o
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
,
g
-
r
REGION 11
h.
101 MARIETTA ST.. N.W SulTE 3100
g~ ~. ,/
ATLANTA. GEORGIA 30303
-
a na
a
o>
h
Mississippi Power and Light Company
(
-ATTN: Mr. N. L. Stampley
of b:-b%
HLU
3[U
B.
jgg 3gjggj
g}.
Vice President of Production
9
P. O. Box 1640
,
Jackson, MS 39205
t
,y
z
q
a
cowsso
f.6
Gentlemen:
A
v\\
/
Subject: Report No. 50-416/81-13
N' CITTP
This refers to the routine safe;y inspection conducted by Mr. A. G. Wagner of
this office on April 15 - May 15, 1981, of actiivities authorized by NRC
Construction Permit Nt.. CPPR-118 for the Grand Gul facility and to the discussion
_
of our findings held with Mr. G. B. Rogers, Jr., Site Manager at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
.
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
'
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information.' If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
j
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
i
sought to be withheld snall be incorporated as far as possible into a separate
,
8106230$06
g
Q
%I
O
-
..
a.
>
..
.
Mississippi Power & Light-Company
2
JUN 0 41981
- part of the affidavit.
If we do not hear frca you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
-
Should you have~any questions concerning this letter,- we will be glad to discuss
them with you.
~ Sincerely,-
45?.lC'.
R. C.
is, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No.- 50-416/81-13-