UNITE 3 STATES
f-
' ;, _
NUCLEAR REGULATORY COMMISSION .
$
-
REGION IV
%
.y
811 RYAN PLAZA DRIVE. SUITE 1000
ARLINGTON. TEXAS 76011
,,
In Reply Refer To:
RIV
Docket No. 50-382/Rpt. 81-07
Louisiana Power and Light Company
ATTN: Mr. D. L. Aswell
Vice-President Power Production
142 Delaronde Street
New Orleans, Louisiana
70174
,
Gentlemen:
'
This refers to the inspection conducted by Mr. D. P. Tomlinson of our s:aff
during the period March 24-27, 1981, of activities authorized by NRC
Construction Permit No. CPPR-103 for Waterford Steam Electric Station, !) nit
No. 3, and to the discussion of our findings with Mr. L. L. Bass and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
.
Within the scope of the inspectio'1, ao violations were identified.
During this inspection, we performed an investigation related to the arrests
of several project employees.
Results of this investigation are discussed
in paragraph 3 of the enclosed report.
Also examined were actions you have taken with regard to previously identi-
fied inspection findings. The status of these items is discussed in
paragraph 4 of the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains sny information that you believe to be proprietary, it is
,
necessary that you submit a written application to this office, within 25 days
of the date of this letter, requesting that such information be withheld from
'
public disclosure. The application must include a full statement of the reasons
why it is claimed that the information is proprietary. The application should
B'106020 W
'
~
.
.
Louisiana Power and Light
Company
-2-
April 16,1981
be prepared so that any-proprietary information identified is contained in an
'
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the 'specified period, the report will be placed in .the Public
Document Room.
Should you have any questions concerning this inspecticn, we will be pleased to
discuss them with you.
.
Sincerely,
[-
A
~
,
W. C. Seidl , Chief
Engineering , nspection Branch
Enclosure:
IE Inspection Report No. 50-382/81-07
'
,