ML19351D150
| ML19351D150 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 09/16/1980 |
| From: | Kausch T COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| IEB-80-13, NUDOCS 8010090090 | |
| Download: ML19351D150 (1) | |
Text
_ _ - _.
J lfb Commonwealth Edison Ora First ?!% tion 11 Platt Chiccgo. Illinois
'O Addr:ss R6 ply to: Post Office Box 767 Chicago, Illinois 60690 September 16, 1980 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Quad Cities Station Unit 1 Response to IE Bulletin 80-13 " Cracking In Core Spray Spargers" NRC Docket No. 50-254
Reference:
(a)J. G. Keppler letter to C. Reed dated May 12, 1980.
Dear Mr. Keppler:
Reference (a) transmitted IE Bulletin 80-13, whjch identified instances of cracking in Core Spray Spargers at BWR facilities.
As required by Bulletin Item 1, the Unit One Core Spray Spargers were visually inspected on September 6, 1980, utilizing a remote underwater TV camera.
The segment of piping between the inlet nnzzle and vessel shroud was also inspected on each Ccre Spray loop.
Adequte resolution was obtained with the underwater TV camera.
No evidence of cracks was identified during the conduct of the above described inspection.
It is acknowledged that the Bulletin requires subsequent refueling outage inspections at all Commonwealth Edison Company operating BWRs.
Please address any. questions you may have concerning this matter to this office.
Very truly yours h,
fr(m(
Thomas J. Rausch Nuclear Licensing Administrator Special Projects cc:
NRC Of fice of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C.
20555 NRC RIII Resident Inspector Quad Cities. Station 6744A
'SEP 9
g 8010090