Text
'h.
.n;
o
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
g
3
E
REGION I
g + . . . + ,o'[
631 PARK AVENUE
g
KING OF PRUSSIA, PENNSYLVANIA 19406
V
JUL 9 A A0
Docket No. 50-336
Northeast Nuclear Energy Company
ATTN:
Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection No. 50-336/80-08
This refers to the routine inspection conducted by Dr. Jin W. Chung of this
office on June 23-27, 1980, at Millstone Nuclear Power Station, Unit 2, Waterford,
Connecticut of activities authorized by NRC License No. DPR-65 and to the discus-
sions of our findings held by Dr. Jin W. Chung with Mr. E. J. Mroczka and other
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompli-
ance has been categorized into the levels as described in our correspondence to
you dated December 31, 1974.
This notice is sent to you pursuant to the provi-
sions of Section 2.201 of 'the NRC's " Rules of Practice," Part 2, Title 10, Code
of Federal Regulations.
Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to avoid
further items of noncompliance; and (3) the date when full compliance will be
achieved.
,
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
will be placed in the NRC's Public Document Room.
If this report contains any
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
80101 o ope /o :
-
.
.
JUL 2 4 isso
Northeast Nuclear Energy Company
2
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
c0.LcA.b.,Ab %
t
Eldon J. Brunner, Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement
Inspection Report No. 50-336/80-08
cc w/ enc 1:
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer