ML19351D857

From kanterella
Jump to navigation Jump to search
Ack Receipt of 800929 Interim Deficiency Rept Re Incorrect Weld Filler Used in safety-related Pipe Spool Pieces
ML19351D857
Person / Time
Site: Marble Hill
Issue date: 10/17/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
References
NUDOCS 8011200250
Download: ML19351D857 (1)


Text

.,--

l h://b C,

X.

)

r j

QCT 17 G80 q

15 Docket No. 50-546 l

Dockat No. 50-547 (E

E Um'}': -

i l

Public Service of Indiana

'Q"

[

^

l ATTN:

Mr. S. W. Shields 5

f~.

Senior Vice President M

Yi Nuclear Division 2

E!

Post Of fice Box 190 New Washington, IN 47162 i

Centlemen:

Thank you for your interim report dated September 29, 1980, pursuant to 10 CFR 50.55(e) regarding incorrect weld filler used in velding

}

safety related pipe spool pieces. We will review your final report on this matter upon receipt.

Your cooperation with us is appreciated.

I Sincerely, Gaston Fiorelli, Chief Rasctor Construction and Engineering Support Branch cc: Director, RCI/IE Director, AEOD l

Chief, OE3/MPA IE Files Mr. G. N. Brown, Project Director i

C. Kammerer, CA i

l cc w/ltr dtd 9/29/80:

Central Files

,, FDR I

Local PDR l

NSIC TIC i

LeBoeuf, Lamb, Leiby & MacRae Mr. Dave Martin, Office of i

i Attorney General Mr..Tnhn e _ cal lam-aw_

ca.Ff

!i o,y,D tor Enviro M t, Energy lRIII nearur =eamrsnmaan.e

- RIII.,

RIIJ_

a

= - -

g sua~4ue>

__ __S_c,h _ _n_zf ew WIMims.... li E_

o4rr>m.___---

10/10/80/d-/5'-10 ll

~ac em-u. ca mi cs.7.i ~acu ezo.o

u. s. covea~ue~1 ani~ri~c orrica i i..:. 12s

Q9 2h' h

.L /

PUBLIC SERVICE INDIANA S. W. Shields Senior Vice Presdent -

September 29, 1980 Nuclear Division Mr. James G. Keppler, Director Docket Nos.: STN 50-546 STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On March 28, 1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc., (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). This item was described in more detail in an interim report to your office dated April 25, 1980 (DSN 0425804002).

As discussed ir. the interim report, PSI has obtained an ADfE interpretation of code requirec.ents regarding Certified Material Test Rept rts (CMTR's).

The ASME confirmed that for the applicable edition of the Code, weld filler material used on the spool pieces in question could be furnished with only a Certificate of Compliance and a CMIR was not required. Other '

questions pertaining to these Certificates of Compliance require additional surveillance cf vendor facilities and this surveillance is not yet complete. PSI' anticipates this surveillance will be complete and the results available on or before December 15, 1980. If you have any questions on this matter, please feel free to contact me.

Sincerely, L&T S. W. Shields TDG/cg cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 E. R. Schweibinz, P. E.

J. J. Harrison OCT.

6 E80 P.O. Box 190, New Washington, Indiana 47162 812. 293. 4441 (clooGoa.S5