W May 21, 1981

,p

. qy-7

' ]

[.,,.. g i OU " T2 Docket No. 50-373 g

,pe;* Qj Commonwealth Edison Company Q 2,s.g$5s

j/j c

ATTN:

Mr. Cordell Reed 6?

Af bs\\/

Vice President Post Office Box 767 4

jt Chicago, IL 60690 Gentlemen:

Enclosed is a corrected page 2 to letter dated May 6, 1981. The inspection report number noted in the enclosure was erroneously typed 50-373/81-01 instead of 50-373/81-08.

We are sorry for any inconvenience this caused you.

Sincerely, R. F. Heishman, Acting Director Division of Resident and Project Inspection

Enclosure:

As stated cc w/ encl:

J. S. Abel, Director of Nuclear Licensing L. J. Burke, Site Construction Superintendent T. E. Quaka, Quality Assurance Supervisor R. H. Holyoak, Station Superintendent B. B. Stephenson Project Manager q

\\(0 Central Files Reproduction Unit NRC 20b AECD

\\ I k

Resident Inspector, RIII PDR Local PDR NSIC TIC Mary Jo Murray, Office of Assistant Attorney General RIII RIII R II RIII p RIII

/so Wat ck eimann Knop-He han 5/20/81 810 6 0 2 0f/P 4 9

f

Commonwealth Edison Company a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely, R. F. Heishman, Acting Director Division of Resident and Project Inspection

Enclosure:

IE Inspection Report No. 50-373/81-08 cc w/ encl:

J. S. Abel, Director of Nuclear Licensing L. J. Burke, Site Construction Superintendent T. E. Quaka, Quality Assurance Supervisor R. H. Holyoak, Station Superintendent B. B. Stephenson Project Matsger Central Files Reproduction Unit NRC 20b AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Mary Jo Murray, Office of Assistant Attorney General RIII RIII RIII RIII RIII i

Gwynpfso Warnick Reimann Knop Heishman j

4/Ts/81 1

.--:__.-_,