C4 B 3.5.6 ALL OGS 5/20/93 N/A-6/29M3 E. TOMLINSON C.5 B 3.s 6 ALL OGS 5/20/93 c 5 m t 4/2'41 7/28M 3 c'**==a-**=*=va*==*======*******c-m E. TOMLINSON l
_o
.-m.-..
.......m
._._....._......--.-_..-.m~~._-m_m_..._--_
m _.
_,m.
m.
.mm,.
-m 4
I
?
l 4
t l
Septeenber 30,1993 Revism 3 INDUSTRY /NRC IMPROVED TECllNICAL SPECIFICATIONS (ITS) NUREG CHANGE PACKAGES g
p,ch,,
ch. peers /
OGS Deee Markup Revisinn Dese Conunents NRC Reviewer NUREG Number /
LCOs Affcceed Prtwkled Individual OG Date (if NRC/(X3S Updated i
Cnevenent Aflected to NRC/OGS ApphcaMe)
Appmved Munsher LCOs/Bages 4
Attached WRC4 Cl 3.1 BWOG 5/20M3 N/A 5/2053 N/A C2 1.1 BWOG 5/20/93 N/A 5/20!93 N/A C3 1.1 BWOG 5/20 s 3 N/A 5/20/93 N/A e
C4 1.1 BWOG 5/20/93 N/A 5/20/93 N/A C5 3.0.7 WOG.BWOG T M3 OPEN CJ hammy p ee omsm, e" N/A 4
C6 3.1.1 BWOG
' JDAr3 N/A 5/20/93 N/A C7
- 3. I.3 BWOG 5/20/93 N/A 5/20/93 N/A C8 3.5.3 ALL OGS 5/20/93 N/A 5/20/93 c'*'*='**==8'**=8" N/A l
C.9 3.5.2.ETC WOG.CEOG.BWGG 5/20/93 c.9 R I 2t93 OPEN c' h*="r r=a'a n i. m wee N/A C.10 3.5.5 BWOG 5/20/93 N/A 8/26/93 e m eson =s e=na.m e, n., m aro m e., % eneo yfg e ase m w s e -.r s s = ma as.
Cl 3.7 PWR OGS 5/20 s 3 N/A 5/20/93 c.: * **'2-N/A NRC-05 4
Cl B 3.3.6 WOG 5/20/93 N/A
$/20/93 N/A -
I C2 B 3.3.3 WOG 5/20/93 N/A 5/20/93 N/A C.3 83.3.5 WOG 5/20/93 N/A 5/20/93 N/A CEOG42 Cl 3.3.11 CEOG 5/25/93 N/A 6/29'93 C SCHULTEN C2 3.4.17' CEOG 5/25n3 N!A 6/29M3 C. SCHULTEN C.3 3.9.2 PWR OGS 5/25/93 N/A 6/29/93 C SCHULTEN WOG-17.
l C1 3.1.5 WOG' 5/25'93 N/A 6/29/93 P.HEARN C2 3.1.8 WOG 5/25n)
N/A 6/29/93 -
P.HEARN C3 3.I.10 WOG 5/25/93 N/A 6/29/93 P.HEARN C.4 3.2.1 WOG
$/25/93 N/A 6/29/93 -
P.HEARN
{
C5 3.2.3 WOG 5/25/93 N/A '
6/29/93 P.HEARN WOG 18 Ci 3.2.4 WOG 5/25193 OPEN c * **c ** 'a
- m *oo =
- aa'e ' 8 *== a a====== a-
C. SCHULTFN j.
' WOG-19
'~
Cl 3.6. 3.7 PWROGS 5/25/93
- c. n.i w2'93 7/28/93 c 8,*c,y;g84'a = **=-r *=** ~ *== h a e ms. noe C SCHULTEN WOG-20
'Cl B 3.4.12 -
WOG. CEOG 5/25/93 c.: a t v2wes 8/26/93 c'**'"****=6'*='==*=h=**'m""e="""*
R. GIARDINA s
5/25/93 8/26/93 R. GIARDINA -
C3 B 3.4.12 WOG. CEOG 5/25/93 8/26/93 R GIARDINA a
J -
u.
