Text
.
f_,
..n
'k UNITED STATES
[
k
' NUCLEAR REGULATORY COMMISSION 3
,j tVASHINGTON, D. C. 20666 w
t
%, * * * * * /
gg. s YANKEE ATOMIC ELECTRIC COMPANY DOCKET NO. 50-29 5]
YANKEE NUCLEAR POWER STATION (YANKEE-ROWE)
,.jK.g AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 35 k.,...
License No. DPR-3 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Yankee Atomic Electric Company (the licensee) dated January 18, 1977, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth
==
in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized
~
by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the healthand safety of the public; and
=
E.
The issuance of this amendment is in ;;-ardance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment,andparagraph2.C.(2)ofFacilityOperatingLicenseNo.
DPR-3 is hereby amended to read as follows:
"(2). Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.
, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications."
80111 N
=
L,.
(:.;.
.;.;-g;-
- ==.'
e. :==
3.
This license amendment is effective as of the date of its issuance.
==
- ~..Li.
FOR THE' NUCLEAR REGULATORY COMMISSION h55; i
. httM -
~ ___
A. Schw ecer, Chief
~ '...
=
Operating Reactors Branch #1 l
Division of Operating Reactors t
Attachment:
t...
Changes to the Technical
~ ~.,.
Specifications
=~ x:.,
Date of Issuance: January 31, 1977 w
_~
-=
4 l
'h"
(
- .. j l-E:..
l s=:
.=
.:=z.z. :
.s.
__ _ -._. _ _= __
k
.' (... -
~. - -
.;:g.pm
=::
.;.aste 22.!!h;:-
- .===
= =
- m "~
I ATTACHMENT TO LICENSE AMENDMENT NO. 35
~
!h FACILITY LICENSE NO. DPR-3 DOCKET NO. 50, =. =
i::..
h' -
4 1
?.gg Revise Appendix A as follows:
.g Replace pages 3/4 1-14, 3/4 1-15 and 3/4 5-4 with attached revised pages.
...e
'l.5
- 9 -...
i 1
.=
..E'.".
ll.
?
.fi!
i i
j
.s.
i
-.:. l.
- "'l,.
- ~
!*kb'.h{
- a.:::::
2U.,S.
.s l.
t
- =,_.:.._ ;.. _._.,
- .]:. ::
..il l,L r
-,,n-
,c..n
,r,
.-,.,,,, -.,..--,,, ~,-
,.,r,
I.....
I,.
~,
=:
REACTIVITY CONTROL SYSTEMS _
.. = -
CHARGING PUMP - SHUT 00WN_
LIMITING CONDITION FOR OPERATION
=:r 7
':$ :.~
~
si... '
3.1. 2. 5 At least one charging pump in the boron injection flow path required by Specification 3.1.2.2 shall be OPERABLE.
"g ;
E" APPLICABILITY: MODE 5.'
[
ACTION:
- t.. =
E With no chtrging pump OPERAELE, suspend all operations involving positive
=
reactivity changes until at least one charging pump is restored to OPERABLE status.
.:=;
d%
k I
SURVEILLANCE RE00iREMENTS 4.1. 2. 5 At least the above required charging pump shall be demonstrated OPERABLE at least once per 31 days by:
Starting (unless already operating) the pump from the control a.
- Toom, b.
Verifying that the pump delivers a flow 1 26 gpm, to the Main Coolant System and Verifying pump operation for at least 15 minutes.
c.
- =
_
8.+i YANKEE-ROWE 3/4 1-14 Amendment No. 35
~$
=
==
=
7
t REACTIVITY CONTROL SYSTEMS
~
CHARGING PUMPS - OPERATIf1G
- j
.=
LIMITINGCONDITIONFOROP5 RATION
i.
=.s 3.1.2.6 At least two charging pumps shall be OPERABLE.
.=
APPLICABILITY: MODES 1, 2, 3, and 4.
i-t h
ACTION:
i With only one charging pump OPERABLE, restore at least two charging
- l pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTD0'!N MARGIN (all control rods inserted) equivalent to at least 5% ak/k at 200*F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two charging pumps to OPERABLE status within the next 7 days or be in
"=~
COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
' =::-
SURVEILLANCE REQUIREftENTS 4.1.2.6 At least two charging pumps shall be demonstrated OPERABLE at least once per 31 days on a STAGGERED TEST BASIS by:
i.:.
Starting (unlessalreadyoperating)eachpumpfromthe a.
control room, b.
Verifying that cach pump delivers a. flow > 26 gpm to the
[
Main Coolant System, Verifying that each pump operates for at least 15 miautes, c.
and d.
Verifying that the pump suction and discharge valves are open.
c.
'::L'::
YANKEE-ROWE 3/4 1-15 Amendment No. 35 P0BR$0RIGINAL
L..
=-
' ;r:
EMERGENCY CORE COOLING SYSTEMS
. ??
SURVELLANCE REQUIREMENTS 4.5.2 Each ECCS safety injection subsystem, the recirculation sub-se system, and the long tenn hot leg injection subsystem shall be demon-
=~'
strated OPERABLE:
up At least once per 31 days on a STAGGERED TEST BASIS by:
,[.. '2 --
2 a.
I
'......=
1.
Verifying that each high pressure safety injection pump:
a)
Starts (unless already operating) from the control j.y
- room, b)
Develops a discharge pressure of > 850 psig on re-circulation flow.
c)
Operates for at least 15 minutes.
2.
Verifying that each low pressure safety injection pump:
a)
Starts (unless already operating) from the control room.
b)
Develops a discharge pressure of > 250 psig on T
recirculation flow through CS-MOV 532, c)
Operates for at least 15 minutes.
3.
Verifying that each purification pump:
a)
Starts (unless already operating) from the control
+
room.
b)
Develops a discharge pressure > 80 psig in nonnal purification system service.
c)
Operates for at least 15 minutes.
i 4.
Verifying that each fixed speed charging pump:
i a)
Starts (unless already operating) from the control room. -
b)
Delivers a flow > 26 gpm to the !!ain Coolant
== -
System, rad c)
- Operates for at least 15 minutes.
YANKEE-R0'JE 3/4 5-4 Amendment No. 35