.f" %

L) 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-280 AND 50-281 VIRGINIA ELECTRIC AND POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Rehulatory Commission (the Commission) has issued Amendment No. 71 to Facility Operating License No. DPR-32 and Amendment No. 71 to Facility Operating License No. DPR-37 issued to Virginia Electric and Power Company (the licensee), which revised Technical Spet.ifications for operation of the Surry Power Station, Unit Nos.1 and 2, respectively,

(.the facilities), located in Surry County, Virginia. The amendments are effective as of the date of issuance.

The Unit I amendment revises the Technical Specifications to* reflect changes as a result of modifications made to alleviate Net Positive Suction Head (NPSH) problems with the Low Head Safety Injection and Recirculation Spray Pumps and modifications made to the containment spray system. Changes have been made to service water temperature, containment temperature, containment air partial pressure, refueling water storage tank volume and outtide recirculation pump flow rate.

These limits have been transferred to the Technical Specifications from the license.

The Unit 2 amendment revises the Technical Specifications to reflect that the Unit 1 change above applies to both Units 1 and 2.

The Unit 2 Technical Specification changes were issued in Amendment No. 59 on Aug=c 1,1980.

810702O M

~-

,,w..

s 7590 The application for the amendments complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments.

Prior public notice of these amendments was not required since these amendments do not involve a significant hazards consideration.

The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)l4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of these amendments.

For further details with respect to this action, see (1) the application for amendments dated May 19, 1981, (2) Amendment Nos. 71 and 71 to License Nos. DPR-32 and DPR-37, (3) the Commission's letter to the licensee datedlune 23,198% and (4) the Commission's Safety

~

Evaluation dated August 1,1980. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D.C. and at the Swem Library, College of William and Mary, Williamsburg, Virginia 23185. A copy of itens (2), (3), and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.

20555, Attention:

Director, Division of Licensing.

.. ~.

iS90-01 -

Dated at Bethesda, Maryland this 23 day of June, 1981.

FD THE NUCL ULATORY COMMISSION n

ga i

, Operating Reactors - anch #1 Division of Licensi S

9 0

e W

,-m 9

S' h..

-,-..1%-

-,-.v.-.

--y.c,---

--w--

c--,-ie Im r.

..,,-,.-.nw.,.--v-,-w y,w-y-.,- -, - - -,--, --

,y4 -, w w.

y -. +-