. ~
._._.2,.._
4 September 30 1993. Revium 3 INDUSTRY /NRC IMPROVED TECllNICAL Sri cirlCATIONS (ITS) NUREG CH ANGE PACKAGES 9
Pack ege Ospers/
OG5 Date Marnup Reviwm Date Comments NRC Reviewer NUREG Number /
LCOs Affectal Providnt Individual OG Date lif NRC/OGS Updated Comment Affected to NRC/OG5 Apphcable)
Appmved Wmber LCOs/ Bases Attached b WOG-21 C1 2.2 WOG 6/29/93 N/A 7/28/93 P.HEARN C.2 B 2.1.1 PWR OG5 6/29/93 N/A 7/28M3 P.HEARN C3 B 3.1.1 WOG 6/29/93 N/A 7/28M3 P.HEARN C4 B 3.1.2 WOG 6/29/93 N/A 7/28M3 P.HEARN
)
C5 B 3. I.5 WOG. BWOG 6/29/93 N/A 7/28/93 P.HEARN C6 B 3.1.5 PWR OGS 6/29/93 N/A 7/28/93 P.HEARN I
C.7 B 3.1.6 WOG 6/29/93 N/A 7/28/93 P.HEARN f*. 8 B 3.1.7 WOG 6/29/93 N/A 7/28M3 P.HEARN C9 B 3. I.7 WOGsCEOG 6/29/93 N/A 7/28M3 P.HEARN C.10 B 3.I.8 WOG, BWOG 6/29M3 N/A 7/28/93 P.HEARN Cli B3.1.9.B3.1.10 WOG. CEOG 6/29/93 N/A 7/28/93 P.HEARN Cl2 B.3. l. I. B 3.1.2 WOG 6/29/93 N/A 7/28/93 P.HEARN WCU.22 Cl NOT USED P.HEARN C.2 93.2.1 WOG 6/29/93 N/A 7/28/93 P.HEARN C3 B 3.2.5 WOG 6/29/93 N/A 7/28/93 P.HEARN C4 83.2.2 WOG 6/29/93 N/A 7/28M3 P.HEARN C5 93.2.2 WOG 6/29/93 N/A 7/28/93 P.HEARN C6 B 3.4.14 ALL OGS 6/29/93 N/A 7/28/93 P.HEARN C7 B 3.4.2 WOG. CEOG 6/29/93 N/A 7/28/93 P.HEARN C8 B 3.4.5 WOG 6/29/93 N/A 7/28M3 P.HEARN l
C9 B 3.4.7 PWR OGS 6/29/93 N/A 7/28/93 P.HEARN CIO B 3.4.7 WOG t.,/29/93 N/A 7/28/93 P.HEARN CII B 3.4.7 PWR OGS 6/29/93 N/A 7/28/93 P.HEARN j
Cl2 B 3.4.8 WOG 6/29/93 -
N/A 7/28193 P.HEARN C.I3 B 3.4.14 PWR OG5 6/29/93 N/A 7/28/93 P.HEARN WGD-23 Ci B 3.5.5 WOG 6/29/93 N/A OPEN t'"'c-*'a'a======
C. MOON C.2 NOT USED 6/29/93 N/A C. MOON i
C.3 3.6.5 WOG 6/29/93 N/A 7/28/93 C. MOON C4 B 3.6.2 WOG 6/29/93 N/A OPEN c.anec*"*
- C. MOON C5 NOT USED 6/29/93 C. MOON C.6 B 3.6.6 WOG. BWOG 6/29/93 N/A OPEN e s ame ***
- C. MOON l
C7 NOT USED 6/29/93 C. MOON '
A C8 B 3 6.10 WOG 6/29/93 N/A OPEN C 8 "*c *'**
- C MOON C9 B 3.6.10 WOG 6/29/93 N/A OPEN c ' '*e w *=*="'
C. MOON CIO B 3 6.14 WOG 6/29/93 N/A OPEN
- ""C****
C. MOON CII B 3.6.19 WOG 6/29/93 N/A OPEN e n mew-s h C MOON i
.. ~.. - ~.
--.....-.m-
..... ~
.w.
~. -.. - - -.
.we-.,-
~~..,.nm,..
