ML19350E738

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-298/81-08 on 810504-08.No Noncompliance Noted
ML19350E738
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/08/1981
From: Brown G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML19350E739 List:
References
NUDOCS 8106230484
Download: ML19350E738 (2)


See also: IR 05000298/1981008

Text

-

.

f(p ony;*,

,

UNITED STATES

,

,

NUCLEAR REGULATORY COMMISSION

y

w

a

REGION IV

4'

t

'[

(11 RYA 4 PLAZA OMIVE. SUITE 1000

%~V /

AALINGTON, TEXA5 79011

  • * " *

JUN 081981

In Reply Refer To:

o

y dl[U[% sih

"

Occket No. 50-298/81-08

' 11

r

'f

,,Jyy 2 21SBN p

-

Nebraska Public Power District

ATTN: Mr. J. M. Pilant, Director

d ,,, Dgm., e?

-

Licensing and Quality Assurance

Post Office Box 499

9

Columbus, Nebraska

68601

47

Gentlemen:

This refers to the inspection conducted by Mr. J. B. Baird of this office

during May 4-8, 1981, of the activities authorized by NRC Operating License

No. OPR-46, and to the discussion of the inspection findings held by Mr. Baird

with L. C. Lessor at the conclusion of the inspection on May 8,1981.

Areas examined during the inspection and our findings are discussed in

'

the enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, no violations were disclosed.

In accordance with 10 CFR 2.790 of the Coninission's regulations, a copy of

'

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Poom.

If this report contains any information that you

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within 10 days from the date of

this letter of your intention to file a request for withholding; and (b) sub-

mit within 25 days from the date of this letter a written application to this

office to withhold such information.

If your receipt of this letter has been

delayed such that less than seven days are available for your review, please

notify this office promptly so that a new due date may be established.

Consistent with Section 2.790(b)(1), any such application must be accompanied

.

by an affidavit executed by the owner of the infonnation which identifies the

document or part sought to be withheld, and which contains a full statement

of the reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The infonnation sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, tne report will be placed in

the Public Document Room.

$600

8106280 M

f/

9

. .

.

.

_

.-

- ,.

.

.

'

.

- Nebraska Public Power District

-2-

Should you have any questions concerning this letter, we will be pleased

to discuss them with you.

Sincerely,

-t /

'All

Glen D. Brown, Chief

Technical Inspection Branch

Enclosure:

IE Inspection Report No. 50-298/81-08

'

l

!

I

'I

, ..

-.

.

._

- _ .

...

. . - ,

,

\\