Forwards IE Insp Rept 50-289/80-17 on 800620-0710.No Noncompliance Noted
ML19351D351
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/21/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19351D352 List:
References
NUDOCS 8010100018
Download: ML19351D351 (2)


See also: IR 05000289/1980017

Text

e' "%

u

$s

.

-

pu

g

NUCLEAR REGULATORY COMMISslCN

y

j

REGION l

e2

3

431 PARK AVENUE

KING OF PRUSSI A, PENNSYLVANI A 19406

MG 211330

Docket No. 50-289

~

Metropolitan Edison Company

ATTN: Mr. R. C. Arnold

Senior Vice President

100 Interpace Parkway

Parsippany, New Jersey 07054

Gentlemen:

Subject:

Inspection 50-289/80-17

This refers to the routine inspection conducted by(Mr. L. Gage of this office on

June 20-July 10, 1980 at Middletown, Pennsylvania TMI, Unit I) of activities

authorized by NRC License No. DPR-50 and to the discussions of our findings held

by Mr. Gage with Mr. G. Troffer at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

,

Within the scope of this inspection, no items of noncompliance were observed.

j

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If thi: report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

,

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

j

possible into a separate part of the affidavit.

If we do not hear from you in

<

this regard within the specified period, the report will be placed in the Public

Document Rooja.

l

Off

8010100

,

. _ - _ . . . _ _ _ _

_ _ _ _

-.

---

.

.

Metropolitan Edison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

4=

,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-289/80-17

ccs:/ enc 1:

J. G. Herbein, Vice President-Nuclear Operations

R. J. Toole, Manager, Unit 1

W. E. Potts, Manager, Radiological Controls, Unit 1

J. J. Colitz, Manager, Plant Engineering, Unit 1

L. W. Harding, Supervisor of Licensing

R. F. Wilson, Director - Technical Functions

E. G. Wallace, Licensing Manager

I. R. Finfrock, Jr.

R. W. Conrad

J. B. Lieberman, Esquire

G. F. Trowbridge, Esquire

Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without

Report)

.

.