MAIREM$ HARHEE nmml0P0i'IERCOMPARS*
gua6grajain"g*o$s Es> W!5 Tl (207) 623-35j1 i
~~
g B3.2.1 O
g j
January 7, 1981 WMY 80-166 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Office of Nuclear Reactor Regulation Robert A. Clark, Branch Chief Operating Reactor Branch No. 3
Reference:
(a) License No. DPR 36 (Docket No. 50-309)
(b) USNRC Letter, D.G. Eisenhert to all Licensee of Operating Plants, dated October 31, 1980 (c) NUREG 0737
Subject:
Emergency Core Cooling System Outages
Dear Sir:
Reference (b) transmitted Reference (c) which includes all TMI-2 related items aoproved for implementation by the commission as of October 31, 1980.
Item II.K.3.17 of Reference (b) requested a report of all ECCS outages for the last five years of operation in order to:
"... provide the staff witn a quantification of historical unreliaoility due to test and maintenance outages which will be used to determine if a need exists for cumulative outage requirements in the Technical Specification."
Enclosure (1) lists the ECCS outage data in the format requested under the
" PLAN OF EFFORT" section of Item II.K.3.17 of Reference (b).
This data includes all outages requiring execution of the time limited exception paragraphs of the Maine Yankee Technical Specifications.
Since Maine Yankee has experienced only 35 such outages with a cumulative outage time of 585 hours0.00677 days <br />0.163 hours <br />9.672619e-4 weeks <br />2.225925e-4 months <br /> in five years (43,800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />), no changes are deemed necessary to improve and control availability.
We trust the information contained herein is adequate; however, if further clarification is necessary do not hesitate to contact us.
Very truly yours, g
Maine Yankee Atomic Power Company
'y s
J. d. Randazza
//
Vice President, Operations 810;129.2/O
[
Enclosure (1) 4 DATE DURATION SYSTEM COMPONENT CAUSE ACTION TAKEN (approx)
(estimated) 01-03-76 6 Hrs.
DG DC-1A
" Loss of control power" alarm Replace defective relay 01-26-76 6 Hrs.
DG DG-1A 011 level low Add 1 bbl oil 01-26-76 6 Hrs.
DG DG-1B 011 level low Add 1 bbl oil 06-04-76 6 Hrs.
DG DG-1B Replace fuel oil filter 06-07-76 4 Hrs.
DG DG-1B Replace DC relay 08-26-76 9 Hrs.
DG DG-1B Annual PM 08-31-76 4 Hrs.
DG DG-1B Reset thermostat l
10-07-76 6 Hrs.
DG 74-DC-3 Relay failed Replace relay (DG-18) l 01-18-77 8 Hrs.
DG DG-1B Vibration Retorqued outer rim coupling bolts 01-19-77 8 Hrs.
DG DG-1B Vibration Retorqued outer rim coupling bolts 01-20-77 8 Hrs.
'DG DC-1B Vibration Retorqued outer rim coupling i
bolts f
03-04-77 2 Hr.
DG DG-1A Leak Installed new gasket on fuell filter I
03-29-77 8 Hrs.
DG DG-1B Replaced screening in' exhaust silencer 11-01-77 8 Hrs.
DG DG-1B Replaced 4 fuel filter elements 02-18-78 6 Hrs.
DG DG-1A Electric speed control Cleaned dirty pc cards malfunction (see MY LER #78-003) l
Enclosure (1)
DATE DURATION SYSTEM COMPONENT CAUSE ACTION TAKEN (approx)
(estimated) 03-02-78 1 Hr.
HPSI P14A Bearing failure during test Spare pump aligned. Pump repaired. (See MY LER
- 78-007) 09-25-78 8 Hrs.
DG DG-1B Governor control sluggish Air in fuel line. Line vented. (see MY LER#78-023) 10-10-78 4 Hrs.
DG DG-1A WO Pressure Alarm during Tighten swedge lock fitting surveillance 08-23-78 tighten oil line fitting 12-05-78 6 Hrs.
DG DG-1B Governor oil level increased Inspection only after diesel run 03-07-79 1 Hr.
HPSI HSI-M-54 Failed to operate during test.
Reset torque switches Improper torque switch setting (see MY LER# 79-006) 03-07-79 1 Hr.
CS CS-M-66 Failed to operate during test Reset torque switches due to improper torque switch (see MY LER# 79-006) setting 06-29-79 8 Hrs.
DG DC-1B Lube oil pump shaft coupling, replaced 10-16-79 6 Days DG DG-1B Turbocharger Fire Replaced turbocharger.
Changed engine drive fuel oil pump filters (see MY LER# 79-026) 10-22-79 8 Hrs.
DG DG-1B Replace 4 fuel oil filters 10-23-79 8 Hrs.
DG DC-1B Replace 2 fuel oil filters 10-25-79 8 Hrs.
DG DG-1B Electric governor motor loose Remove motor-clean screws, on mounting etc., reinstall motor 11-05-79 3 Days DG DG-1A Poor contact connections in Repair / replace / clean control circuit contacts 11-17-79 8 Hrs.
DG DG-1B Vibration Replaced generator fan bearings, replaced blower shaft bearings
Enclosure (1)
P OATE DURATION SYSTEM COMPONENT CAUSE ACTION TAKEN (approx)
(estimated) 12-10-79 3
DG DG-1A Turbocharger fire in DGlB Replaced turbocharger to prevent similar failure l
04-08-80 30 Min LPSI LSI-M-31 Failed to operate during Valve cycled daily for 4 surveillance days satisfactorily (see MY LER# 80-009) l 05-06-80 30 Min LPSI LSI-M-31 Broken weld in coupling of Placed valve in open l
operating extension shaft position. Repaired valve (see MY LER# 80-112) r 08-05-80 8 Hrs.
DG DG-lO Pinhole leak in copper gage Replaced copper tubing line from htx 08-26-80 2 Hrs.
DG DG-1B Trip during surveillance run Overspeed actuating arm
( e MY LE #80bl8) 09-25-80 6 Hrs.
DG FL-30B Filter leak Replaced filter, o' ring DG-1B I
09-26-80 6 Hrs.
DG DG-1B Woodward governor oil leak Tightened 8 screws on front plate t
i h