IE Insp Rept 50-346/80-32 on 801201-05.No Noncompliance Noted.Major Areas Inspected:Security Plan Review,Security Program Audit,Security Organization & Protected Area Physical Barriers.Details Withheld (Ref 10CFR2.790)
ML19351G199
Person / Time
Site: Davis Besse 
Issue date: 02/09/1981
From: Creed J, Hind J, Madeda T, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19351G194 List:
References
50-346-80-32, NUDOCS 8102230258
Download: ML19351G199 (2)


See also: IR 05000346/1980032

Text

O

.

.

'

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-346/80-32

Docket No. 50-346

License No. NPF-3

Safeguards Group IV

Licensee: Toledo Edison Company

Edison Plaza

500 Madison Avenue

Toledo, OH 43652

Facility Name: Davis-Besse, Unit 1

Inspection At: Davis-Besse Site, Gak Harbor, Ohio

Inspection Conducted: December 1-5, 1980

Management Meeting Conducted: January 29, 1981

Date of Last Physical Security Inspection:

September 9-12, 1980

Type of Inspection: Routine, Unannounced, Safeguards

Inspectors:

f/M,r4

2

/

T. J. Madeda

/Date

Physical Security Specialist

9 $/

0

.

.

. R. Creed

~Date

Physical Security Specialist

. -

h

9 l

. L. Pirtle

'Date

Physical Security Specialist

'7 F/

"

Approved By:

.

e

Jf A. Hind, Chief

Date

Safeguards Branch

Inspection Summary

Inspection on December 1-5, 1980 (Report No. 50-346/80-32)

Areas Inspected:

Included a review of Security Plan; Security Program Audit;

Security Organization; Protected Area Physical Barriers; Vital Area Physical

810 22803 %

.

.

Barriers; Lighting; Access Control (Identification, Authorization and andging);

.

Access Control (Search); Access Control (Escorting); Access Control (Vital

Areas); Alarm Stations; Detection Aids; Assessment Aids; Communicatio .s;

Testing and Maintenrnce; Compensatory Measures; Power Supply; Response;

Locks, Keys, and Combinations; Records and Raports; and Followup on Previous

Items.c4 Noncompliance. The inspection involved 114 inspector-hours onsite

by three NRC inspectors. The inspection began during day shift period;

21 inspection hours were accomplished during offshift periods.

In addition,

the inspection involved six inspector-hours by three NRC inspectors, which

were devoted to a management meeting.

Results:

The licensee was found to be in compliance with .NHC requirements

within the areas examined during this inspection except for the following

five items of noncompliance and one deviation:

1.

Vital Area Physical Barriers:

Some vital area barriers were not

adequately resistant to penetration (Severit, Level V violatica).

2.

Access Control - Searchin,;:

Some search equipment was not used for

its intended purpose (S-verity Level V viol stian) .

3.

Access Control - Vital Areas:

Access to a vital area was not

controlled as required by the approved security plan and related

procedures (Severity Level V viclition).

4.

TeItimg and Maintenance:

Some security equipment was not tested

after maintenance was performed on system components (Severity

Level V violation).

5.

Locks, Keys and Combinations:

Security related keys were not

controlled as required by the approved security plan and security

procedures (Severity Level V violation).

6.

Locks, Keys and Combinations:

Some padlocks and lock cylinders did

not conform to guidance in accepted industry standards (Deviation).

In addition, a management meeting was held on January 29, 1981, in which

the licensee discussed steps they are taking to improve the security

program at the Davis-Besse site.

Region III also voiced the concern that

the licensee's security program must improve or additional enforcement

actions will be taken.