/03L-0:on 810129,during Power Increases,Tech Spec Limit of 13.33 Kw/Ft for Linear Heat Generation Rate Exceeded in One Node.Node Reached 13.77 Kw/Ft.Caused by Xenon Transient Resulting from Increased Core Power
ML19351F902
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/13/1981
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19351F900 List:
References
LER-81-007-03L-01, LER-81-7-3L-1, NUDOCS 8102200457
Download: ML19351F902 (1)


LER-1981-007, /03L-0:on 810129,during Power Increases,Tech Spec Limit of 13.33 Kw/Ft for Linear Heat Generation Rate Exceeded in One Node.Node Reached 13.77 Kw/Ft.Caused by Xenon Transient Resulting from Increased Core Power
Event date:
Report date:
2601981007R03 - NRC Website

text

_

f. FORM 366 U. S. NUCLEAR REGULATORY COMMISSION

.v LICENSEE EVENT REPORT CONTROL SLOC4: l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) i e

lo Ii l l Al Ll '3! R! Fl 1!h 0 l 0 l -l 0 l 0 l 0 l 0 ] 0 l - l 0 l 0 l@l 4 l 1 l 1 l 1l 1l@l l

lg I

d 3 L:CENSEE CCCE 14 15 UCENSE NUMBEM 25 26 UCENSE TYPE JG 57 CAT Sa CON'T lolii [I"CE l Lgl 0l 5l 0l 0l 0l 2l 6l 0 @l 0l ll 2 l 9l 8] 1 @l 0l 2l lj3 l8 ll l@

7 4

60 el OOCKET NUMSER 68 69 EVENT DATE 74 75 REPCRT DATE 80 EVENT DESCRIPTION AND PRC8 ABLE CONSECUENCES h 13l2; l During power increases, the technical specification limit of 13.33 Kw/ft l

go,3, l for linear heat generation rate was exceeded in one node. (T.S.3.5.J).

The l

io,4, I node reached 13.77 Kw/ft. Previous events: 50-259/8053, 50-259/8056, and 50-259/8078).

,9,3 ; 1 There was no effect on the public health or safety and no resulting significant l

93,,51 l chain of events.

l 13 ! 71 l l

lois i i l

7 8 9 80 SYSTEM

CAUSE

CALSE COMP.

VAL % E COCE CCCE SUSCODE COMPONENT CODE SUSCOCE SUSCCCE lojal l Zl Zl@ d@ l A [@ l Z l Z l Z l Z l Z l Z l@ l Zl@ ]@

7 8

9 10 11 12 13 18 19 20 SEQUENTtat OCCURAENCE REPORT 9EV'SICN EVENT VEAR REPORT NO.

CCCE TYPE NO.

@; LEA 40 18111 l-l 101017i 1/l 10131 I LI l--J 10 1 eg

_ 21 22 23 24 26 27 N

29 30 31 32 TAK N ac 09 O PLANT M

M HQURS U S8 I POR 8.

$LPP MAN FA TLRER I xl@l Z i@

l Z f@

lZI@

I0l0101 l

W@

I N I@

IZ[@

IZl9l9l9l@

33 04 05 36 3,

40 44 42 43 44 47 CAUSE CEFCRIPTION AND CORRECTIVE ACTIONS l i, a l l Unanticipated rapid power density increase due to a xenon transient which resulted l

li,,j l frota increased core power following a load decrease. Load was decreased 25 5'e.

l

,,,,, j Larger margin to limits will be maintained during xenon transients.

I li lil I l

1: 14 1 1 I

7 d 3 90 STA

%PCWER OTHER STA TUS DISCO RV OtSCOVERY 0ESCRsPTION l2 i s j l El@ l 110 l 0 l@l NA l

lAl@l STA observation.

l A TtveTV CO TENT mELEASED OF aELEASE AMCUNT op ACTivlTV LOCATION OF RELEASE l1 l6l ]@

@l NA l

l NA l

1 4 3 10 11 44 45 60 PERSONNEL F upmnES NLUeEH TvrE CESCRIPTION -

[, i 7 l l 01 01 O!@l Zl@[

NA l

,E.SONd61,ES 2ESCmencN@

New e a

{ i i. l l 01 O! 01@l NA l

i y

?

d 53 ;S ),# O A*Jauf Q 84C.L3 T v. *'

30 r*0$

A>CQ19'f';N i<iji ZV2 l NA l

' ^

j

~*l3 s

go

, [ " p.,..n h

"C d E 74L" t; j 3j l Nhl g

NA l

ll11IIIIII II li

/

4 y

c 58 69 90 i

_J A*JE OG 80ED AD E 3 PP* CN E.

810220 0%1

~

  1. 'I enhes::ee " alley Authority Form BF-17 3 rowns Ferry Nuclear Plant BF 15.2 1/10/79 LER SUPPLEMENTAL INFORMATION 3 FRO 260 / 8107 Technical Specification involved 3.5.J Repcried Under Technical Specification 6.7.2.b.2 Date f Occurrence 1/29/81 Time of Occurrence 0915 Unit 2

Iilent Qention and Description'of Occurrence:

The technical specification limit of 13.33 Kw/ft for LHGR was exceeded for one node. The nods reached 13.77 Kw/ft.

Conf piens Prior to Occurrence:

th1t 1 at 1082 We.

Lbit 2 at 1100 We.

Unit 3 at 960 We.

Acti n specified in the Technical Specification Surveillance Requirements met due tLinocerable equipment. Describe.

NA Aps:2:lt Cause of Occurrence:

A rapid xenon transient caused by power increase.

1 i

Anaiv iis of Occurrence:

There was no damage to plant equilment. There was no activity release, no personnel exposure or injury and uo danger to the health or safety of the public.

1 l

Car: etive Action:

Load was decreased by 25 Ne with recirculation control.

I

\\

Failure Data:

50-259/8053, 50-259/8056 and 50-259/8078.

l l

"P.< t en tien :

Period - Lifetime; Responsibility - Administrative Supervisor "R evisian :

[

(Jo i

1