Forwards IE Insp Repts 50-266/81-09 & 50-301/81-10 on 810507-08.No Noncompliance Noted
ML19352A807
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/19/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19352A808 List:
References
NUDOCS 8106020150
Download: ML19352A807 (2)


See also: IR 05000266/1981009

Text

TIL

.

, ,, s

'o

UNITED STATES

.__

/

NUCLEAR REGULATORY COMMISSION

y'p'si

~

o

8

.E

REGION til

'l f )',3

,

p

7se ROOSEVELT ROAD

.

Yg

o

GLEN ELLYN, ILLINOIS 60137

y.

a

>

.....

MAY ; 9 1981

k

jun OD

h3

'

'

u.s.%d

Docket No. 50-266

Y.

m

Docket No. 50-301

Wisconsin Electric Power Company

ATTN:

Mr. Sol Burstein

Executive Vice President

Power Plants

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the special safety inspection conducted by Mr. I. T. Yin

of this office on May 7-8, 1981, at Bechtel Power Corporation, San Francisco,

California, of activities at Point Beach Nuclear Plant, Units 1 and 2,

authorized by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the

discussion of our findings with Mr. D. L. Dill at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

j

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

i

withholding; and (b) submit within twenty-five (25) days from the date of

!

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

i

!

l

r810 e 090 ISO

g

.

Wisconsin Electric Power Company

-2-

.MAY 19 1981

a full statement of the reasons on the basis which it is clairaed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit. If

we do not hear from you in this regard within the specified periods noted

abo',e, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

A

Md#I '

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-266/81-09

and No. 50-301/81-10

cc w/ encl:

G. A. Reed, Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

John J. Duffy, Chief

Boiler Inspector

'

Peter Anderson, Wisconsin's

Environmental Decade

Mr. Stanley York, Chairman

Public Service Commission

.

.

_

__