mc
~//
[o
oq'o
i
UNITED STATES
E 3 ,q
NUCLEAR REGULATORY COMMISSION
g
t
REGION lil
"
g
/
799 ROOSEVELT ROAD
'
g
/
cLEN ELLYN. ILLINols 6o137
- ..*
~O&g
1 2 1999
D
u p
Docket No. 50-440
(s f' d{
k
Docket No. 50-441
'
<
-
lD
l $ 198% 'f&'
I
84 %'D*Geo.,
The Cleveland Electric Illuminating
M
Company
g
y
.
,
ATTN: Dalm/n R. Davidson
g*
p'
Vice President - System
g
-
Engineering and Construction
-
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the inspection conducted by Messrs. J. E. Konklin and
J. F. Schapker of this office on December 16-19, 1980, of activities at the
Perry Nuclear Plant Project, Units 1 and 2, authorized by NRC Construction
Permits No. CCPR-148 and No. CPPR-149 and to the discussion of our findings
with M. R. Edelman, G. W. Groscup, and others of your staf f at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with hTC requirements were identified during the
course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
ecclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains informatior. that you
or your contractorr believe to be proprietary, you must app'y in writing
to this office, within twenty-five days of the date of this letter, to
withhold such information from public disclosure. The appldcation must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure
to the application.
810223 W
0
9
-
-
_
-
.
.
_
__
..
.
_
_
.
-
P3AN
t ) ' '. 31
'
The Cleveland Electric
-2-
Illuminating Company
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
.
TZe'
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Reports No. 50-440/80-28;
and No. 50-441/80-26
cc w/ encl:
Central Files
Reproduction Unit NRC 20b
Local PDR
Harold W. Kohn, Power
Siting Commission
Daniel D. Wilt, Attorney