Forwards IE Insp Rept 50-423/80-07 on 801007-09.No Noncompliance Noted
ML19351E895
Person / Time
Site: Millstone 
Issue date: 10/24/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19351E896 List:
References
NUDOCS 8012190506
Download: ML19351E895 (2)


See also: IR 05000423/1980007

Text

YA

.

.

c[

4

UNITED STATES

.[4

'l

NUCLEAR REGULATORY COMMISslON

dim

o

REGION 1,

7.

b.

yI

sai paax aveNur

(j f

xiNo or paussia. PENNSYLV ANI A 19406

        • '

OCT 2 4 E10

Docket No. 50-423

-

Northeast N'.cisar Energy Company

ATTN: Mr. W. G. t.ounsil

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection No. 50-423/80-07

.

This refers to the routine inspection conducted by Mr. R. Feil of this office on

October 7-9, 1980 of activities authorized by NRC License No. CPPR-ll3 at Millstone

Nuclear Power Station Unit No. 3, Waterford, Connecticut and to the discussions

of our findings held by.Mr. Feil with Mr. S. Toth of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

4

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the infonnation, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

,

!

Document Room.

l

l

l

f

!

,

I

gg)1219 0

.

--

-

.,-e

m

y-,

y

,

-

.

.

.

.

.

ibrtheast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

-

.

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

-

Enclosure: Office of Inspection and Enforcement Inspection

Report No. 50-423/80-07

cc w/ encl:

K. W. Gray, Supervisor of Construction Quality Assurance

H. R. Nims, Director of Nuclear Projects

E. J. Mroczka, Station Superintendent

J. R. Himmelwright, Licensing Safeguards Engineer

D. G. Diedrick, Manager of Quality Assurance

.