Application to Amend Licenses DPR-44 & DPR-56,permitting Single Loop Operation Beyond 24-h,provided Specified Adjustments Are Implemented.Certificate of Svc & Affidavit Encl
ML19351F352
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/09/1981
From: Bauer E, Bradley E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19351F346 List:
References
NUDOCS 8101120304
Download: ML19351F352 (6)


Text

... ._ _ _ _ _

O

.i BEFORE THE UNITED STATES NUCLEAR nFGULATORY COMMISSION In the Matter of  :

Docket Nos. 50-277 4

PHILADELPHIA ELECTRIC COMPANY  : 50-278 APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 t

t l

Edward G. Bauer, Jr.

Eugene J. Bradley 2301 Market Street l Philadelphia, Pennsylvania 19101 i

Attorneys for Philadelphia. Electric Company l

i 810112030f

~ /

w -, +,y-__.,---,r,,. -,..-,.,3 -- __ -_ ,_ - . - , . . 7 , _ , , .,,,,_w., -

9. ., - . , , _

. e .- g y 1;e*- - '

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of  :

Docket Nos. 50-277 PHILADELPHIA ELECTRIC COMPANY  : 50-278 APPLICATION FOR AMENDMENT OF FACILITY OPERATING LICENSES DPR-44 & DPR-56 Philadelphia Electric Company, Licensee under Facility Operating Licenses DPR-44 and DPR-56 for Peach Bottom Units 2 and 3, hereby requests that the Technical Spacifications contained in Appendix A of the Operating Licenses be amended by revising certain sections as indicated by a vertical bar in the margin of attached pages 9, 9a, 10, 11, lla, 37, 40, 73, 74, 133a, 133c,

! 148, 149, and 160; and the deletion of page 140e.

The current Technical Specifications (section 3.6.F.2) for the Peach Bottom Atomic Power Station Units 2 and 3 do not permit reactor operation beyond 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with one recirculation loop out of service. The capability of operating for extended i

% - - - ~ , .

i i o,

  • periods with a single recirculation loop is highly desirable from a plant availability / outage planning standpoint, in the event maintenance of a recirculation pump or other component renders one loop inoperative.

The changes requested herein would permit single loop operation beyond 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> provided specified adjustments are implemented for the APRM rod block and scram setpoints, RBM setpoint, MCPR fuel cladding integrity safety limit, .MCPR operating limits, and MAPLHGR limits. A safety analysis of the proposed single loop operation is set forth in a document i

entitled " Peach Bottom Atomic Poder Station Units 2 and 3 Single Loop Operation, " General Electric NEDO-24229-), May, 1980, which is filed herewith and incorporated herein by reference.

Since the proposed changes to the Technical Specifications involve a single safety issue, and does not involve a significant hazards consideration, pursuant to 10 CFR 170.22, Philadelphia Electric Company, for fee purposes, proposes that the Application for Amendment be considered a Class III Amendment for Unit 2 and a Class I Amendment for Unit 3.

I l

v

} The Plant Operation Review Committee and the Operation and Safety Review Committee have reviewed these proposed changes to the Technical Specifications, and have concluded that they do not involve an unreviewed safety question or a significant hazard consideration; and will not endanger the health and safety of the i

public.

f i

Respectfully submitted, i

m ) ~

f. /

/ k hb"'} _fg' Vice President i

I e

l l

i t

I i

l l

l t

COMMONWEALTH OF PENNSYLVANIA  :

ss.

COUNTY OF PHILADELPHIA  :

S. L. Daltroff, being first duly sworn, deposes and says:

t Triat he is Vice President of Philadelphia Electric Company, the Applicant herein; that he has read the foregoing Application for Amendment of Facility Operating Licenses and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

' / . ,, ,.

f hffuj-f i Subscribed and swo n to before me this b day of g INI o .

-i.< '

N y Public LLt2ADr .H H. DOYER N'- s. , chi:a., Phila. Co.

My commi-don Expires Jan.3% 1982 a-

CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Board of Supervisors, Peach Bottom Township, York County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Albert R. Steele, Chairman of the Board of Supervisors, R. D. No. 1, Delta, Pennsylvania 17314; upon the Board of Supervisors, Fulton Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to George K.

Brinton, Chairman of the Board of Supervisors, Peach Bottom, Pennsylvania 17563; and upon the Board of Supervisors, Drumore Township, Lancaster County, Pennsylvania, by mailing a copy thereof, via first-class mail, to Wilmer P. Bolton, Chairman of the Board of Supervisors, R. D. No. 1, Holtwood, Pennsylvania 17532; all this 9th day of January, 1981.

Eugefe J. Bradl Attorney for (

Philadelphia Electric Company 9