ML19351G487

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/80-54 & 50-374/80-34 on 801209-10 & Notice of Violation
ML19351G487
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/12/1981
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19351G488 List:
References
NUDOCS 8102240011
Download: ML19351G487 (2)


See also: IR 05000373/1980054

Text

T/C

.

[p%*o

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

~

o

$

- E

REGION 111

'

g

[

799 ROOSEVELT ROAD

%

p'

GLEN ELLYN, ILLINotS 60137

M 1 2 f.opj

Packet No. 50-373

49

ff

9

Docket No. 50-374

",

llLI f j

'

,

1

DI*

Commonwealth Edison Company

f\\ " Q','gmu e/

ATTN:

Mr. Cordell Reed

,/

Vice President

<

g

Post Office Box 767

M/

Upg'r'

Chicago, IL 60690

Gentlmen:

This refers to the routine inspection conducted by J. H. Neisler of this

office on December 9-10, 1980, of activities at LaSalle County Station,

Unit I and 2 authorized by NRC Construction Permit No. CPPR-99 and No.

CPPR-100 and to the discussion of our findings with Messrs. Gieseker and

Tapella and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A,

and a written response is required.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty-five days of the date of this letter, to withhold

such information frcm public disclosure. The a' plication must include a full

statement of the reasons for which the informs. ion is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

8102240ati

-

-_- .

.-

i

D

J# 'l

Commonwealth Edison Company

' ? * * .

2-

-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

jd(' e1

~ mms:

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

.

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-373/80-54 and

No. 50-374/80-34

cc w/ enc 1:

J. S. Abel, Director

of Nuclear Licensing -

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R

H. Holyoak, Station

Superintendent

B. B. Stephenson

,

Project Manager

Cent:41 Tiles

Reproduction Unit NRC 20b

i

AEOD

Resident Inspector, RIII

PDR'

Local PDR

NSIC

TIC

Dean Hansell, Office of-

Assistant Attorney General

,

w

e

a

,,r

,

~

vy.

.-er,

e

,w

- . . - .- ,

- - - - ,

,y

~

r

-w--,

.

,-

,---