Forwards IE Insp Rept 50-382/80-25 on 800916-1015.No Noncompliance Noted
ML19353A136
Person / Time
Site: Waterford 
Issue date: 11/19/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Aswell D
LOUISIANA POWER & LIGHT CO.
Shared Package
ML19353A137 List:
References
NUDOCS 8101070247
Download: ML19353A136 (2)


See also: IR 05000382/1980025

Text

j

i

Y K,

]

y[] i%

UNITED STATES

[,

  • 1

NUCLEAR REGULATORY COMMISSION

Y

REGloN IV

,

0,

[ ;-

611 RYAN PLAZA DRIVE. SUITE 1000

cN

~

'i

,,,,,#

ARLINGTON. TEX AS 76011

a

4

M

November 19, 1980

In Reply Refer To:

Docket No. 50-382/80-25

Louisiana Power and Light Company

Attn:

D. L. Aswell, Vice President

Power Production

142 Delaronde Street

New Orleans, Louisiana 70174

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Messrs. G. L. Constable and D. L. DuBois of <sur staff during the period

September 16 - October 15, 1980, of activities authorized by NRC Construction

Permit No. CPPR-103 for Waterford Steam Electric Station, Unit No. 3, and to

the discussions of the findings with D. B. Lester at the conclusion of the

i nspection.

Principal areas examined during the inspection included:

(1) Operational Staff-

ing; (2) Overall Preoperational Test Program; and (3) Plant Tour. Within these

areas, the inspection consisted of selective examination of representative

records, interviews with personnel and observations by the inspectors.

Within the scope of the inspection, no items of noncompliance were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office within twenty (20)

,

l

days of the date of this letter, requesting that such information be withheld

l

from public disclosure. Any such application must include a full statement of

the reasons on the basis of which it is claimed that the information is pro-

prietary, and should be prepared so that proprietary information identified

in the application is contained in a separate part of the document.

If we do

not hear from you in this regard within the specified period, the report will

be placed in the Public Document Room.

!

!

l

01070 Q Q

.

.

Louisiana Power and Light Company

2

November 19, 1980

Should you have any questions concerning this inspection we will be pleased to

discuss them with you.

Sincerely,

.h jV }hu mW

}(p'uG.L.Madsen, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection Report No. 50-382/80-25

l

l

l

i

l

l

l

l