ML19352A845
| ML19352A845 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 05/29/1981 |
| From: | Utley E CAROLINA POWER & LIGHT CO. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0785, RTR-NUREG-785 NO-81-941, NUDOCS 8106020211 | |
| Download: ML19352A845 (1) | |
Text
'
File: NG-3514(B)
Serial No.: NO-81-941
^
Office of Nuclear Reactor Regulation ATTENTION:
Mr. T. A.
Ippolito, Chief e'
y Operating Reactors Branch No. 2 O'
.T !! / p N
h@)
/ 6'h I
United States Nuclear Regulatory Commission f(i Washington, D. C.
20555 f
= -. 0 2 msw -
p2 BRUNSWICK STEAM ELECTRIC PLANT UNIT NOS. 1 AND 2 y(,
v.s. weu, gy,,,
ccwu c,4 DOCKET NOS. 50-325 AND 50-324 g'p',') v c A
LICENSE NOS. DPR-71 AND DPR-62 BWR SCRAM SYSTEM 4;' : Ir#
Dear Mr. Ipeolito:
Mr. D. G. Eisenhut's April 10, 1981 letter transmitted a draft copy of SUREG-0785, " Safety Concerns Associated with Pipe Breaks in the BWR Scras System" and requested that certain generic information be pro-vided to NRC within 45 days. Carolina Power & Light Company (CP&L) is hereby responding to that request for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2.
On April 30, 1981, General Electric Company transmitted to NRC their generic evaluation of NUREG-0785 in a report entitled "CE Evalua-tion in Response to NRC Request Regarding BWR Scram System Pipe Breaks,"
NED0-24342, April, 1981. CP&L has reviewed this report and is in agree-ment with its conclusions.
Yours very truly,
%a wy
[
E. E. Utley Executive Vice President Power Supply and Engineering & Construction DCS/je (7130)
Sworn to and subscribed before me this,,:5Ns M
MU, Vilcusttu$ LSDatLQ My commission e:cpires:
[,p T/
g/
s
/ O A
t 6186020211
)