~ - - - -.
t.rpeember 30,1093, Revum 3 INDUSTRYINRC lMPROVED TECllNICAL SPI Cif'ICATIONS (ITS) NUREG CilANGE PACKAGi:S 10 radsge Chapeers/
OGS Date 54arkuP Revewm Date Commmts NRC Revmr NUREG Wmher/
LCOs Affecht Pmvkht imimdual OG Date (If NRCIOGS Updated Commmt AfTetted to NRC/OGS Appinable)
Appmved Number LCOs/Bages Attatal WOG-24 WOG.HWOG, Cl 3.7.11 BWR4 & BWR 6 6.9/93 N/A 7/28M3 J. MILLER C.2 B 3.7.1 WOG.BWOG 6/29M3 N/A 7/28/93 J. MILLER C.3 B 3.7.2 WOG 6/29/93 N/A 7/28/93 J. MILLER C4 83.7.3 WOG.BWOG 6/29/93 N/A 7/28M3 J. MILLER C.5 B 3.7.10 WOG.BWOG 6/29/93 N/A 7/28/r3 J. MILLER C6 B 3.7.13 WOG 6/2993 N/A 7/28M3 J. MILLER C7 NOT USED 6/29M3 J. MILLER C8 NOT USED 6/29/93 J. MILLER C9 4.0 ALL OGS 6/29M3 N/A OPEN J. MILLER CIO NOT USED 6/29M3 J. MILLER BWR.!I C. I 2.1 BWR4, BWR6 6/29/93 N/A 7/28M3 C. SCHULTEN C.2 2.1 BWR4. BWR6 6/2993 N/A 7/28/93 C. SCHULTEN C.3 B 2.1.1 BWR4. BWR6 6/29/93 N/A 7/29/93 C. SCilULTEN F
C4 B 2. I. i BWR4, BWR6 6/29M3 N/A 7/28N3 C. SCilULTEN C5 B 2.1.1 BWR4, BWR6 6/29/93 N/A 7/28/93 C. SCilULTEN C.6 B 2.1.1 BWR4. BWR6 6/29/93 N/A 7/28/93 C SCHULTEN C7 82.1.1 BWR4. BWR6 6/29/93 N/A 7/28M3 C. SCilULTEN C8 B 2. l. 8 BWR4. BWR6 6/29/93 N/A 7/28M3 C. SCilULTEN l
C.9 B 2.1.2 BWR4. BWR6 6/29/93 N/A 7/28'93 C. SCliULTEN C 10 B 2.1.2 BWR4. BWR6 6/29M3 OPEN C,,,"*cy**'*'"'******"
C. SCHULTEN C.lt B 2.1.2 BWR4, BWR6 6/29/93 OPEN e""" y * * '5*
- e5 aw "'c d'=' = *:'*
C. SCHULTEN Cl2 B 2.2.4 BWR4. BWR6 6/29M3 OPEN
(""'c*""'***"* ""* ** '"
C. SCHULTEN
,NRC416 C1 4.0 PWI OGS 6/29/93 e a R t 9t:i3 OPEN
- A h * *"n.m * *.-** - ha -.a= cae s.
N/A
- * = =, =
.a 6.
