ML19352B076

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-341/81-03 on 810216-0331.No Noncompliance Noted
ML19352B076
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/28/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wells D
DETROIT EDISON CO.
Shared Package
ML19352B078 List:
References
NUDOCS 8106030039
Download: ML19352B076 (2)


See also: IR 05000341/1981003

Text

y

_ _

/

'o,,

UNITED STATES

f//1

!^

NUCLEAR REGULATORY COMMISSION

n

k

,E

REGION lil

N

,

'o

'#

799 ROOSEVELT ROAD

e*

GLEN ELLYN, ILLINOIS 60137

.....

April 28, 1981

I

<

-'

s )7

-

g,n

Docket No. 50-341

-

.

_

The Detroit Edison Company

C

JUN 011981* T

ATTN:

Mr. Donald A. Wells

-12

,a

-

Manager, Quality Assurance

c,

u.syg,'3,4

2000 Second Avenue

/

Detroit, MI 48226

4

g

W

N

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. B. H. Little

and P. M. Byron of this office on February 16 - March 31, 1981, of activities

at Enrico Fermi, Unit 2, authorized by NRC Construction Permit No. CPPR-87

and to the discussion of our findings with Mr. W. Fahrner at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room, except as

follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this office, within

twenty-five days of the date of this letter, to withhold such information

from public disclosure. The application must include a full statement of

the reasons for which the information is considered proprietary, and should

be prepared so that proprietary information identified in the application

is contained in an enclosure to the application.

8106030039

'

h

j

- ..

it

9

., f '.

L

-2-

.The Detroit Edison Company.

April 28, 1981

,

-We will gladly discuss'any questions you have concerning this

inspection.

Sincerely,

-

sn

.

R. F. Heishman, Acti g Director

Division of Resident and Project

Inspection

Enclosure:

IE Inspection

. Report No. 50-341/81-03

i

cc w/ enc 1:

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

,

Ronald Callen3 Michigan

Public Service Commission

Eugene B. Thomas, Jr.,

Attorney

t

i

,

>

>

Y

i

i

.

"

-

g - e

-w

w