Text
_ _ _. _ _ _ _
O O
So-y
~
~
Re-
~
l
% t's yyj I
//
{
~/
,'/
.,y YANKEE NUCLEAR POWER STATION
.._;'/
OPERATION REPORT NO. 121 For the Month of January 1971 l
~
l t
l Submitted by YANKEE ATOMIC ELECTRIC COMPA!N l
Westboro Massachusetts February 19, 1971 759 801]260 as
______m o
O This report covers the operation of the Yankee Atomic Electric Company at Rowe, Massachusetts for the month of January,1971.
During the period, plant load varied between 183 7 MWe and 185.0 MWe as the circulating water inlet temperature fluctuated only between 39 F and 36 F.
The first, Core IX vapor container air charge surveillance j
period continued through the report period.
Leakage of air during the period was normal.
Plant Abnormal Occurrences There were no plant abnormal occurrences durin6 the report period.
Plant Load Reductions 2
January 6 (11h0-1315):
Load reduction to 140 MWe for throttle valve exercising.
January 15 (1200-1230):
Load reduction to 177 MWe for control va]ve exercising.
[
January 22 (1200-1230):
Load reduction to 177 MWe for control valve r
exercising.
l l
t January 27 (1900-19h0):
Load reduction to lho MWe due to 115 KV line disturbances.
January 28 (1145-1230):
Load reduction to 177 MWe for control valve exercising.
Plant Shutdowns There were no plant shutdowns during the report period.
Plant Maintenance The following is a list of pertinent maintenance items performed uy the plant staff during the month of January, 1971.
1.
The No. 1 and No. 3 charging pumps were repacked. Two refurbished plungers were installed in the No. 3 pump.
2.
A new pinion was installed in the turbine turning gear assembly.
3.
Cleaning and tolerance gauging of pitch diameter of the spare set of reactor head to veseel closure studs was performed during the pe.-iod.
'12,0 u,
e O
Instrumentation and Control The following is a list of pertinent instrumentation and l
control maintenance items performed by the plant staff during the-month of January,1971.
l.
A spare triaxial cable penetration for the vapor container was assembled and tested.
1 j
2.
'.derformed routine maintennnee on in-core flux measurement equipment.
i i
Reactor Plant Performance The following parameters were detemined by means of incore instrumentation:
599.3 MWt; 525.8 F Tavg; Control Rod Group A @ 79, B,C,D @ 87 ;
1304 ppm boron.
F
= 2.1 q
F AH 1
Minimum DNBR 3.3 O
=
Maximum Outlet Temperature 592.8
=
Secondary Plant Perfomance Feedvater heater teminal differences were as follows:
5.8 F No. 2 6.9 F No. 1 7.5 No. 3
=
=
=
The condenser perfomance was as follows:
'184.6 MWe; 1.46" Hg.B.P.;
599.5 MWt; 39.1 F C.W.in; TTD = 31.23 F; cleanliness factor = 71.0%.
Chemistry The main coolant boron concentration was reduced from 1363 ppm to 1178 ppm during the period to compensate for core depletion.
(
)
The main coolant pH averaged 5.10 during the period.
The main coolant beta-gamma specific activity and crud level averaged 1.25 x 10-1 ue/ml and 0.06 ppm, respectively.
During the report period main coolant tritium increased fron.
2.33 ue/ml to 3.91 ue/ml.
l 1
m
The iodine-131 specific activity averaged 5.87 x 10 ue/ml and O
the iodine 131/133 atomic ratio averaged 1.81 indicating the presence of minor fuel defects.-
A crud sample for the month, collected on January 20, had the following radiochemical anlyses: dpm/mg crud Mn-Sh Fe-59 Cr-51 6 6
6 7.49 x 10 3.56 x 10 3.29 x 10 i
Co-58 Co-60 Ag-110M 5
5 l
2.44 x 10 5.25 x 10 5.22 x 10 i
A main coolant gas sample collected _on January 20 had the following radiochemical analyses: ue/cc gas Xe-133 Xe-135 Ar h1 -1
-1 2.66 x 10 1.43 x 10 2.63 x 10 l
Health and Safety
{
Waste disposal 1iquid releases totalled 61,010 gallons containing
~
0.056 me of gross beta-gamma activity and 145.79 curies of tritium.
