ML19352A815
| ML19352A815 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/19/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML19352A816 | List: |
| References | |
| NUDOCS 8106020176 | |
| Download: ML19352A815 (2) | |
See also: IR 05000301/1981009
Text
i
- pm asog'o
UNITED STATES
^
8
NUCLEAR REGULATORY COMMISSION
n
U
E
REGION lll
h
799 ROOSEVELT ROAD
e
GLEN ELLYN, ILLINOIS So137
o
.....
MAY 19 1981
. . - .
.q,
Docket No. 50-301
g,
,
d&
- '4 'g '
A)
Wisconsin Electric Power Company
B
0
(/
ATTN:
Mr. Sol Burstein
U
77887) 2/
--
Executive Vice President
(b
-
Power Plants
231 West Michigan
\\
['Is
Milwaukee, WI 53201
0)
(n l b
Gentlemen:
This refers to the routine safety inspection conducted by K. D. Ward of this
office on April 22, 28, and May 4, 1981, of activities at the Point Beach
Nuclear Plant, Unit 2, authorized by NRC Operating License No. DPR-27 and to
the discussion of our findings with Mr. G. Reed and others of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
,
this letter and the enclosed inspection report will be placed in the NRC's
i
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written applicatica to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
a full statement of the reasors on the basis which it is clair.ed that the
1
810 6 0 20 /R.s
_
_
.Q
.
o
M Y I O !Eii
Wisconsin Electric Power
-2-
Company
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
g
C. E. Norelius, Acting Director
Division of Engineering and Technical
Inspection
Enclosure:
IE Inspection
Report No. 50-301/81-09
cc w/ encl:
G. A. Reed, Manager
Central Files
Reproduction Unit NRC 20b
AE0D
Resident Inspector, RIII
Local PDR
John J. Duffy, Chief
Boiler Inspector