ML19351E873
| ML19351E873 | |
| Person / Time | |
|---|---|
| Issue date: | 10/21/1980 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Guilbert D BABCOCK & WILCOX CO. |
| Shared Package | |
| ML19351E858 | List: |
| References | |
| REF-QA-99900400 NUDOCS 8012190476 | |
| Download: ML19351E873 (1) | |
Text
_ _ _ _ - _ _ _ _ _
UNITED STATES
.# "%g%,
NUCLEAR REGULATORY COMMISSION J'
[
"b s.
611 RY AN PLAZA DRIVE. 5UITE t000 f Y R EGION IV e
}g
,[, f AALINGTON. TE.XAS 76012
,r e ;
%,..../
210CT 1980
~1 Occket No. 99900400/80-02 Babcock & Wilcox Ccmpany Nuclear Power Generation Division AE4: Mr. D. E. Guilbert Vice President & General Manager P. O. Box 1260 Lynchburg, VA 24505 Gentlemen:
Tnank you for your letter of September 12, 1980, in response to our letter dated August 15, 1980. As a result of our review, we find that additional infonnation is needed. Specifically, with respect (1) Deviation A.3, concerning your preventive measures, please to:
identify the maximum interval between audits of the HDL considered acceptable by NPGD Quality Assurance; and (2) Deviation B, please de-scribe the measures that NPGD will implement to assure that a CVAR which results in a design change will receive the equivalent level of review and approval as the original design when the system requirements are not violated by the CVAR, (e.g. a Category 2 CVAR).
Please provide this additional infonnation within twenty (20) days in order that we may complete our review in a timely manner.