Gaseous releases during the period totalled 391.6 me of gross beta-gamma activity. Secondary plant water discharged totalled 403,405 gallons containing 0.035 me of gross beta-gamma activity and 0.h50 curies of O
Radiation exposure doses for Yankee plant personnel as measured b7 film badge -for the month of January,1971 vere as follows:
Average accumulated e.xposure dose: 75 mren Maximum accumulated exposw e. iose: 300 mrem The following is a summary of all liquids, gases, and solids released, discharged,-or shipped from the plant during the year 1970.
Waste Disposal Liquid:
814,532 Gallons containing a total beta-gamma activity of 0.692 me, and 1,211.63 curies of tritium.
I
-Gas:
A total beta-ganaa activity of 17.220 curies, and 9.012 curies of tritium.
Airbor.ne Particulate: A total of 1.82 ue of beta-gamma activity.
Solids for Disposal:
5 24 drums containing_a total activity of 5.}36 cu:*ies; and 30 cubic feet of miscellaneous vaste with a total activity of.013 curies.
'j l
i l
a
_4 Secondary Plant and Miscellaneous i
Liquid h,188,078 gallons containing a total beta-gamma activity of 33.15 me, and 279.79 curies of tritium.
Fuel Shinments j
During 1970 there were two shipments of spent fuel totalling 18' assemblies with a total activity of 26.95 megacuries.
Operations i
Attached is a summary of plant operating statistics and a plot j
of daily average load for the month of January, 1971.
1 O
f'
- -, - - - - - - -. - - - - - - - - ~ ~
- n
YANKEE ATOMIC ELECTRIC COMPANY - OPERATING SU?&ARY January 1971 ELECTRICAL, MONTH YEAR TO DATE Gross Generation KWH 137,059,600 137,059,600 11,632,930,900 Sta. Service (While Gen. Incl. Losses)
IOGI 8,152,089 8,152,089 756,177,11h Net Output KWH 128,907,511 128,907,511 10,876,753,786 Station Service 5.95 5.95 6.50 Sta. Service (Wh'.le Not Gen. Incl. Losses) KWH 0
0 32,288,855 h
Ave. Gen. For Month (7h4)
KW 18h,219.9 Ave. Gen. Runnin;;
(Thh)
KW 184,219 9 PLANT PERFURMANCE Net Plant Efficiency 28.98 28.98 28.h9 Net Plant Heat Rate btu /KWH 11,776 11,776 11,979 Plant Capacity Factor 99.66 99.66 75.29 E'
Reactor Plant Availability 100 100 84.09 NUCLEAR MONTH CORE IX TOTAL Hours Critical HRS Thh 1,548.36 76,512.76 Times Scrammed 0
1 62 h
Burnup Core Average M4D/MfU 892.33 1,788.33 Region Average M4D/MTU A (INNER) 868.92 1,677.13 18,880.80 B (MIDDLE) 1,055.07 2,107.30 10.849 15 C (OUTER) 732.39 1,481.27 1,h81.27 D (ZIRCALOY) o
{
,ljl.:,
1 it.
!:l4
,l I
,iijl
- !i'!I l3l I1 1
- I i_
..O ima i
0 3
i i
i
=
i 5
g m.
2 i
i 0
2 Y
NL i
P M
0 S
i Y
h A
D i
D A
D 1
I 7
i T
9 E
1 E
G 5
I A
r y
1 E
R o
r E
f a
i C
V u
I A
n M
a e
O Y
J i
T L
A I
i A
D
_. F i
IA 0
Y 1
~
i i
i i
5 i
e i
i 2
o 0-0 o
0-0 S
2 1
i r
nM OmO - Q.$ 1fPa$ Uta 1
t j,1;ie-
, : F' ;!,I1 1'
,1;41 i <'
- i!
i!:1l i:'
)i
o o
co n 3
o 9
i a
A B
C D
E F
G H
J K
y XXXX 2NXX X X/**,
XX XX s
N/ h/
N/ 'N/
4
/N / N
/N /N nM ><
sssM
';X A
~X LW X'
c 7
\\/N/
'\\/'N/
/N /N
/N/N XX XX o
N 7 N/'N*A f '/N/ N/
'q
/N /N
/N/N rg
\\/ \\/ \\/
Sectou
/N/N/N c m
- ennicuue, A
A
- .so z
.s.
l B
4.9'42
>(/ C 4.94 %