T/C
.
[p%*o
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
~
o
$
- E
REGION 111
'
g
[
799 ROOSEVELT ROAD
%
p'
GLEN ELLYN, ILLINotS 60137
M 1 2 f.opj
Packet No. 50-373
49
ff
9
Docket No. 50-374
",
llLI f j
'
,
1
DI*
Commonwealth Edison Company
f\\ " Q','gmu e/
ATTN:
Mr. Cordell Reed
,/
Vice President
<
g
Post Office Box 767
M/
Upg'r'
Chicago, IL 60690
Gentlmen:
This refers to the routine inspection conducted by J. H. Neisler of this
office on December 9-10, 1980, of activities at LaSalle County Station,
Unit I and 2 authorized by NRC Construction Permit No. CPPR-99 and No.
CPPR-100 and to the discussion of our findings with Messrs. Gieseker and
Tapella and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A,
and a written response is required.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty-five days of the date of this letter, to withhold
such information frcm public disclosure. The a' plication must include a full
statement of the reasons for which the informs. ion is considered proprietary,
and should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
8102240ati
-
-_- .
.-
i
D
J# 'l
Commonwealth Edison Company
' ? * * .
2-
-
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
jd(' e1
~ mms:
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
.
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-373/80-54 and
No. 50-374/80-34
cc w/ enc 1:
J. S. Abel, Director
of Nuclear Licensing -
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R
H. Holyoak, Station
Superintendent
B. B. Stephenson
,
Project Manager
Cent:41 Tiles
Reproduction Unit NRC 20b
i
Resident Inspector, RIII
PDR'
Local PDR
Dean Hansell, Office of-
Assistant Attorney General
,
w
e
a
,,r
,
~
vy.
.-er,
e
,w
- . . - .- ,
- - - - ,
,y
~
r
-w--,
.
,-
,---