.noe sw bouwe s =thd9543 99 apr o shu.he m
._. ~
}
Septemler 30.1993. Rmwm 3 INDUSTRY /NRC IMPROVED TECHNICAL SPECIFICATIONS (ITS) NUREG CH ANGE PACKAGES II t
Pedage Chapterd OGS Date Martup Revewm Date Conenents NRC Reviewer NUMEG Nunber/
LCOs Affected Pmvided Indevaluel OG Date (If NRC/OGS Updated,
Cmument Affected to NRCIOGS Applorable)
Appewed Number LCOs/Bews Attached WOG.23 2
C1 3.3. B 3.3 WOG 6/29M3 N/A 7/28M3 C. SCHULTEN C.2 3.3. B 3.3 WOG 6/29M3 c.2 m.2 7as93 OPEN C2**=******hm=*"***
C SCHULTEN C3 3.3. B 3.3 WOG 6/29M3 C 3 M 7C"3 7/28M3 C2"*ca"'=*****===****==>a=a==d'=p6***
C. SCHULRN C.4 3.3 B 3.3 WOG 6/29M3 c 4 R 8 7/2"3 OPEN c ' h*==' ='hd n==
- 8 ** **c a'a =* " ***
7/28!93 C. SCHULTEN C7 3.3 B 3.3 WOG 6/29M3 N/A 7/28/93 -
C SCHULTEN C8 3.3, B 3.3 WOG 6/29/93 esp. 7/2s93 OPEN c'h*"*****""*"
C. SCHULTEN -
C9 3.3. B 3.3 WOG 6/29M3 N/A 7/28M3 C SCHULTEN C10 3.3. B 3.3 WOG 6/29/93 c.Io R 2 7/2s93 OPEN C W heimsy med hi.e b.6.ime answe 9 2 M C SCHULTEN
- Cil 3.3 G 3.3 NOT USED
-~
C.SCHULTEN Cl2 3.3. B 3.3 WOG 6/29M3 C.12 a.: 7/2s93 7/1*/93 cn"ac e
% =m.a w
me8**
C. SCHULTEN Cl3 3.3 B 3.3 WOG 6/29793 N/A 7/28893 C SCHULTEN Cl4 3.3. B 3.3 WOG 6/29/93 N/A 7/28/93 C. SCHULTEN i
C 13 3.3. B 3.3 WOG 6/29M3 N/A 7/28M3 C. SCHULTEN CI6 3.3. B 3.3 WOG 6/29/93 N/A 7/28/93 C SCHULTEN Cl?
3.3 B 3.3 Ws C 6/29M3 N/A 7/28/93 C. SCHULTEN C.18 3.3 B 3.3 WOG 6/29/93 N'A 7/28M3 C. SCHULTEN CI9 3.3. B 3 3 WOG.
6/29M3 N/A 7/28'93 _
C. SCHULTEN l
C20 3.3 B 3.3 WGG 6/29M3 N/A 7/28M3 C SCHULTEN.
j C21 3.3. B 3.3 WOG 6/29M3 c 2t a a 7ca93 OPE'l
"* * * * * ^
i=*"*' 2 "*
C SCHULTEN t
C22 3.3. B 3.3 WOG 6/29M3 N!A 7/2863 C. SCHULTEN T
C.23 3.3 B 3.3 WOG 6/29/93 N/A-7/28M3 C.SCHULTEN l
C.24 3 3, B 3.3 4 00 6/29/93 c.24 m t fr2s93 7/28/93 C2'"*c*=""'8***=='""**=**===**=='h"
C SCHULTEN
-[
C.23 3 ' B 3.3 PWR OGS 6/29M3 c 23 a i tc'93 OPEN C3 *
.aw m -
-***H ** '
C SCHULTEN C26 3.3. B 3.3 WrG 6/29M3 N/A 7/28/93 C SCHULTEN
{
C27 3.3, B 3.3 WOO 6/hiM3 c.27a a 7/2s93 OPEN C2'"*c**'==*****=p**
- =*aw'='*===h****.
C SCHULTEN i
WOG-26 Cl NOT USED P.HEARN C2 WOG 6/29/93 N/A 7/28/93 P.HEARN I
C.3 WOG 6t29M3 N/A 7/28/03-P.HEAPN
[
C.4 ALL OGS 6/29/93 N/A 7/28M3 P.12ARN l
C3 PWR OGS 6/29M3 N/A 7/28M3 P.HEARN
- i i
t 1
4 1
... - -,....-.-..-~-..6-
...,r-
-..----..,,,w..-e-.-
m.-
w v
%*.--c.-t-e,-
e-.a
- 2--v ar e r---e.u..wm-e--
ww.w.-..
...-=...-e+--w.. -em-we+-ew-
..r.-r-e 4
.-.-.r.
