Requests That DOE Make Appropriate Corrections to Encl Footnote 3 to Table 1 Attached to Re Estimate of Licensing Costs.Nrc Cannot Predict return-to-svc Date for Facility
ML19350E419
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/21/1981
From: Bradford P
NRC COMMISSION (OCM)
To: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML19350E414 List:
References
NUDOCS 8106230023
Download: ML19350E419 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _

f-)..i' e-

'-." 7 %4

pp g g
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555

.y,N j

9[

'May 21','1981 x

'CFFICE OF THE CCMMISSIONEA O

MEMORANDUM FOR:

1 William J. _Dircks, Executive Director of Operations c:..:

FROM:

Peter A. Bradford I note that footnote 3 to Table 1 (attached) of DOE's May 15 estimate of licensing costs states "NRC and the company project the unit

_(TMI I) will return to service in October 1981." As you know, the return to service. of TMI I-is very much an issue in the ongoing hearing.

The most that NRC can predict is a decision date, not a return to service.

Whoever provided this estimate to 00E should'be so advised, and COE should be asked to correct that footnote.

cc: Chairman 'Hendrie Commissioner Gilinsky Commissioner Ahearne D. Eisenhut L. Bickwit, OGC D. R&thbun, OPE S. Chilk, SECY'

'#~

5.' C

.$ 1ti6 23 0 0 9 3

,, 7,, ;--

y

+e--

C171-son cf Power Supply ased Beliabill:y

=

1 Ait E I O.S. Department (f Eneacy.

May 15, 1981 p

DATA Ott littCIEAR UttITS W1114 01'tRATINC l.lCE!!SE DE1AYS 7 y

last ibuth's ProjecteJ D. ate of Current ProjectrJ Insaance of Date of Immuance Completton Dates ibaths of peplacceent Power Capac it y Operating License of Operating Pr o j ee ". 4 tey Delay Fuel Source g (- (4)

Unit DSO (Apsll SI)

License (May SI)

Company..tay 81)

S)

(6)

(7)

(l?

(2)

(3)

(4)

Comanche Peak 1 1,150 2/83 10/82 12/81 10 Can Self-generated Self-generat ed 2/82,/

1/82 1/81 9

011 2

blablo Canyon 1 1,084 Ditblo Canyon 2 1,106 3/82 1/82 10/81 3

011 Self-generate 4' McCutre 1 1,180 12/81 7/81 1/81 3

Coal Self-generated Sales 2 1,115 4/84 5/81 4/80 1

011-Coal-Furchamad San onofre 2 1,100 4/82 2/82 6/81 8

Oil Self-generated Shoreham 1 854 10/82 8/82 5/82 3

011 Self-generated SJamer 1 900 6/82 1/82 8/81 5

Coal.011 Self-senerated 011-Coal'I Self-generated Susquehanna 1 1,050 11/82 6/82 4/82 2

Waterford 3 1,165 1/83 11/82 10/82 1

011 Pierchased/

Self, generated; Z1a.ner 1 8to 7/82 S/82 11/81 6

Ca#1 011 Self-generated s

51 Total (new units)..........................................

TMI I 776 10/811/

10/812l d!

Oil, Coal Purchased Snurces: Utinity Companies Nuclear regulatory Consalaston

+

'. s least one month bef ore operating license is imeued.

Covers all units for which construction is expected to be completed atempedit ing procedures avm11mble to the Cosmatasion.

l/

Cl.e NHC projecteJ dates Jo snot reflectHowever, the unit was taken out of service for a 2/

Accosding to coinpany sources, THi 1 h.as receiveJ an operating licesise and h.as been in operation.

NRC and the rout tue ref ueling during February 1979, and was not allowed to return to service f ollowing the TH12 accident. - ^ ~ '---

3/

company pauject the, unit w!Il return to service in October 1981.

Delay would reduce utility's coal-firaal emporte which woulJ replace power in t'ae PJH pool derived f rota oil and less ef ficient coal plants.

the construction of thle unit has been delayed by ten conths (6/81 to 4/82).

4/

j/

Since last month's report, inc luit eJ.

6,./

Lelays for theme completed unite prior to 4/81 arm not

_ _. - _ _