Submits Addl Info to IE Insp Rept 50-206/81-17,Item 4,re Radioactive Waste Mgt.Procedure S-II-1.7 Revised 810508. Procedure Now Addresses Concerns of Detailed Findings,Item 4,(3)(4) & (6).Researching Data to Meet Requirements of 5
ML19350E584
Person / Time
Site: San Onofre 
Issue date: 05/11/1981
From: Haynes J
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8106230306
Download: ML19350E584 (2)


Text

.

?

Southern California Edison Company

  • O.somsoo 22 44 W ALNUT GROVE AVENU E ROSEbeE AD. CALIFORNI A Sl??O
  • fr '(,_M.

J. C. H A v re t s es6se=o=s.

f

.. ~ncjj, y,\\e,_,

tain set t res ec=us e or *wc6s.e o n e.o=s g,,gg;AIC01?

l'ay 11,1981 s3 g

m %.f.ty W,:;Mjff.

.e

~

U. S. !'ocinar re0ulatory Connission N

Crfice of Insoection and Enforcenent Peqinn V 8

h N 1000 l' orth california Boulevard Suite 707, tIalnut Creek Plaza

[

'2,

L'alnut Creek, California 04596 o

m N

Attention:

l*r. P.11. Engelhen, Director g

M s'

OCCKET f!o. 50-206 f

SAN O!!OFPE - Ut!IT 1 Dene Str:

Ry jar.ter dated September 30, 1980, response to ilRC Inspection Report

?!c, f.q.703 /90-17 was transnitted which outlined our response to significant ap raisal i+.crs in " Enclosure (1)".

tie are writing concerning an entry under itm 4, Fadioactive Waste l'anagement, Petailed Findings identified as follous:

! TF." J.

(?)

The responsibility for maintenance and calibration of radioactive effluent monitors should be shared by the instrumentation and radiation protection groups. Chances possibly affecting system efficiency should arise from a, joint evaluation of the possible e f fects.

(a)

Channes in process / effluent monitor systens affecting syste i response (e.g. detector replacenents) should be documented in d? tail.

(C)

A retrospective analysis should be made af the prinary calibration and instrument maintenance check data to obtain a correlaticq hetween the external calibration check snurce and the

'prinary calibration. Ccerection for decay of the cesium-137 ct cck source should t'e included in this analysis.

IN (9)

Procecu; e S-II-1.7 should he rewritten and updated to ' properly Werence source details and precedures involved.

3

/0 THIS DOCUMENT CONTAINS 810623O3JL

~

POOR QUAUTY PAGES Q

c.. ! >.-

- _ ~

l *  ;

[*

(

U. S. thclear Peculatory Cornission Pace J ?

ITB'4 (Continued) rur response to the above was as follows:

PESPritSE (3) (4) (5) (5) The procedures governing naintenance, calibration, chances of radioactive effluent.conitors will be revised by April 1,1941 to include a sharing of responsibilities between the Instrunentation and Padiation Protection Department, control of changes involving system responses and efficiency and to include proper reference source details. A retrospective analysis of primary calibration and instrurent maintenance check data to obtain a correlation between the' external calibration check source and the orinary will be completed by April,1981.

In renard to the above response, procedure S-II-1.7 has beea revised and was approved by the On Site Review Connittee on l'ay 8,1981.

This procedure now addresses the oncerns covered under " Detailed Findings" Iten:

a, (3). (A) and (6) above. Tnis procedure will be available for review during future conpliance inspections.

A research of available data is being conducted to meet the requirements of (5).

It is expected that this analysis will be conpleted by f%y ?9,19A1. Pesults of this analysis will also be nade available for review and connent during future conpliance. inspections.

01 ease contact re should you need further infernation concerning this natter.

Sincerely W

J. G. Hayres fianager of !!uclear Operations

!YS:005All/sf cc: