Immediate Action Ltr Re Water in East Electrical Containment Penetrations.Lists Actions to Be Performed Prior to Startup
ML19351F987
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/29/1981
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
References
IAL, NUDOCS 8102200715
Download: ML19351F987 (2)


Text

~

08iMKTETACD ON. LETn fmrgg UNITED STATES gjg 8

NUCLEAR REGULATORY COMMISSION W

j 3,

g REGION lli gg e

799 ROOSEVELT ROAD OgI GLEN ELLYN, ILLINOIS 60137 o

January 29, 1981 1

Docket No. 50-346 f..,l N

Toledo Edison Company

{ h AITN:

Mr. Richard P. Crouse d

LU Vice President 1

FED 06198;n.

Nuclear B,y v,,

]

Edison Plaza co mtu o,.

J 300 Madison Avenue

.h Toledo, OH 43652

/

7 Gentlemen:

m m

This refers to the discussions between Messrs. Murray, Carr and others of your organization and Messrs. Reyes, Rogers, Gildner, and McGregor of this affice on January 23, 1981, regarding water found in the east electrical containment penetrations.

The NRC interest and concern in this matter is substantial. There is particular interest in assuring that the source of the water is identified, that the cause of the water getting into the penetrations is understood, and that appropriate corrective actions are taken.

In this regard, it is our understanding that you will perform the following actions prior to proceeding to startup (Mode 2):

1.

Establish a program to identify the source of water found in the electrical penetrations.

(This item ir.ay require long-range activities for completion.)

2.

On a sampling basis, perform an insulation resistance test to verify no degradation of the electrical penetrations has occurred. These tests are to be performed in accordance with Section 5.1.5 of IEEE 317, 1971.

3.

Perform local leak rate testing of all 48 electrical penetrations in accordance.iith Appendix J of 10 CFR 50.

4.

Establish a method to provide assurance that the 48 electrical pene-I trations will remain dry and protected from moisture, i

5.

Establish a long-term program of insulation resistance testing to l

verify the continued acceptability of these electrical penetrations.

l

~

MD]ME Ed7ibN t.ETTER 8102e00'7{

M4E0 FATE ~KCT10N LEiTi a Toledo Edison Company January,29, 1981 The above actions will be' reviewed by NRC reprea.entatives prior to re-turning the Davis-Besse Station to power operation. The long-teria conditions of this letter (Items 1, 4, and 5)'will renain in effect until cancelled in writing by the N V Regional Office.

If these understandings are incorrect, please notify this office im:nediately.

Sincerely.

,h Lg, James G. Reppler Director cc:

Mr. T. D. Murray, Station Superintendent Central Files Reproduction Unit NRC 20b AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Harold W. Kohn', Power Siting Cocunission Helen W. Evans, State i