ML19351A515
| ML19351A515 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/08/1989 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W ALABAMA POWER CO. |
| References | |
| NUDOCS 8912190104 | |
| Download: ML19351A515 (2) | |
Text
_
Lg..
fCL M r 8, 1989 Docket Nos. 50-348, 50-364 License Nos. NPF-2, NPF-8 Alabana Power Company ATTN: Mr. W. G. Hairston III Senior Vice President Nuclear Operations 40 Inverness Center Parkway l
P. O. Box 1295 Birmingham, AL 35201 Gentlenen:
SUBJECT:
EMERGENCYOPERATINGPROCEDURE(EOP)INSPECTIONPROGRAM This is to advise you of a special inspection initiative that is being performed at operating reactors.
It will include an inspection to be performed at your Farley site.
The initiative is entitled the "EOP Inspection
. Program."
The purpose of-the inspection is to verify that the E0Ps are technically accurate; that specified actions can be meaningfully accomplished using existing equipment, controls, and instrumentation; and that the available procedures have the usability necessary to provide the operator with an effective operating tool.
-The inspection program is a team inspection.
The inspection team should I
include two or three reactor inspectors, a licensing examiner, a human factors specialist, and the Farley senior resident inspector (Mr. G. Maxwell).
The inspection is scheduled for March 5-16, 1990.
The team leader for this y
inspection will be Mr. L. Lawyer from Region 11.
Mr. Lawyer will contact members of your staff in the near future to discuss the details of the inspection.
'If you have any questions in the interim regarding the inspection program, we will be pleased to discuss them with you.
Sincerely, l~
(ORIGINAL SIGNED BY T. A. Prmm)
.l l
Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety cc:
B. L. Moore Manager, Licensing Alabama Power Company P. O. Box 1295 l
Birmingham, AL 35201 cccont'd-(Seepage 2) 8912190104 89120e
\\
{DR ADOCK 0500 8 [I p3r i.
l g
- i.,
s a
n.
1 Alabama Power Company 2
Deccrnber 8,1989
'(cccont'd)
~
R. P. Mcdonald i
Executive Vice President Alabama Power Company l
P. O. Box-1295 i
Birmingham, AL 35201 j
J. D. Woodard
{
Vice President Nuclear Farley Project Alabama Power Company P. O. Box 1295 Bimingham, AL 35201 l
D. N. Morey i
General Manager i
Farley Nuclear Plant i
Drawer 470 Ashford, AL 36312 i
Louis B. Long, General Manager Southern Company Services, Inc.
P. O. Box 2625 1
Bimingham, AL 35202 Claude Earl Fox, M.D.
State Health Officer State Department of Public Health State Office Building i
Montgomery, AL 36130 Chairman Houston County Comission i
Dothan, AL 36301 State of Alabama bec:
E. Reeves Project Manager, NRR Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2. Box 24 Columbia, AL 36319 RIld*S RII:0F S RJI-
- h ny
/
LLawyer PKelMgg T eebles 12/ /89 12/q/89 12/[/89 7
m
_ _ _..