4

{ l0

8(f* **%q'o,,

/

UNITED STATES

NUCLEAR REGULATORY COMMISSION

n

$

,c

REGION ll

101 MARIETTA ST., N.W., SulTE 3100

(1

8

ATLANTA, GEORGIA 30303

-

%, . . . . . p

APR 271981

-

SIN)%

South Cerviina Electric and Gas Company

N.

V ,U

-

ATTN:

T. C. Nichols, Jr. , Vice President

8

,

Power Production and System Operations

[{

t

.

'

P. O. Box 764

--

W 2 91981 >

Columbia, SC 29218

.

"$2M"

i

Gentlemen:

Subject: Report No

4

This refers to the routine safety inspection conducted by E. H. Girard of this

office on March 24-27, 1981, of activities authorized by NRC Construction Permit

No. CPPR-94 for the Summer facility and to the discussion of our findings held

with 0. S. Bradham at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, intorviews with

personnel, and observations by the inspectur.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

enforcement matters.

The status of these items is discussed in the enclosed

inspection report.

One new unresolved item resulted .from this inspection and is discussed in the

enclosed report. Th;s item will be examined during subsequent inspections.

In accordance with Sectnn 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regusations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room. If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

docsment. If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

8106020 0 9 5

APR 271981

,

e

South' Carolina Electric and Gas Company

2

,

..

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

E.li,

"

T. C . ewis, Acting Director

Division of Resident and

Reactor Project. Inspection

.

Enclosure:

Inspection Report No. 50-395/81-06

cc w/ enc 1:

J. B. Knotts, Jr.

A. A. Smith, Site QA Coordinator

.

O. S. Bradham, Manager

'

Nuclear Operations