YANKEE NUCLEAR POWER STATION OPERATION REPORT NO. 141 i
l i
l For the Month of September 1972 I
l l
1
,I 1
l i
l 1
?
f Submitted by YANKEE ATOMIC ELECTRIC COMPANY Westboro Massachusetts 80112eo/,(
october 1972 i
R J
4 Company at Rowe, Massachusetts for the month of September,1972.
This report covers the operation of the Yankee Atomic Electric During the period the plant load varied between 153.0 MWe and 150.0 MWe as the circulating water temperature fluctuated between 60 F and 63 F.
Two scheduled plant shutdowns occurred during the report period, both for the purpose of control rod drop time testing.
The first shutdown occurred on September 9 at 05h5 hours. Following coupletion of the testing the turbine generator was phased to the line at 103h hours and the plant was loaded to 498 MWt at 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> that date.
The second shutdown occurred on September 30, at 05h5 hours.
Following completion of the testing the turbine generator was phased to the line at 1053 hours0.0122 days <br />0.293 hours <br />0.00174 weeks <br />4.006665e-4 months <br /> and the plant was loaded to h98 MWt at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> that date.
The second, Core X vapor container air leakage surveillance period was tenninated on September 15 and the third such period commenced on September 16, 1972. Leakage during the entire report period was normal.
Plant Abnormal Occurrences There were no plant abnormal occurrences during tre report period.
Plant Load Reductions There were no plant load reductions during the report period.
Plant Shutdowns Shutdown No. 130-10-72:
9/9/72, plant shutdown for control rod drop time testing. Total outage time:
3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, 49 minutes.
Shutdown No. 131-10-72:
9/30/72, plant shutdown for control rod drop time testing. Total outage time: 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, h8 minutes.
Plant Maintenance The following is a list of pertinent plant maintenance items performed by the plant staff during the month of September, 1972.
i 1.
The Nc. 2 Auxiliary Stean Boiler was completely retubed and returned to standby service.
i 2.
The diaphragms in several valves of the vaste liquid system were replaced.
3.
The No.1 and No. 3 charging pumps were repacked.
Illii o
_ i I
Instrumentation and Control I
The following is a list of pertinent instrumentation and control maintenance items performed by the plant staff during the month of f
September, 1972.
1.
The level transmitter for the Safety Injection Accumulator was replaced.
2.
The Single Step Rods Out permissive pressure switch was calibrated.
Reactor Plant Performance Measurements with the incore instrumentation were performed under j
the following plant conditions :
1 0
493.4 MWt; 511.9 F Tave; Control Rod Group A @ 84 ", B, C, and D @ 87 ";
1232 ppm boron; equilibrium xenon.
j The results of the measuremr.nts were:
Stsinless Steel Zircaloy Clad CD.d Assenbly Assembly t
3, F{
l.93 1.79 r"g 1.45 1.36 Maximum Outlet F 576 573 Secondary Plant Performance F.edwater heater terminal differences were as follows :
No. 1 = h.3 F No. 2 = 6.2 F No. s = 5.8 F i
The condenser performance was as follows:
150.6 MWe; 1.94" Hg B.P. ; h95.0 MWt; 6h.9 F C.W. in; TTD = 18.33 F; cleanliness factor = 69.1%.
Chemistry f
The main coolant boron concentration was reduced from 1324 ppm to
(
1176 ppm to compensate for normal core depletion.
l The main coolant pH averaged 5.47 dur'ng the period.
The main coolant beta-gamma specific activity and crud level averaged 1.32 x 10-1 ue/ml and 0.02 ppm, respectively.
-1 4
during the report period.
The main coolant tritium concentration averaged 6.89 x 10 uc/ml
o-4 The iodine-131 specific activity averaged 1 54 x 10-3 uc/ml and the iodine 131/133 atomic ratio averaged 3.58.
