ML19351F000

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-348/80-28 on 800916-19.No Noncompliance Noted
ML19351F000
Person / Time
Site: Farley 
Issue date: 11/14/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19351F001 List:
References
NUDOCS 8012190708
Download: ML19351F000 (2)


See also: IR 05000348/1980028

Text

-

n.

'

d

o

8

^g

UNITED STATES

3

..

E

' .E

NUCLEAR REGULATORY COMMISSION

n

l

Y

'

REGION 11

%.%a

8

101 MARIETTA sT.. N.W., sulTE 3100

....j

ATLANTA, GEORGIA 30303

In Reply Refer To:

rip T W

m

(5'0-348/80-28j

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers

Performance Appraisal Branch on September 16to the inspection cond

s office on the

tuthorized by NRC License No. NPF-2 for th

through 19, 1980 of activities

,

sion of our findings held with W. G. Hairston, III at the conclusion of the

inspection.

e

the NRC Performance Appraisal Branch concerning thT

ons baing conducted by

c

components.

e control of safety-related

Areas examined during the

enclosed inspection report. inspection and our

Within these areasfindings are discussed in the

selective examinations of procedures and represen,tativethe inspection consisted of

personnel, and observations by the inspector.

records, interviews with

Within the scope of this inspection, no items of noncom li

p ance were disclosed.

cnclosed report.One new unresolved item resulted from this inspecti

This item will be examined during subsequent inspectionson and is d

Title 10, Code of Federal Regulations, aIn accordance with Se

,

.

l

" Rules of Practice", Part 2,

l

in:pection report will be placed in the NRC's Publicopy of this letter and the enclosed

report contains

c Document Room.

If this

prcprietary, it is necessary that you make a written applic tiany inf

o be

to this office to withhold such information f

on within 20 days

a

cpplication must

it is claimed that the information is propri tinclude a full statement of th

l

asis of which

th t proprietary information identified in the applie ary, and should be prepared so

i

ccp: rate part of the document.

cation is contained in a

tha specified period, the report will be placed in thIf we do not hear from you in this

l

e Public Document Room.

l

t

_

..

-

_ - -

-

. - - .

.

.

.

hui i siscV

Alabama Power Company

-2-

.

, , , , ,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

$4~ s< -

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure: Inspection Report

No. 50-348/80-28

cc w/ enc 1:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

O. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-0perations

Quality Assurance

W. G. Hairston, III, Plant Manager

,

L

-