Text
.
.
_
. - .
-
.
-
.
.
-
.
-
.
.
- f
o
UNITED STATES
.
g
^o
!
NUCLEAR REGUt.ATORY COMMISSION
o
$
,E
REGION 111
o,g
. /[
,
'
799 ROOSEVELT ROAD
Uf
e
GLEN ELLYN. lLLINOIS 60137
%
- "
)(OV. 4
080
M
N
q
ca t
ie2
$h
i
-
.
_3,
%
!
i:s
N
W
,
rn
i
Docket No. 50-10
t><
E
I
Docket No. 50-237
Docket No. 50-249
4
,
}
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
,
Vice President
1
Post 0ffice Box 767
Chicago, IL 60690
l
Gentlemen:
i
This refers to the inspection conducted by Messrs. T. M. Tongue and
M. J. Jcrdan of this office on September 7, through October 3, 1980,
of activities at Dresden Nuclear Power Station, authorized by NRC
Operating Licenses Na. DPR-2, No. DPR-19 and No. DPR-25 and to the
discussion of our findings with Mr. D. Scott .:nd others of your staff
at the conclusion of the inspection.
,
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with person'nel.
'
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix
A.
The itern in the Notice of Violation enclosed with this letter is a
recurrent ite.i (second occurrence during the past five months) and was
discussed with Mr. Scott and others of your staff during interim discus-
sions of our inspection findings on September 19 and 26,1980.
In your
response to this letter please give this matter your particular attention.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part.
2, Title.10, Code of Federal Regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
Public Document Room, except as follows.
If the enclosures contain
i
information that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twenty days of your receipt
'
'
of this letter, to withhold such information from public disclosure.
i
l
i
'
801210'05P7
@
.
.
.
.
.
.-
.
-
- . - -
.
Commonwealth Edison Company
-2-
M()y 4
ggg
-
The application must include a full statement of the reasons for which
the information is considered proprietary, and should be prepared so
that proprietary information identified in the application is contained
in an enclosure to the application.
We vill gladly discuss any questions you have concerning this inspection.
Sincerely,
ip +s sj
. F. Heishman, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice
of Vioation
2.
IE Inspection Reports
No. 50-10/80-19,
No. 50-237/80-21 and
No. 50-249/80-25
cc w/ encl:
Mr. J. S. Able, Director
of Nuclear Licensing
Mr. D. J. Scott, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Resident Inspectors, RIII
Local PDR
Mr. Dean llansell, Office of
Assistant Attorney General