ML19351E982

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-336/80-18 on 800923-26.No Noncompliance Noted
ML19351E982
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/14/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19351E983 List:
References
NUDOCS 8012190652
Download: ML19351E982 (2)


See also: IR 05000336/1980018

Text

^Y1<-

.

.

/" %

UNITED STATES

$

21[.t.3

., w

NUCLEAR REGULATORY COMMISslON

REGION I

e

'g

631 PARK AVENUE

7

af

KING OF PR US$1 A, FENNSYt.V ANI A 19406

OCT 141980

Docket No. 50-336

,

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection No. 50-336/80-18

This refers to the routine inspection conducted by Mr. R. Paolino of this office

on September 23-26, 1980, at the Millstone Nuclear Power Station, Unit 2, located

at Waterford, Connecticut of activities authorized by NRC License No. DPR-65 and

to the discussions of our findings held by Mr. R. Paolino with Mr. E. Mroczka and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner of the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addresses with specificity the items

which will be considered by the Comission as listed in subparagraph (_b) (_4) of

Section 2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

!

5 ? k. 0 0

$

--

.

.

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

Robert T. Carlson ~ Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement

Inspection Report No. 50-336/80-18

cc w/ encl:

J. F. Opeka, System Superintendent Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Ergineer

4

1

.

--v-