i 50- 2s YANKEE NUCLEAR POWER STATION J
OPERATION REPORT NO. 126 D"*cd * ** * *
- M I'J [' 'N 4
i For the Month of i
June 1971
'l l
1
- l i
1 ll i
i I
- l 1
I Submitted by YANKEE ATOMIC ELECTRIC COMPANY l
Westboro Massachusetts July 28, 1971
l f...
l l
i.
l This report covers 'the operation of the Yankee Atomic Electric
' Company at Rowe, Massachusetts for the month of June, 1971.
At the start of the period, plant load was 180.0 MWe. One scheduled plant shutdown occurred on June 5 for the purpose of mechanical and instrumentatica maintenance. Load reduction was commenced at 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br />, and the turbine generator was separated from the high line at 0813 hours0.00941 days <br />0.226 hours <br />0.00134 weeks <br />3.093465e-4 months <br />. Following completion of the maintenance period.the turbine generator was phased to the high line at 20h2 hours. The reactor power level, which was 485 MWt at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on June 5, was increased to 600 MWt on May 6 at 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br />. During the balance of the report period plant load varied between 176.3 MWe and 182.8 MWe as the circulating l
vater inlet temperature fluctuated between 62 F and h90F.
0 l
The fifth, Core IX vapor container air leakage surveillance I
period was commenced on June 1, and continued through the report period j
with normal leakage noted.
Plant Abnormal Occurrences l
~1 There were no plant abnormal occurrences during the month of June, 1971.
l Plant Load Reductions l
l l
June 3 (11h5-1220):
Plant load reduction to 175 MWe for turbine control i
valve exercising.
I June 8 (1550-1758):
Plant load reduction to lh5 MWe due to electrical storm.
June 9 (1150-1225):
. Plant load reduction to 175 MWe for turbine control
{
valve' exercising.
l June 16 (1145-1215):
Plant load reduction to 175 MWe for turbine control valve exercising.
l June 21 (1143-1215):
Plant load reduction to lh5 MWe due to electrical storm.
1 June 23 (1143-1215):
Plant load reduction to 175 MWe for turbine control
. valve exercising.
i l
June 25 (1945-2150):
' Plant load reduction to 145 MWe due to electrical storm.
l Plant Shutdowns Shutdown No. 116-9-71: 6/5/71, plant shutdown for plant maintenance. Total outage time: 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, 29 minutes.
9
.,,__..___,.___,__..I__
.,L,.__,__.___
a Plant Maintenance The following is a list of pertinent maintenance items performed by the plant staff during the month of June, 1971.
1.
A new impeller and end plate were installed on the gravity drain tank No. 1 pump.
2.
The No. 1 chargin3 pump ves repacked.
3.
During the June 5 shutdown period the following maintenance items were performed:
Vibration readings were taken of all four main coolant pumps.
a.
All readings were normal.
b.
The upper bearing was replaced on the No. 1 circulating water pump.
The inboard gland on the No. 3 boiler feed pump was repacked.
l c.
d.
The generatcr exciter commutator was stoned during turbine coast-down.
Instrumentation and Control l
The following is a list of pertinent instrumentation and control i
maintenance itema performed by the plant staff during the month of June, 1971.
1.
The pressurizer temperature selector switch was replaced.
2.
The high temperature shutoff switch for the No. 2 control air compressor was replaced.
Reactor Plant Performance l
The following parameters were determined by means of incore instrumentation:
598.3 MWt; 525.8 Tave; Control Rod Group A @ 813, B,C,D, @ 88 ;
560 ppm boron F
= 1.9 q
F
= 2.0 gy Minimum DNER = 3.5 Maximum out'"t temperature = 590.4 F Secondary Plant Performance Feedvater heater terminal differences were as follows:
No. 1 = 5.0 F No. 2 = 6.2 F No. 3 = 5.0 F
l- - - - -
(
The condenser performance was as follove-178.1 MWe; 2.22" IIg B.P. ; 528 MWt; 60.1 F (
in; TTD = 23.8 F; s.
cleanliness factor = 72.4%.
Chemistry The main coolant boron concentration was reduced from 633 ppm to 513 ppm to compensate for normal core depletion.
The main coolant pH averaged 5.hh during the period.
The main coolant beta-gamma specific activity and crud level averaged 1.06 x 10-1 ue/ml and 0.02 ppm respectively.
t l
The main coolant tritium concentration averaged 3.01 ue/ml l
during the report period.
The iodine-131 specific activity averaged 2 9 x 10-h ue/cc and the iodine 131/133 atomic ratio averaged 2.18.