.ee.v-.-...,..-.-.<-.--ma...-
m....., _. __
..m Seg4 ember 30.1993. Revism 3 INDUSTRY /NRC IMPROVED TECilNICAL SPEctrtCATIONS IITS) NUREG CilANGE PACKAGt S 12 Packsge Chapters /
OGS Date Markup Reviwm Date Commmts NRC Reviewer NUREG 6
WmMi
- LCO, Arrated Prmided Imlivklual OG Date (if NRC/OGS IJpdated Commme Affected to NRC/OGS Apphcable)
Argw wed Wmber LCOn/Baaes Attached BWR-13 Cl 3.1 BWR4 & IlWR6 7/29M3 OPEN c'"""""*-
C. MOON C2 3.1 BWR4 & BWR6 7/29/93 9/21/93 C. MOON C.3 3.1 BWR4 & BWR6 7/29/93 9/21/93 C MOON C4 3.1 BM4 & BWR6 7/29/93 9/21/93 C MOON C5 3.1 BWr< & BWR6 7/29/93 9/21/93 C MOON C6 3.1 BWR4 & BWR6 7/29M3 OPEN C8 "'c a=' t'a="'
C. MOON C7 3.1 BWR4 & BWR6 7/29M3 9/21/93 C MOON C8 3.1 BWR4 & BWR6 7/29M3 9/21/93 C MOON C9 3.1 BWR4 & BWR6 7/29M3 9/21/93 C. MOON CIO 3.1 BWR4 & BWR6 7/29/93 9/21M3 C. MOON Cll 3.1 BWR4 & BWR6 7/29/93 -
9/2I/93 C MOON Cl2 3.1 BWR4 & BWR6 7/29/93 9/21/93 '
C MOON Cl3 3.1 BWR4 & BWR6 7/29/93 9/21/93 C MOON Cid 3.1 BWR4 & BWR6 7/29/93 9/21M3 C MOON C.15 3.1 BWR4 & BWR6 7/29/93 9/21/93 C. MOON C16 3.1 BWR4 & BWR6 7/29/93 9/21/93 C. MOON C.17 3.1 BWR4 & BWR6 7/29/93 9/21/93 C MOON CIR 3.1 BWR4 & BWR6 7/29/93 9/28/93 C. MOON C.19 3.1 BWR4 & BWR6 7/29M3 9/21/93 C. MOON C20 3.1 BWR4 & BWR6 7/29/93 9/21/93 C MOON C21 3.1 BWR4 & BWR6 7/29M3 9/21/93 C MOON WOG-27 Cl SR 3.7.5.3 & 4 PWR OGS 7/29/93 8/26/93 G. GIARDIN A NRC47 C1 3.6.8 ALL OGS 7/29M3 e i R I 9t21 *3 OPEN c3 m.
e, um
- N/A NQC.08.
Cl 5.7.2 ALL OGS 7/29M3 OPEN t ' **="' **'*'t
- p W h *=p * * **="'
N/A C.I 3.5.1 PWROGS 8/26/93 OPEN
""t"""'*******
R. GI ARDIN A BWR.12 C. I 3.4.7 & 3.4.8 BWR4 & BWR6 8/26/93 OPEN R. T3ADER WOG-28 C. l B 3.5.1 PWR OGS 8/26/93 OPEN R. GIARDINA NRC49 CI 33.7.1 CEOG 8/26/93 9/21/93 N/A 4
l NRC 10 CI 5.5.1 & 5.5.2 ALL OGS 8/26M3 OPEN e 8 m====* % * *==*8 w - *
- N/A
.. _ _. _ _ _ _ _ _. _. _ _. _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _. _. _ _ _ _ _. _ _ _ _ _ _ _ _ _. _ _ _ _ _. _ _ _ _.... _ _ _ _.. - _..... ~ _ _ _ _.. - - - _... - _. _. _. _.. _.... - -. _. _,. _ _ _.. _,. _.,,. _, -.., _ _ _.,, _......,, _ -
I O
kreember 30,1993, Revimm 3 INDUSTRY /NRC IMPROVED TECIINIC iPECIFICATIONS (ITSI NUREG Clf ANGE PACK AGES I3 Package Ch8Pters/
OGS Date Mariup Revimm Detr Comments NRC Reviewer NUREG Number /
LCOs Affected Provated Imhvulual OG Date (if NRCIOGS Updated Comment AfTected to NRC/OG5 Applicable)
Approved Number LCOs/Baws Attached NCC-Il C.I 3.4.10 & 3.4.12 BWOG 8/26M3 c_l a t er2iT3 OPEN e 8 % * ' ' "" **
- e a'c N/A MRC-12 C.I b 3.3.6.1 BWR4& BWR6 9/21/93 OPEN N/A NRC-13 C.I B 3.7.5 PWR OG5 9/21/93 OPEN N/A WC3-29 C.I 3.3. 2 WOG 9/21/93 OPEN q
C.I 3.3.1 WOG 9/21193 OPEN Wcs-31 C.I B 3.3.1 WOG 9/21M OPEN C.2 B 3.3.1 WOG 9/21193 OPEN C.3 B 3.3.1 WOG 9/21/93 OPEN C.4 B 3.3.2 WOG 9/21/93 OPEN C.5 B 3.3.2 WOG 9/21/93 OPEN
. Wcs.32 C. I I.3 ALL OGS 9/21/93 OPEN W OG.33 I
C.1 3.31 WOG 9/21/93 OPEN
~
ENCLOSURE 4 ACTION ITEMS f
Action Description Status j
12 PRPB Offgas Monitor position (3.4.12 &
GENERIC: Awaiting resolution of PAMS).
