Forwards IE Insp Repts 50-440/80-28 & 50-441/80-26 on 801216-19.No Noncompliance Noted
ML19351G173
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/12/1981
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19351G174 List:
References
NUDOCS 8102230219
Download: ML19351G173 (2)


See also: IR 05000440/1980028

Text

-

mc

~//

[o

oq'o

i

UNITED STATES

E 3 ,q

NUCLEAR REGULATORY COMMISSION

g

t

REGION lil

"

g

/

799 ROOSEVELT ROAD

'

g

/

cLEN ELLYN. ILLINols 6o137

    • ..*

~O&g

1 2 1999

D

u p

Docket No. 50-440

(s f' d{

k

Docket No. 50-441

'

<

-

lD

l $ 198% 'f&'

I

84 %'D*Geo.,

The Cleveland Electric Illuminating

M

Company

g

y

.

,

ATTN: Dalm/n R. Davidson

g*

p'

Vice President - System

g

-

Engineering and Construction

-

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Konklin and

J. F. Schapker of this office on December 16-19, 1980, of activities at the

Perry Nuclear Plant Project, Units 1 and 2, authorized by NRC Construction

Permits No. CCPR-148 and No. CPPR-149 and to the discussion of our findings

with M. R. Edelman, G. W. Groscup, and others of your staf f at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with hTC requirements were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

ecclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains informatior. that you

or your contractorr believe to be proprietary, you must app'y in writing

to this office, within twenty-five days of the date of this letter, to

withhold such information from public disclosure. The appldcation must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

810223 W

0

9

-

-

_

-

.

.

_

__

..

.

_

_

.

-

P3AN

t ) ' '. 31

'

The Cleveland Electric

-2-

Illuminating Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

.

TZe'

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-440/80-28;

and No. 50-441/80-26

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Daniel D. Wilt, Attorney

Helen W. Evans, State of Ohio