| ML19352A812 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 05/19/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19352A813 | List: |
| References | |
| NUDOCS 8106020166 | |
| Download: ML19352A812 (2) | |
See also: IR 05000373/1981018
Text
.
.
Ild -
[*aaeg%,
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
E
,E
REGION 111
.
(%
e"[
s
790 ROOSEVELT ROAD
GLEN ELLYN. ILLINOIS 80137
...**
.MM
9:981
,
/G
.q,
v'/
g
Docket No. 50-373
(
/ g@/4 ']T
Commonwealth Edison Company
m
/
ATTN:
Mr. Cordell Reed
US
Vice President
\\
Post Office Box 767
Chicago, IL 60690
,jQ,
Gentlemen:
This refers to the routine safety inspection conducted by
Messrs. K. A. Connaughton, I. N. Jackiw and D. L. Robinson of this
office on April 15, 20-23, 27-30, and May 1, 1981, of activities
at LaSalle County Station authorized by NRC Construction Permit
No. CPPR-99 and to the discussion of our findings with R. Holyoak
and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
(
of this letter and the enclosed inspection report will be placed in the
l
NRC's Public Document Room.
If this report contains any information
l
that you or your contractors believe to be exempt from disclosure under
l
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by
telephone within seven (7) days from the date of this letter of your
i
'
intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written applica-
I
tion to this office to withhold such information. Section 2.790(b)(1)
I
requires that any such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document
8106020/6(a
p
t
,
Commonwealth Edison Company
-2-
buX 1 9 S B1
_
or part sought to be withheld, and which contains a full statement of
the reasons on the basis which it is claimed that the information
should be withheld from public disclosure. This section further re-
quires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4). The information sought to be withheld
shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the
specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
. E.
oreli s, Acting Director
Division of Engineering and Technical
Inspection
Enclosure:
IE Inspection
Report No. 50-373/81-18
cc w/ encl:
J. S. Abel, Director
of Nuclear Licensing
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson
Project Manager
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local PDR
Mary Jo Murray, Office of
Assistant Attorney General