ML19351D785
| ML19351D785 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 09/17/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19351D786 | List: |
| References | |
| NUDOCS 8011200036 | |
| Download: ML19351D785 (2) | |
See also: IR 05000373/1980039
Text
D.,
g!.3 CIQvj
8
h,
UNITE D STATES
,
[/I
- l'y,,,.J'1
NUCLEAR REGULATORY COMMISSION
f
'
REGION lli
.S*
$ J ' r'**/ .
[,Q h
'['c
'
799 ROOSEVELT ROAD
g
0,
GLEN ELLYN. lLLINCIS 60137
% " .N .*
,e
-.
,
SEP 17 G30
-
U
..e
5
'
- .-
3
'
- - :
kJ $
E
-
Docket No. 50-373
Docket No. 50-374
d
E, i
-
H
u
m
o
Commonwealth Edison Company
j
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine inspection conducted by Messrs. J. H. Neisler
and C. M. Erb of this office on September 4, 1980, of activities at
LaSalle County Station, Units 1 and 2 authorized by NRC Construction
Permits No. CPPR-99 and No. CPPR-100 and to the discussion of our find-
ings with Mr. L. J. Burke and others of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure.
The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary in-
formation identified in t.he application is contained in an enclosure to
the application.
'
8 0 1 1 ~n 0 0 O 3. G
.
-.
Commo'nwealth Edison Company
-2-
SEP 17 %
We will gladly discuss.any questions you have concerning this
inspection.
Sincerely,
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection
Report No. 50-373/80-39
and No. 50-374/80-25
cc w/ encl:
Mr. J. S. Abel, Director
of Nuclear Licensing
Mr. L. J. Burke,. Site
Construction Superintendent
Mr. T. E. Quaka, Quality
Assurance Supervisor
Mr. R. H. Holyoak, Station
Superintendent
'
Mr. B. B. Stephenson
Project Manager
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
III
RIII
RIII
~
III
(QLY
b
williams
F1 relli
is an
er/jp
'if/k/ft
e / /[
9/16/80
4
_
_
-
-
.