| ML19352A807 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/19/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML19352A808 | List: |
| References | |
| NUDOCS 8106020150 | |
| Download: ML19352A807 (2) | |
See also: IR 05000266/1981009
Text
.
, ,, s
'o
UNITED STATES
.__
/
NUCLEAR REGULATORY COMMISSION
y'p'si
~
o
8
.E
REGION til
'l f )',3
,
p
7se ROOSEVELT ROAD
.
Yg
o
GLEN ELLYN, ILLINOIS 60137
y.
a
>
.....
MAY ; 9 1981
k
jun OD
h3
'
'
u.s.%d
Docket No. 50-266
Y.
m
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
Gentlemen:
This refers to the special safety inspection conducted by Mr. I. T. Yin
of this office on May 7-8, 1981, at Bechtel Power Corporation, San Francisco,
California, of activities at Point Beach Nuclear Plant, Units 1 and 2,
authorized by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the
discussion of our findings with Mr. D. L. Dill at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
j
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
i
withholding; and (b) submit within twenty-five (25) days from the date of
!
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
i
!
l
r810 e 090 ISO
g
.
Wisconsin Electric Power Company
-2-
.MAY 19 1981
a full statement of the reasons on the basis which it is clairaed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit. If
we do not hear from you in this regard within the specified periods noted
abo',e, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
A
Md#I '
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosure:
IE Inspection
Report No. 50-266/81-09
and No. 50-301/81-10
cc w/ encl:
G. A. Reed, Manager
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local PDR
John J. Duffy, Chief
Boiler Inspector
'
Peter Anderson, Wisconsin's
Environmental Decade
Mr. Stanley York, Chairman