ML19351D224
| ML19351D224 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 08/28/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19351D225 | List: |
| References | |
| NUDOCS 8010090236 | |
| Download: ML19351D224 (2) | |
See also: IR 05000518/1980015
Text
f0
. . . _ - .
. .
-.- ..
. -.
5
.?-
i
8
g
UN TED STATES
o
NUCLEAR RECI) ATORY COMMISSION
o
o
$'
$
- a
REGION Il
3
e
101 MARifTTA sT., N.W.. SUITE 3100
o[
ATLANTA, GEORGIA 30303
AUG 2 81980
>
i
e
In Reply-Refer-To:
RIITWBS
i
50-518/80-15
50-519/80-15
/
50-520/80-15 , /
0 _5_2_1/80-15'
5
_
Tennessee Valley Authority
!
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
2
Gentlemen:
This refers to the inspection conducted by W. B. Swan of this office on June 30
to July 31, 1980, of activities authorized by NRC Construction Permit Nos.
4
CPPR-50. CPPR-151, CPPR-152 and CPPR-153 for the Hartsville facility, anC to
the discussion of our findings held with R. T. Hathcote at the conclusion of the
.
inspection.
!
Areas examined during the inspection and our findings are discussed in the
i
enclosed inspection report.
Within these areas, the inspection consisted of
j
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
,
Within the scope of this inspection, no items of noncompliance were disclosed.
1
'
!
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the inbreation is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
,
8010090 M
.
.
,
,
-
-
-
-
- . , -
--
.
, , - -
,-.w
--+
, _ . _.._.-______;
_
.
,
. Tennessee Valley Authority
-2-
AUG 2 81980
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
l
'
'
s
C. E. Murphy,
icf
4
i
Reactor Conrtruction and Engineering
'
Support Branch
Cociosure:
Inspection Report Nos. 50-518/80-15,
50-519/80-15, 50-520/80-15 and 50-521/80-15
cc w/ encl:
R. T. Hathcote, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
.-
e
,,-m
, -
-
- - - - -
n
.,- -
--,y
ne
~,