ML19351G188
| ML19351G188 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/09/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19351G189 | List: |
| References | |
| NUDOCS 8102230244 | |
| Download: ML19351G188 (2) | |
See also: IR 05000327/1980042
Text
.
.
{
77d
i
o
UNITED STATES
~
!"
NUCLEAR REGULATORY COMMISSION
n
5
a$
REGION 11
"o
101 MARIETTA sT., N.W., SUITE 3100
- 6 o
ATLANTA, GEORGIA 303o3
JAN 0 91981
6 l'S
s
In Reply Refer To:
RII:SDB
/[
/
_
.
/
G5,0-327/80. 42%
I7
y
)
C
--
= . - - - - -
u
Tennessee Valley Authority
- 4
I/gg7A k(1
ATTN:
H. G. Parris
Manager of Power
%r
8
500A Chestnut Street Tower II
Chattanooga, TN 37401
b
4,
Gentlemen:
This refers to the inspection conducted by S. D. Butler of this office on October 1 -
November 3,
1980, of activities authorized by NRC Operating License No. DPR-77
for the Sequoyah facility, and to the discussion of our findings held with
J. M. Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
,
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glai to discuss
them with you.
Sincerely,
.$.
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
(See Page 2)
i
8102230fW
p
-
._
.
.
.
.
i
M N 0 gigg;
Tennessee Valley Authority
-2-
Enclosure:
Inspection Report No. 50-327/80-42
cc w/ encl:
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff