ML19351E775

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-456/80-13 & 50-457/80-12 on 801022-23.No Noncompliance Noted
ML19351E775
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/13/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19351E776 List:
References
NUDOCS 8012190221
Download: ML19351E775 (2)


See also: IR 05000456/1980013

Text

(.

.

- _

_

.-

k# EIG

'o

UNITED STATES '

'/

g

E " ) ., ,

g

NUCLEAR REGULATORY COMMISSION

/

M 3 '-

c

REGION 111

% . .. .. o[

'

%

799 ROOSEVELT ROAD

b

GLEN ELLYN, ILLINOIS 60137

NOV 13 1980

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. C. M. Erb of this office

on October 22-23, 1980, of activities at Braidwood Station Units 1 and

2 authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133

and to the discussion of our findings with Mr. Sommerfield and others

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

'

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary in-

formation identified in the application is contained in an enclosure to

the application.

v

w

t* )

w

x3

-

I.

~~~

E.--

T-:

w* R

r2

d, y ~.T

'

n-:2

a

I,'*

- ':

Eu

E

.

,

?$

t.)

l

E4

's

,

S

G.

t:

g

e

80.12190 M

g

e

Commonwealth Edison Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

'?tW

G. Fiore11i, Chief

Reactor Contruction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-456/80-13

and No. 50-457/80-12

cc w/ encl:

Mr. J. S. Abel, Directo;

of Nuclear Licensing

Mr. R. Cosaro, Project

Superintendent

Mr. V. I. Schlosser

Project Manager

Mr. J. F. Guadac

Station Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

1

Assistant Attorney General

i

1