Forwards IE Insp Rept 50-336/80-13 on 800827-29.No Noncompliance Noted
ML19351D840
Person / Time
Site: Millstone 
Issue date: 09/25/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19351D841 List:
References
NUDOCS 8011200100
Download: ML19351D840 (2)


See also: IR 05000336/1980013

Text

gedusMW #

-:

/"%

unnto sT4rss

.*

NUCLEAR REGUt ATORY COMMisslON

f

.

}

acson n

a

g

431 PARK AVENUE

.[

MsNC OF PRUSSI A. PENN$YLV ANI A 19406

59 25 G

~

Docket No. 50-336

-

3

--

1

Northeast Nuclear Energy Company

C

ATTN: Mr. W. G. Counsil

_

2.

Senior Vice President - Nuclear

Lw>

1

'd

Engineering and Operations

M

--

P. O. Box 270

M

M

a

Hartford, Connecticut 06101

e

a

Gentlemen:

Subject:

Inspection 50-336/80-13

This refers to the routine inspection conducted by Mr. E. P. Jernigan of this

office on August 27-29, 1980 at Millstone Unit 2, Waterford, Connecticut of

activities authorized by NRC License No. DPR-65 and to the discussions of our

findings held by Mr. Jernigan with Mr. J. Kelly and others of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any infomation that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accomoanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Comission as listed in subparagraph (b) (4) of Section

2.790. The infomation sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Rocm.

l

l

8011200/00

@

'

.-

o

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

.

obert T. Car son, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-336/80-13

cc w/ encl:

!

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

.