Forwards IE Insp Rept 50-327/80-42 on 801001-1103.No Noncompliance Noted
ML19351G188
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/09/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19351G189 List:
References
NUDOCS 8102230244
Download: ML19351G188 (2)


See also: IR 05000327/1980042

Text

.

.

{

77d

i

o

UNITED STATES

~

!"

NUCLEAR REGULATORY COMMISSION

n

5

a$

REGION 11

"o

101 MARIETTA sT., N.W., SUITE 3100

  • 6 o

ATLANTA, GEORGIA 303o3

JAN 0 91981

6 l'S

s

In Reply Refer To:

RII:SDB

/[

/

_

.

/

G5,0-327/80. 42%

I7

y

)

C

--

= . - - - - -

u

Tennessee Valley Authority

    • 4

I/gg7A k(1

ATTN:

H. G. Parris

Manager of Power

%r

8

500A Chestnut Street Tower II

Chattanooga, TN 37401

b

4,

Gentlemen:

This refers to the inspection conducted by S. D. Butler of this office on October 1 -

November 3,

1980, of activities authorized by NRC Operating License No. DPR-77

for the Sequoyah facility, and to the discussion of our findings held with

J. M. Ballentine at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

,

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glai to discuss

them with you.

Sincerely,

.$.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

(See Page 2)

i

8102230fW

p

-

._

.

.

.

.

i

M N 0 gigg;

Tennessee Valley Authority

-2-

Enclosure:

Inspection Report No. 50-327/80-42

cc w/ encl:

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff