ML19351D785

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/80-39 & 50-374/80-25 on 800904.No Noncompliance Noted
ML19351D785
Person / Time
Site: LaSalle  
Issue date: 09/17/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19351D786 List:
References
NUDOCS 8011200036
Download: ML19351D785 (2)


See also: IR 05000373/1980039

Text

D.,

g!.3 CIQvj

8

h,

UNITE D STATES

,

[/I

  1. l'y,,,.J'1

NUCLEAR REGULATORY COMMISSION

f

'

REGION lli

.S*

$ J ' r'**/ .

[,Q h

'['c

'

799 ROOSEVELT ROAD

g

0,

GLEN ELLYN. lLLINCIS 60137

% " .N .*

,e

-.

,

SEP 17 G30

-

U

..e

5

'

- .-

3

'

- :

kJ $

E

-

Docket No. 50-373

Docket No. 50-374

d

E, i

-

H

u

m

o

Commonwealth Edison Company

j

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine inspection conducted by Messrs. J. H. Neisler

and C. M. Erb of this office on September 4, 1980, of activities at

LaSalle County Station, Units 1 and 2 authorized by NRC Construction

Permits No. CPPR-99 and No. CPPR-100 and to the discussion of our find-

ings with Mr. L. J. Burke and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary in-

formation identified in t.he application is contained in an enclosure to

the application.

'

8 0 1 1 ~n 0 0 O 3. G

.

-.

Commo'nwealth Edison Company

-2-

SEP 17 %

We will gladly discuss.any questions you have concerning this

inspection.

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-373/80-39

and No. 50-374/80-25

cc w/ encl:

Mr. J. S. Abel, Director

of Nuclear Licensing

Mr. L. J. Burke,. Site

Construction Superintendent

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

Superintendent

'

Mr. B. B. Stephenson

Project Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

III

RIII

RIII

~

III

(QLY

b

williams

F1 relli

is an

er/jp

'if/k/ft

e / /[

9/16/80

4

_

_

-

-

.