Text
e
o
tM Dg
g
'o
UNITED STATES
.['
,
~ ,g
NUCLEAR REGULATORY COMMISSION
<
s
REGION lli
t;
.. of
no noossvati no4o
i
c
GLEN ELLYN. lLLINOIS 60137
%, **..../
& fI1%
MM 91 1981
O
V
$ Q
d'k
('E @M N$/ C
,d,
Docket No. 50-329
h(v j
Docket No. 50-330
.g
\\,
@
(?
~
Qy/ 'y
s/
Consumers Power Company
.j' .
ATTN:
Mr. James W. Cook
Vice President
to , ; # g \\
Midland Project
1945 West Parnall Road
Jackson, MI 49201
Gentlemen:
This refers to the reutine safety inspection conducted by Mr. R. B. Landsman
of this office on March 25-27 and April 7-9, 1981, of activities at Midland
Nuclear Power Plant, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-81 and No. CPPR-82 and to the discussion of our findings with
Mr. W. R. Bird at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews
ith personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A written response, submitted under oath or af firmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
of fice by telephone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information. Section 2.790(b)(1) requires
\\go \\
9lI
1
81060207//
.-
.- .-
..
_.
.
.
Consumers Power Company
-2-
MAY 9
'0 01
'
that any such application must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons on the
basis which it is claimed that the information should be withheld from
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specifici periods noted above, a copy of this letter,
the enclosures, and your respouse to this letter will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-329/81-09 and
No. 50-330/81-09
cc w/encls:
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local PDR
Ronald Callen, Michigan
Public Service Commission
Myron M. Cherry
RI
RI I
RIII
{
RII ,
RII}gl
S
sard
Boyd
Nore
s
Landhan/jp
W
s
5/13/81
f >@