A crud sample for the month collected on June 25, had the following radiochemical analyses: dpm/mg crud Cr-51 Mn-5h Fe-59 1.01 x 107 7.12 x 105 6
2.09 x 10
}
Co-58 Co-60 Ag-110M 6
5 i
3.69 x 10 7 96 x 10 3.89 x 105 A main coolant gas sample, collected on June 8, had the following i
radiochemical analyses: uc/cc gas i
Xe-133 Xe-135 Ar-b1 i
3.00 1.20 x 10-1 4.90 x 10-1 Health and Safety l
One shipment of 59 drums of low level vaste containing 17.7 cc l
vas made during the period.
I Waste disposal liquid releases totalled 50,330 gallons containing 0.025 me of gross beta-gamma activity and 105.79 curies of tritium.
Gaseous releases during the period totalled 1.6h6 curies of gross beta-l gamma activity. Secondary plant water discharged totalled 539,757 gallons i
containing 9.729 me of gross beta-gamma activity and 4.132 curies of tritium.
' Radiation exposure doses for Yankee plant personnel as measured by film badge, for the month of June, 1971 vere as follows:
Average accumulated exposure dose:
92 mrem Maximum accumulated exposure dose: h70 mrem
l
~ ~s u
t.
i Operations Attached is a summary of plant operating statistics and a plot of daily average load for the month of June, 1971.
i l
9 i
I l
1 l
I i
+
1 t
-..i
f YANKEE ATOMIC ELECTRIC COMPANY - OPERATING SUWARY l
June 1971 l
l ELECTRICAL MONTH.
YEAR TO DATE l
i.
Gross Generation KWH 126,345,000 783,094,900 12,278,966,200 I
sta. Service (While Gen. Incl. Losses)
KWH 7,729,035 46,960,725 794,985,750 l
- let output KWH 118,615,965 736,134,175 11,483,980,450 Station Service 6.12 6.00
'6.h7 l
Sta.' Service (While Not Gen. Incl. Losses) KWH 81,000 421,883 32,710,738 i
Ave. Gen. For Month (720)
KW 175,h79.2 i
Ave. Gen. Running (707.52)
KW 178,574.5 PLANT PERFbRMANCE Net Plant Efficiency 28.22 28.86 28.51
-Het Plant Heat Rate btu /KWH 12,093 11,825 11,970 Plant Capacity Factor 97.29 97.87 76.19 Reactor Plant Availability 98.57 98.69 84.64 l
NUCLEAR MONTH CORE IX TOTAL Hours Critical HRS 709.73 5,103.4h 80,067.84 Tines Scran:med -
0 2
63 Burnup Core Average M4D/MrU 8h2.96 6,011.23 Region Average M4D/MTU f
I A (INNER) 839.89 5,826.49 23,030.16 B (MIDDLE) 982.48 7,078'26 15,820.11 C (OUTER).
703.98 h,965.46 h,965.h6 i
D (ZIRCAI4Y) me
=e-e-------nms,- - - --ow_ m-r we__
-er---un--mweeerre--- s-te em w
-- m
r Ii ilti{i.
ij i
(
iI
.f t
>j, I
,m4 i
0 g
3 i
i i
i 5
(
2 i
i i
0 g
Y 2
l U
P.
i I
i s
D a
A 4
D D
E I
T 1
O E
7 D
G 9
n l5 L
A r
1 E
?.
o 1
E f
e C
V n
Z A
u h
J O
Y i
T L
A IA E
D 1
2 7.
i
'A Y
i01 i
i e
s 1$
i e
4 4
m m
M a
0 0
0 0
0 5
0 5
2 1
1
.~ DcOSv 4.d 2
9h,.< bNa 1:
i 1J
.i(i I 1i!1,
!l1;d ji
<i 4l i, '
1 4
i!
i
,'j' i l'
~_
~ ]-
I i
b 1
A B
C D
E F
G H
J K
y XXX X 2
la NXL '
XX <3 N/ N/
X/ \\/
i*
/N /\\
/\\ /N
!o XX XX If..
_ 'N
,.d ic
~.X
$tsi X~
l N/N/
N/ N/
j.
y
/N /\\
/\\ /N j
!o N/\\/
N/ \\/
/\\/\\
/\\/N N/' / N.
f l'/
N/ N/
"a
/N/\\
/\\ /\\
s*A
~N/N/ N/ N/
rk:aion p'
/x/y/N/N y a unicuwn l
^
A 4.94 *:
i xx h
N 94 l
x C
- 4. 94 y/,
x FCW RC-6 *