Text
YA
.
.
c[
4
UNITED STATES
.[4
'l
NUCLEAR REGULATORY COMMISslON
dim
o
REGION 1,
7.
b.
yI
sai paax aveNur
(j f
xiNo or paussia. PENNSYLV ANI A 19406
- '
OCT 2 4 E10
Docket No. 50-423
-
Northeast N'.cisar Energy Company
ATTN: Mr. W. G. t.ounsil
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection No. 50-423/80-07
.
This refers to the routine inspection conducted by Mr. R. Feil of this office on
October 7-9, 1980 of activities authorized by NRC License No. CPPR-ll3 at Millstone
Nuclear Power Station Unit No. 3, Waterford, Connecticut and to the discussions
of our findings held by.Mr. Feil with Mr. S. Toth of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
4
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the infonnation, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790. The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
,
!
Document Room.
l
l
l
f
!
,
I
gg)1219 0
.
--
-
.,-e
m
y-,
y
,
-
.
.
.
.
.
ibrtheast Nuclear Energy Company
2
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
-
.
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
-
Enclosure: Office of Inspection and Enforcement Inspection
Report No. 50-423/80-07
cc w/ encl:
K. W. Gray, Supervisor of Construction Quality Assurance
H. R. Nims, Director of Nuclear Projects
E. J. Mroczka, Station Superintendent
J. R. Himmelwright, Licensing Safeguards Engineer
D. G. Diedrick, Manager of Quality Assurance
.