Forwards IE Insp Repts 50-329/81-09 & 50-330/81-09 on 810325-27 & 0407-09 & Notice of Violation
ML19352A985
Person / Time
Site: Midland
Issue date: 05/21/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19352A986 List:
References
NUDOCS 8106020511
Download: ML19352A985 (2)


See also: IR 05000329/1981009

Text

e

o

tM Dg

g

'o

UNITED STATES

.['

,

~ ,g

NUCLEAR REGULATORY COMMISSION

<

s

REGION lli

t;

.. of

no noossvati no4o

i

c

GLEN ELLYN. lLLINOIS 60137

%, **..../

& fI1%

MM 91 1981

O

V

$ Q

d'k

('E @M N$/ C

,d,

Docket No. 50-329

h(v j

Docket No. 50-330

.g

\\,

@

(?

~

Qy/ 'y

s/

Consumers Power Company

.j' .

ATTN:

Mr. James W. Cook

Vice President

to , ; # g \\

Midland Project

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the reutine safety inspection conducted by Mr. R. B. Landsman

of this office on March 25-27 and April 7-9, 1981, of activities at Midland

Nuclear Power Plant, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-81 and No. CPPR-82 and to the discussion of our findings with

Mr. W. R. Bird at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews

ith personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A written response, submitted under oath or af firmation, is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room.

If the enclosures contain any

information that you or your contractors believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

of fice by telephone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information. Section 2.790(b)(1) requires

\\go \\

9lI

1

81060207//

.-

.- .-

..

_.

.

.

Consumers Power Company

-2-

MAY 9

'0 01

'

that any such application must be accompanied by an affidavit executed by

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons on the

basis which it is claimed that the information should be withheld from

public disclosure. This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4). The

information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specifici periods noted above, a copy of this letter,

the enclosures, and your respouse to this letter will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-329/81-09 and

No. 50-330/81-09

cc w/encls:

Central Files

Reproduction Unit NRC 20b

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan

Public Service Commission

Myron M. Cherry

RI

RI I

RIII

{

RII ,

RII}gl

S

sard

Boyd

Nore

s

Landhan/jp

W

s

5/13/81

f >@