ML19351D972
| ML19351D972 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/05/1980 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| TASK-16, TASK-RR NUDOCS 8011200495 | |
| Download: ML19351D972 (2) | |
Text
,r]* l/,
4 M ~:-
i
- 5 cgi;c
ORB Reading GCwalina NRR Reading NSIC William T. Russell TERA Mr. W. G. Counsil, Vice President Hazel Smith ACRS (16)
Nuclear Engineering and Operations JShea SEP File (2)
Northeast Nuclear Energy Cogany DEisen, hut RDiggs P. O. Box 270 RPurple JWetmore Hartford, Connecticut 0610!
TNovak RTedesco
Dear fir. Counsil:
Glainas JHeltemes, AECD
SUBJECT:
MILLSTONE - SEP TOPIC XVI. TECHNICAL SPECIFICATIONS The objective of SEP Topic XVI, " Technical Specifications" is to assure that safety limits and operational safety measures are specified in order to minimize the probability or consequences of accidents.
In order to assure that the inplementation of appropriate technical specifications will conform to the overall objective of the SEP program, we have decided to delay conpletion of SEP Topic XVI, Technical Specifications, until the co@letion of all other SEP Topic reviews and the Integrated Safety Assessment. This will allow for an intagrated evaluation of current Technical Specifications with any proposed Technical Specification changes resulting from individual SEP topic reviews.
If you have any questions or comments toward this regard please inform the NRC in a timely manner.
Sincerely.
-q Dennis H. Crutchfield, Chief Operating Reactors 3 ranch No. 5 Division of Licensing cc:
See next page 8011 00#7I
- See previous yei ow for additional concurrences, ORBa5,:D_L/,Q,hD.MDL orricc h.S EPB : DL,/,C jlG: DST, OR885:DL/PM sun ~we p.WRus.s.e1.1 ; dkhDS kovbol t?.
.DC!u'tch f.i. eld.'GLainks.
JShea*
.p.s oarc h 10/,27/,80,.. 10/.28/8.0.
10/.29180..i.
.14/..? /B 0.,
.19/A/80 Ry^R Ormm Mn a2-I@ MOCfl At4M -
UMA MMN#8FfNT *AtmTirm cvfriert: 2 79 209 369 l
1
DISTRIBUTION Docket File JRoe r
NRC PD4 OELD Local PDR OI&E (3) 2 Docket No. : 50-245 ORB Reading GCwalina NRR Readir.g NSIC William T. Russell TERA Hazel Smith ACRS (16)
JShea SEP File (2) se Mr. W. G. Counsil, Vice President pp re Nuc1 car Engineering and Operations TNovak Murtheast Nuclear Energy Cocpany Riedesco P. O. Box 270 Hartford, Connecticut 06101 J
1+ e s, AE00
Dear Mr. Counsil:
SUBJECT:
MILLSTONE - SEP TOPIC XVI. TECllNICA1. SPECIFICATIONS The objective of SEP Topic XVI, " Technical Specifications" is to assure that safety limits and operational safety measures ara specified in order to minimize the probability of accidents.
In order to assure that the inplementation of appropriate technical specifications will conform to the overall objective of the SEP program, we have decided to delay revision of your present Technical Specifications until the coupletion of all other SEP Topic reviews an(the Integrated Safety Assessment. This will allow for an integrated evaluation of current Technical Specifications with any proposed Technical Specification chances resulting from individual SEP topic reviews.
If you have any questions or connents toward this regard please inform the NRC in a timely manner.
Sincerely, c-Dennis M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing cc:
See next page SEPB:DL/C LG:D~
OR845:DL/PM ORB #5 :St'/C AD:SA:DL suRN E..
uYs hk...DS k
,It,
, J.S h ea,
,0,Grutchkie.1 d.Gl.a.icas oarE >. 10M/80
. 10/f.i 10(#7/.O!
10!..l80 10L. / 80...
feQC f 0Ru 318 (9 761 NRCM 0240
. D U.S. GOVERNMENT PRINTING OFff CEt 1979 289 369
((3A EfCg%,
UNITED STATES
,.,, rf( j NUCLEAR REGULATORY COMMISSION Tf f
WASHINGTON, D. C. 20555 3 J-
% h def i NOV 0 51980 gv j Docket No. : 50-245 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06101
Dear Mr. Counsil:
SUBJECT:
MILLSTONE - SEP TOPIC XVI TECHNICAL SPECIFICATIONS The objective of SEP Topic XVI, " Technical Specifications" is to assure that safety limits and operational safety measures are specified in order to minimize the probability or consequences of accidents.
In order to assure that the implementation of appropriate technical specifications will conform to the overall objective of the SEP program, we have decided to delay completion of SEP Topic XVI Technical Specifications, until the conpletion of all other SEP Topic reviews and the Integrated Safety Assessn.ent. This will allow for an integrated evaluation of current Technical Specifications with any proposed Technical Specification changes resulting from individual SEP topic reviews.
If you have any questions or connents toward this regard please inform the NRC in a timely manner.
Sincerely,
.y Dennis M. Crutchfield, ief Operating Reactors Branch No. b Division of Licensing cc: See next page I
Mr. W. G. Counsil CC William H. Cuddy, Esquire Connecticut Energy Agency Day, Berry & Howard ATTN: Assistant Director Counselors at Law-Research and Policy One Constitution Plaza Development Hartford, Connecticut 06103 Department of Planning and Energy Policy Natural Resources Defense Council 20 Grand Street 917 15th Street, N. W.
Hartford, Connecticut 06106 Washington, D. C.
20005 Director, Technical Assessment Division Northeast Nuclear Energy Company Office of Radiation Programs ATTN: Superintendent (AW-459)
Millstone Plant U. S. Environmental Protection P. O. Box 128 Agency Waterford, Connecticut 06385 Crystal Mall #2 Arlington, Virginia 20460 Mr. James R. Himmelwrignt Northeast Utilities Service Conpany U. S. Environmental Protection P. O. Box 270 Agency Hartford, Connecticut 06101 Region I Office ATTN: EIS C0ORDINATOR Resident Inspector JFK Federal Building c/o V. S. NRC Boston, Massachusetts 02203 P. O. Box Drawer KK Niantic, Connecticut 06357 Waterford Public Library Rope Ferry Road, Route 156 Waterford, Connecticut 06385 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterfcrd, Connecticut 06385 John F. Opeka Systens Superintendent Northeast Utilities Service Corpany P. O. Box 270 Hartford, Connecticut 06101
.