related DPV.
l 20 OTSB pursue generic concern cf tripped-GENERIC: OTSB initiate evaluation l
state vulnerabilities.
of tripped-state risks.
t i
j 30 OTSB pursue backfitting Delay LOOP /LOCA GENERIC:
0TSB initiate evaluation i
surveillance for all plants.
to determine whether to backfit delayed LOOP tests.
Information 2
l Notice 93-17 identified concern, but l
EELB believes further generic action j
may be warranted.
GO OG develop admin controls for Tendon COMPLETE: Tendon Program.
t Surveillance and SG Tube Surveillance Administrative Control programs.
COMPLETE: OG proposed program submitted for NRC Engineering I
review. OG proposal rejected per Russell letter of 6/23/93. 06
)
appeal on 8/12/93 successful. OG 1
resubmit under WOG 15-R1 i
3 67 OTSB trace removal of surveillance COMPLETE:
Restored SR for BWR-4 requirement for drywell-wetwell vacuum vacuum breaker surveillance.
breakers within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after steam discharge.
GENERIC: 0TSB evaluate need for BWR-6 vacuum breaker surveillance.
OG to provide justification.
l i
l
)
109 Deletion of requirement to have a COMPLETE: Reliable RCS temperature
{
shutdown cooling subsystem in monitoring is an important safety i
operation, since this requirema t is function. 0G should address in 2
only provided to ensure accurate comments on shutdown requirements.
t reactor coolant temperature monitoring.
Reconsider BWROG 2/13/92 comments.
i BVR4: 3.4.8, 3.4.9, 3.9.7, and 3.9.8 Awaiting SRXB response.
SRXB i
BWR6: 3.4.9, 3.4.10, 3.9.7, and 3.9.8 rejected in 7/13/93 memo.
l 110 Deletion of shutdown cooling COMPLETE: There should be a i'
ambient are sufficient to maintain exception, established on a case-by-requirements when heat losses to demonstrable need for such an i
reactor coolant temperature (similar to case basis. 0G should address in Perry and Fermi-2 technical comments on shutdown requirements, specifications).
Reconsider BWROG 2/13/92 comments.
BWR4: 3.4.9, 3.9.7, 3.9.8, and 3.9.9 Awaiting SRXB response. SRXB STS Status Dated: 9/16/93 I
[
r i
,r n
e en
f i
l ACTION ITEMS i
1 Action Description Ltjttyi BWR6: 3.4.10, 3.9.7, 3.9.8 and 3.9.9 rejected in 7/13/93 memo.
111 Revision of the positive reactivity COMPLETE: NRC rejected OG' proposal insertion Required Actions to allow per memo from Reactor Systems Branch normal makeup and cooldown activities, dated 4/28/93. Byron / Braidwood amendment approved. SRXB to review W: 3.3.1, 3.3.9, 3.8.2, 3.8.5, 3.8.8, generic applicability.
3.8.10, and 3.9.3 112 One hour instead of 15 minutes for GENERIC:
It is not apparent that securing an RHR pump in Mode 5 with the the subcooling provision would RCS Loops not filled, as long as RCS provide adequate protection over the temperature is maintained ;t 10" range of conditions of interest. OC subcooled.
should address in comments on shutdown requirements.
