Ack Receipt of & Requests Addl Info Re Measures to Assure That Variations from Equipment Design Requirements Receive Equivalent Level of Review as Original
ML19351E873
Person / Time
Issue date: 10/21/1980
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Guilbert D
BABCOCK & WILCOX CO.
Shared Package
ML19351E858 List:
References
REF-QA-99900400 NUDOCS 8012190476
Download: ML19351E873 (1)


Text

_ _ _ _ - _ _ _ _ _

UNITED STATES

.# "%g%,

NUCLEAR REGULATORY COMMISSION J'

[

"b s.

611 RY AN PLAZA DRIVE. 5UITE t000 f Y R EGION IV e

}g

,[, f AALINGTON. TE.XAS 76012

,r e ;

%,..../

210CT 1980

~1 Occket No. 99900400/80-02 Babcock & Wilcox Ccmpany Nuclear Power Generation Division AE4: Mr. D. E. Guilbert Vice President & General Manager P. O. Box 1260 Lynchburg, VA 24505 Gentlemen:

Tnank you for your letter of September 12, 1980, in response to our letter dated August 15, 1980. As a result of our review, we find that additional infonnation is needed. Specifically, with respect (1) Deviation A.3, concerning your preventive measures, please to:

identify the maximum interval between audits of the HDL considered acceptable by NPGD Quality Assurance; and (2) Deviation B, please de-scribe the measures that NPGD will implement to assure that a CVAR which results in a design change will receive the equivalent level of review and approval as the original design when the system requirements are not violated by the CVAR, (e.g. a Category 2 CVAR).

Please provide this additional infonnation within twenty (20) days in order that we may complete our review in a timely manner.

Sincerel

.x i

y.

L 64 j kOT Uldis Potapovs, Chief; Vendor Inspection Branch i

l u 76 l

8012190 L

. _,. _