ML19351A233

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to 1000-PLN-7200.01, Operational QA Plan for TMI-1 & Oyster Creek. Changes for Plants Itemized in Attachment 1 & Attachments 2 & 3 Respond to NRC 880614 & 0805 Comments
ML19351A233
Person / Time
Site: Oyster Creek, 05000000, Crane
Issue date: 01/03/1989
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML19351A234 List:
References
6000-88-126, C311-88-2168, NUDOCS 8901170295
Download: ML19351A233 (2)


Text

+

3 SPU Nuoleer Corporation 1

. ENg gg' Persippany, New Jersey 07054 One Upper Pond Road

  • .i -

s 201 316 7000 TELEX 136 482 1~

Wrner's Direct Dial Number:

January 3,1989 (201) 316-7022 6000-88-126 C311-88-2168 Document Control Desk

'U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

SUBJECT:

Three Mile Island Nuclear Station Unit 1 (IMI-1)

License No. DPR-50 (Docket No. 50-289)

Oyster Creek Nuclear General Station License No. DPR-16 (Docket No. 50-219)

GPUNC OQA Plan, Revision 2

References:

1.

.GPUN Letter; (C311-88-2048); M. B. Ro;he to Document Control Desk; GPUNC l

OQA Plan Revision 2; April 15, 1988.

2.

NRC Letter; W. V. Johnson to M. B. Roche; NCFR 50.54 Review of "GPUNC 0QA Plan for TMI and Oyster Creek; Revision 2; 6/14/88.

I i

3.

NRC Letter; S. H. Weiss to P. B. Fiedler; NRC Review of Revision 2 of GPUN's Operational Quality Assurance Plan; 8/5/88.

4.

NRC Memo; J. G. Spraul to S. H. Weiss; Summary of Quality Assurance Meeting with General Public Utilities Nuclear (GPUN); 9/15/88.

Attached is the revised Revision 2 of GPUN's Operational Quality Assurance Plan.for Three Mile Island Unit 1 and Oyster Creek. The initially proposed

{

revision 2 had been previously provided by Reference 1.

That submittal has been revised principly to incorporate changes necessary to resolve NRC comments provided by References 3 and 4; and, to incorporate changes resulting from the reorganization referred to in Reference 1.

This revision contains some changes which are reductions in commitments in the QA Plan as previously accepted by the NRC. As delineated in Section 2.3.2.2 of. the currently approved Plan, this revision shall be regarded by CPUNC as approved by the NRC upon receipt of a letter to that effect from the appro-priate reviewing office or sixty days after this submittal to the NRC whichever comes first. This revision to this OQA Plan will not be implemented until that time.

/

A, y3 GDU Nuclea' Corporetton is a subs d a v o' Genera' Pub' c.U1M es Corocraton

.i

'p

T l

GPUNC OQA Plan, Revision 2 Page 2 The purpose of this revision is to improve the clarity of this OQA Plan to improve the consistency of its implementation. This purpose in principally achieved by increasing the directness of stating this plan's requirements; improving the consistency between the text of this OQA Plan and the Technical Specifications; and, by clarifying the GPUN response to Generic Letter 83-28.

Each of the changes to this plan is itemised in Attachment 1 of this letter and is evaluated as to whether it reduces the level of previous commitment.

The basis is provided if the change was evaluated as not reducing previous commitments.

For those changes which were determined to be a reduction in previous commitment, the justification for the acceptability of the change is provided in Attachment 2 of this letter. The overall cone'lusion of this evaluation is that the changes do not compromise the level of control of activities provided by the plan; and, that this revised plan continues to satisfy 10CFR50, Appendix B.

Attachments 3 and 4 of this letter provide the GPUN responses to the NRC comments provided by References 2 and 3.

These responses have been reviewed by the NRC and it is CPUN's understanding that these responses are acceptable i

subject to revising the text of the previously proposed revision 2.

Attach-

~

ments 3 and 4 provide direct indication of what changes to the previously proposed revision 2 text have resulted.

If there is any further action.that GPUN can take to facilitate the completian of you'. review, kindly advise. GPUN desires to implement this revision as e

r soon as possible.

Sincerely, 7

[

9 TI Fiedler PBF/,

M/dcr Director, Quality and Training j

L Attachments i

1.

General Disposition and Reason (s) For Changes Associated with Revision 2 i

of the OQA Plan 2.

Justification for Changes Associated with Revision 2 of the OQA Plan That Reduce the Commitments Previously Accepted by the NRC in Revision 1 of the OQA Plan 3.

GPUN Response to NRC Comments Provided by Reference 2 4

GPUN Response to NRC Comments Provided by Reference 3 1

cc:

3. G. Spraul R. Conte F. C. Hawkins L. Thonus R. Hernan J. Wechselberger W. Russell P. K. Eapen A. Dromerick l

4555/43.44 t

t