PWR: 3.4.8 113 Required Action B of LC0 3.4.6, GENERIC: During Mode 4 when the RCS
" Initiate actions to restore an DHR temperature is above 200* F, if only Loop OR place the Unit in Mode 5."
one RHR train is operable and two required RCS loops are inoperable, PWR: 3.4.6 the unit should be brought to Mode 5 within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. 0G should address in comments on shutdown requirements.
114 LCO 3.9.4, LCO note prior to proof-and-GENERIC: The basis for allowing DHR review allowed DHR to be removed fram to be removed from operation for up operation for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> per 24-nour to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> in a 24-hour period is period.
not clear. The staff believes that allowing DHR to be removed from B&W: 3.9.4 operation for up to one hour in an 8-hour period is appropriate, with due consideration for decay heat removal and boron stratification concerns. OG should address in comments on shutdown requirements.
116 Establish consistent PAM requirements IMPLEMENTATION: 0TSB proposed two for single-channel parameters.
options to OG following review of uBWR-06>> package. 0G provided l
Rev. I to u BWR-06>> 6/30/93. NRC l
accepted with change. OG provided l
Rev. 2 to uBWR-06>> 7/28/93. Rev.
l 2 accepted with change.
1 STS Status Dated:
9/16/93
ACTION ITEMS 1
Action Description Status 119 Restructure Chapter 5.0.
IMPLEMENTATION: OG informed of NRC (OGC) position on requirements to restructure. OG completed matrix to t
prioritize sections for removal.
OTSB to develop plan to restructure Chapter 5.0.
OG to input on procedures. CR-3 SER needs l
justification for l
relocations / deletions.
I 124 Develop clarification
',e LCO 3.0.4:
IMPLEMENTATION: OG proposal not applicable for pit.6 shutdown.
submitted in May (<<BWR-10>>).
OTSB to forward to SRXB for review. SRXB approved pending OG listing of excepted circumstances.
125 ISI/IST for snubbers IMPLEMENTATION: Model TS provided to OG. OTSB provided new model TS to OG in <<NRC-08)> on 7/29/93.
OTSB to provide justification.
126 PTLR/LTOP IMPLEMENTATION: Chapter 5.0 l
description of PTLR given to OG.
Memo requesting EMCB comments isseed. 0G provided response to i
l NRC-proposed change to 5.0.
OTSB requested markup of 5.0 reflecting OG position.
EMCB reviewing.
127 OPDRVs OG position requested 6/29/93 on WNP-2 experience. BWROG lead.
BWROG provided results of poll of BWR utilities.
PWROG submitted traveller to delete OPDRVs from STS.
OG to submit traveller to delete for BWR.
j STS Status Dated:
9/16/93 l
I
~
I Brian K. Grimes November 26, 1993 i
j The schedule for future lead plant meetings is October 26-29, New Orleans, LA; December 15-17, St. Petersburg, FL; January 24-26, Irvine, CA; and l
February 28-March 2, Birmingham, AL. The transition from monthly to 6-8 weeks between scheduled meeting dates will likely occur in the Spring.
Thus, a mid-l April is tentatively scheduled for Baltimore, MD, and a mid-June meeting is scheduled for Chicago, IL.
Original Signed by:
C. I. Grimes Christopher I. Grimes, Chief Technical Specifications Branch Division of Operating Reactor Support, NRR l
Enclosures:
As stated cc w/o enclosures:
cc w/ enclosures:
T. Murley J. Callan W. Hall, NUMARC W. Russell R. Baker, OG DISTRIBUTION: w/ enclosures DISTRIBUTION: w/all enclosures except enclosure 3 Central Files BKGrimes JACalvo CERossi PDR CIGrimes GClainas BABoger OTSB R/F OTSB Staff JAZwolinski FJCongel
~Nes c/
MSchwartz, OGC MJVirgilio DMCrutchfield CMarco, 0GC JTWiggins DPAllison, CRGR SAVarga ACThadani JHConran, CRGR JWRoe DOCUMENT NAME:
G:\\0TSB2.REV OTSB:D013E;NRR SC:0TSB: h BC:0TSB: DORS
- g~
ATChu 8 L-CSSchulten CIGrime f(Grimes n v
ll A3/93 Il$/93 it /$/93 A /cg93
- 4 w
,.,