ML19350E717

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1981
ML19350E717
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/02/1981
From: Watford M
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML19350E714 List:
References
NUDOCS 8106230466
Download: ML19350E717 (3)


Text

_;

[y ~~; ;_r+.a i

Enclicura to S; rials ', RSEP/81-944

+

P:ga 1 cf 3.

~

c

,-OPERATING DATA REPORT DOCKET NO: DPR-23 DATE: 810602 COMPLETED BY: M. L. Watford

.(4 TELEPIIONE: 803-383-4524

' s'

,0PERATING STATUS Notes:

'l. Unit Name: 11. B. Robinson Unit Two There are presently 113 spent fuel

2. Reportin'g Period: 810501, 0000/810531, 2400 assemblies in the spent fuel pit.
3. Licensed Thermal Power (FMt): 2300

- 4. Nameplata Rating -(Gross We): 739

5. Design' Electrical nating'(Net E c): 700 6.' Maimum Dependable Capacity (Crosn FMe): 700

-7. Maximum Dependabic Capacity (Net MWe)*

665 Give 8.: If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report,

-Reasons:

No change

- _ 9. Power, Level to Which Restricted, If An'y (Net FNc):

2200 MWt 10,< Reasons For Restrictions, If-Any: Although'the unit is not restricted by any outside the power level is presently reduced to 2200 We due to Steam Generator

_apency, considerations.

4 This Month Yr.-to-Date Cumulative

11. 'llo'urs in Reporting Period 744

_ 3623 89,789

~

13. Reactor Reserve Shutdown llours 0.00 97.7 68,899.83
12. Number of Ilours Reactor Was Critical 360.30 3134.55 1,075.63
14. llou'rs Generator On-Line 360.05 3065.22 67,224.04
15.. Unit Reserve Shutdown Hours 0.00 0.00 23.20
16. Gross Thermal Energy Generated (WH) 795,128 G,662,357 137,894,731
18. Het Electrical Energy Generated (Wil)

_236,4.17 2,058,ill

_44,506,682

17. Gross Electrical Energy Generated (Wil) 24 Ji2 2,167,915 42,174,563 19.. Unit Service Factor 48.39 84.50 74.87
20. Unit Availability Factor 48.39 84.60 74.89__
21. Unit Capacity Factor (Using MDC Net) 47.80 85.42 70.63_
22. Unit' Capacity Factor (Using DER Net) 45.41 81.15 67.10
23. Unit Forced Outage Rate 51.61 15.40 13.94
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelinchfaintenance - November 14. 1981 - 3 Months

25. If Shut.Down At End of Report Period, Estimated Date of Startup: June 10, 1981 26.. Units In Test Status (Prior to Commercial Operation):

Forecast. Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 8.106230 W#

(9/77)

~

Cg

t 7

DCCKET NO. DPR-23 UN:T S!!U TDOWNS AND POWER REDUCTIONS UNIT NA'.:E

_H. B. Robinson Two.

DATE 8:0602 COMPLETED BY M. L. Warford

- S

,,; (

REI' ORT MONTl!

Mav TEl.Li l!ONE 803-383-4524-C ""

asst w

c

.! ?

.[ 5' l Licensec h

{%

Catne l Currective 0

q

J.

re'8 Action tu -

i No.

Date g

3g

(

.3 g E Event n?

5O Prevent Recurrence U

fE 3 ;f3 Report a 6-e

[<

u g

e o

g Q

_w m

05-01 810516 S.

383.95 D

1 CC HTEXCH Shutdown for Steam Generator tube in-Q

(

spection (eddy current) and plugging 4

g w

as required per inspection.

)

I, o

l cce be f.

L.

k 1l:

1 I

r 1

l

' \\.

2 3

4 F: Forced Resum:

Method:

Ext:ibit C Instructions S: S !:edu!cd A Equipment Fai!ure(Exp!:in) 14hnual for Preparation of Data f t.Maintensn::e oi Test 2 Manu21 Scrarn.

Entry Shcets for !.icensee

[

C.Refueliaz; 3.Autonutic Scram.

Event Repost (l.I:lu lite (NUREG-D !<e;;nla:ory Restriction 4 Ottier (Explain) 016:)

j.

l.-Operator Tr:.ining & License Examination p

F-Adinmistr.i:ive 5

}~

Ex! ihit I Same Source G-Oper.itional Enor (Explain) r (9/77)

Il-Othes (Exptai:i)

?

e

[

es i

1

  • 9 P;ga 3 of 3 AYLRAGE DAILY U.N!T POWER LEVEL 3...

DOCKET NO.

DPR-23' H. B. Robinson Two UNIT.

DATE 810602 M. L. Watford COMPLETED BY 803-383-4524 TELErilONE MONT11 M8Y DAY-AVERAGE DAILY POWER LEVEL _*

DAY AVERAGE DAILY POWEP < lVEL (MWe Net)

(MWe Nett g

662 37

'O 2.

661

~

0 gg 3

663 39 0

4 661 20 0

g 660 21 0

6.

676 22 0

7

__681 23 0

g 665 24 0

9-666 25 0

10 666 26 0

11 '-

664 27 0

12

_665 28

'O 662 0

33 29 14 665 30 0

15 637 33 0

16 0

t INS 111UCTIONS On this format,1!:t the av::sge daily unit power levelin.We Net for each day in the reperting nwnth. Compute to the nessest whole in:gswstt.

(9/77)

~

e a

  1. A 4

-Cg 4'