1 A crud sample for the month collected on September 11 had the following radiochemical analyses: dpm/cg crud i
Cr-51 b'n-S h Fe-59 Co-58 I
1.95 x 10 2.46 x 105 6.hD x 105 6
3.00 x 10 1
Co-60 j
8.69 x 105 Ag-110M Zr-95 Sb-12h 6.27 x 104 h.16 x 105 5
1.27 x 10 An average of the main coolant gas samples collected during l
September, had the following radiochemical analyses: ue/cc gas I
Xe-133 Xe-135 Ar-bl 3.h7 1.59 h.50 x 10~1 Health and Safety One shipment consisting of 51 drums containing a total activity of 39.8 cc was made during the period.
1 Waste disposal liquid releases totalled h9,051 gallons containing O.031 me of gross beta-gamma activity and 92.h2 curies of tritium.
Gaseous releases during the period totalled 2.03h curies of gross beta-gamma activity and 0.5h =c of tritium.
Secondary plant water discharged totalled 326,hh6 l
gallons containing 0.007 me of gross beta-gamma activity and 0.14 curies of tritium.
l Radiation exposure doses for Yankee plant personnel, as measured by film badge for the month of September,1972, were as follows:
Average accumulatea exposure dose:
43 mren Maximum accumulated exposure dose: 270 mrem Operations Attached is a summary of plant operating statistics and a plot of daily average load for the month of September,1972.
1 The following Operating and Administrative Procedures were j
approved during the month of September, 1972.
Operatine Procedure i
j OP-280 Filling of Shield Tank Cavity Administrative Procedure i
AP-001 Administrative and Operating Procedures w--.
. -1
s YANKEE ATOMIC ELECTRIC COMPANY - CPE. RATING SUMyARY f
1 September 1972 ELECTRICAL MONTH YEAR TO DATE j
r Gross Generation KWH 107,hh9,800 618,038,100 13,633,914,000 l
Sta. Service (While Gen. Incl. Losses)
KWH 7,128,963 40,860,810 881,930,42h Net Output KWH 100,320,83T 577,177,290 12,751,983.576 1
I Station Service 6.63 6.61 6.47 l
Sta. Service (While Not Gen. Incl. Losses) KWH 53,729 5,464,363 38,568,755 Ave. Gen. For Month (720)
KW 149,235.8 Ave. Gen. Running (712.38)
KW 150,832.1 j
(
l PLANT PERFVRMANCE l
l det Plant Efficiency 28.50 28.81 28.50 Net Plant Heat Rate btu /KWH 11,97h.56 11,8h5.71 11,97h.56 Plant Capacity Factor 81.h8 50 78 75.26 i
l Reactor Plant Availability 99.49 66.32 84.10 7
i j
l NUCLEAR MONTH CORE X TOTAL l
Hours Critical HRS T16.30 3,277.70 88,762.69 Times Serm med 0
8 69 i,
Burnup Core Average WD/b'fU 751.80 3,226.30 Region Average FT4D/bffU A (INNER) 673.5h 2,829.76 21,185.26 B (MIDDLE) 817.71 3,537.27 13,508.62 C (OUTER-ZIRCALOY) 686.08 2,922.66 2,922.66 4
l I
i I
YANKEE ATOMI "dIC COMPANY I
DAILY AVERAGE LOAD FOR Sm='APvP M79 200-n co
~
$g 150 _
v O
t S
ra 53 ca ra Q
100 -
M A
J 50 -
0 4
8 4
4 I
l 8
3 4
4 l
4 4
I i
l l
6 6
a i
6 e
i e
i i
i 5
10 15 20 25 30 DAYS i
p,oc
_e_
L-
~
/"UEL ASSEMBLY LM-00T core ~ X 3
A B
C D
E F
G H
J K
y XXXX 2NXX X X/ 3 XX XX 3
XX XX 4
6eL X MM X,c
~ X M
X
~
e XX XX 7
XX XX o
f(XX XXN o
o XXXX am Metser
^
b
/
I, M :'
Xse