Text
-
o POWER AUTHORITY OF THE STATE OF NEW YORK to COLUMeus CIRCLE NEW YoRx. N. Y. too19 (2123 397 6200 G EO ",G,5,,7,,",E,""Y
' ' ' " ^ ' ' " * ' ' ' ' ' ' "
TRUSTEES g'cyfivg y eg JOHN 5.DYsON g
O'n" "; ;,*.'"%*,".
JOSEPH R. SCHMIEDER vsCE CMel AMAN EXECUYtVE VICE RICHARD M. PLYNN we aan December 4, 1980
'5" !,'"co','",c',^1...,
Ro.ERT. wiLLouri e
PREDERfCK R. CLARK JPN-80-55 3,*,%',',"" ^"*
'****'"d,*.','........,
& GEpeERAb COUNSEL Director of Nuclear React
,egulation U. S. Nuclear Regulatory connission Washington, D. C.
20555 Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Interim Criteria for Shift S^1ffing
Dear Sir:
This letter responds to your July 31, 1980 letter, as amended in NUREG-0737 Section I.A.l.3, regarding shift staffing and overtime restrictions for key watchstanding p,ersonnel.
The Authority will revise again its administrative pro-cedure to meet the new overtime restrictions.
In. order to meet the staffing and overtime requirements, additional operat-ing positions (e.g., ROs, SROs) have been created.
These positions will be filled by systematically upgrading, through training, the current plant staff.
Additional personnel newly hired will be used to replace the positions vacated.
This action plan consists of four sequential phases, as described below.
1.
Hiring of Non-Licensed Operators The Authority is in the process of hiring nine (9) non-licensed operators.
The time required to complete the hiring process is not expected to
/o p; c/
, exceed 12 weeks.
o
=
4 n
3 2 4 Training of Non-Licensed Operators
/ O
' M his program will commence immediately after com-
'~
pletion of the hiring process.
It will consist
~
of three weeks of power plant fundamentals, chree
' weeks of plant design orientation, and six weeks c:
of structured on-the-job training, totalling 12 weeks.
8012100@7.
(
.. 3.
Selection and Training of Licensed Operators This program will commence immediately after com-pletion of the second phase.
Trainees to become licensed operators will be selected either from the new hires, trained in phase 2 above, or current plant personnel.
It will consist of:
10 weeks of power plant fundamentals 2 weeks of university reactor training 10 weeks of plant' design and orientation 12 weeks of control room operations training 2 weeks of simulator hot license certification 4 weeks of intensive review and evaluation 3 weeks of self-study and USNRC examinations 4 weeks of holidays and vacation.
Added to the 47 weeks cited above is an estimated six weeks period for exanination processing by the USNRC, totalling 53 weeks.
4.
Senior Operator Upgrade Training 1
This program will commence immediately after com-pletion of phase 3 above.
It will consist of four weeks of technical training, 12 weeks of on-the-job training, and one week of-USNRC examinations.
Review and evaluation will be conducted concurrently with on-the-job training.
To this time must be added an estimated six weeks for examination processing by the USNRC, totalling 23 weeks _.
This action plan requires 100 weeks to complete and thus cannot be completed before November 3, 1982 - approximately 16 weeks beyond the deadline for completion of July 1, 1982.
However, we consider that this plan is the most effective and expeditious manner to' comply with the staffing need of the Fitzpatrick Plant since it allows maximum use of trained and experienced operations personnel.
,e..
.-w-w-.
4 k
b,
T.
Should you have any questions regarding this matter please
. do not hesitate to-contact this office.
t Very truly-yours, h
j'
,(
t
. t.
I Senior Vice. President b Nuclear Generation
(
)
I i
1 a
1 a
f W~
e b
4 4
s
. -,..~
_ _