ML19351F017
| ML19351F017 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/19/1980 |
| From: | Baynard P FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 3-110-11, IEB-80-23, NUDOCS 8012240232 | |
| Download: ML19351F017 (1) | |
Text
.-.
/ N NOV24 gggg t.'g W
Power CD R PO m A i vo%
November 19, 1980 File: 3-0-3-a-4 1a
- 3-110-11 p
o 1
Mr. J. P. O'Reilly y
c.;,
Director
~~ m >
-3 Office of Inspection and Enforcement 3
l 14 U.S. Nuclear Regulatory Commission M
3 Suite 3100 0;
u e
101 Marietta Street Atlanta, GA 30303
SUBJECT:
Crystal River Unit 3 DocketNo.(50-302J Operating License No. DPR-72 IE Bulletin 80-23: FAILURES OF SOLEN 0ID VALVES MANUFACTURED BY VALCOR ENGINEERING CORPORATION a
Dear Mr. O'Reilly:
In response to the subject bulletin, we have determined that no Valcor Solanoid Valves having P/Ns V70900-21-1 or -3 are in use in safety-related applications at Crystal River Unit 3.
Therefore, no additional information will be pro,vided.
As you requested, the manhours expended on this bulletin in conduct of review and preparation of the report is 20 manhours.
Very truly yours, FLOPIDA POWER CORPORATION Patsy Y. Baynard Manager Nuclear Support Services Lobo (W02)D-8-3 cc: Director Office of Inspection and Enforcement Division of Reactor Operations Inspection U.S. Nuclear Regulatory Commission 8 012 240 2.3 2,#MAI'U'l'Y Washington, DC 20555 General Office 3201 Tn.rty.tourth street soutn. P O Box 14042. St Petersburg. Florida 33733 e 813--866-5151
,__y-
. _. -. -