ML19350D964

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1201/81-03 on 810414-15,17 & 22-24. Noncompliance Noted:Failure to Control Chart Replicate Measurements.Details Withheld (Ref 10CFR2.790)
ML19350D964
Person / Time
Site: 07001201
Issue date: 05/12/1981
From: Bates J, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19350D961 List:
References
70-1201-81-03, 70-1201-81-3, NUDOCS 8105270368
Download: ML19350D964 (1)


Text

.

MATEI'd.T" 7 ';Th74

..CD:iTA!::. :........;olifAT03 ~

/

UNITED STATES NUCLEAR REGULATORY COMMISSION g

5

.. c REGION 11 8

2 101 MARIETTA ST., N.W., SulTE 3100

, (" W /

ATI.ANTA, GEORGIA 30303 O

MAY 131981 Report No. 70-1201/31-03

^

Docket No.70-1201 License No. SNM-1168 Safeguards Group III Licensee:

Babcock and Wilcox Comoany Commercial NucleTr Fuel Plant Lyncnburg, VA 24505 Facility Name:

Commercial Nuclear Fuel Plant Inspection at:

Lynchburg, Virginia Inspection Conduc.ed: A::ril 14,15,17 and 22-24,1981 Date of Last Material Control and Accounting Inspection Visit:

February 17-19 and Maren 1-9, 1981.

Type of Inspection:

Unannounced Material Control & Accounting Inspector:.

/W/

5 5 /2 f/

e/

K W. Ba'tes,'Safeguarcs Chemist Cate Signec L/

Approved by: bTT%u Ul2 /9I E. J. McAlpine, 9ection Chief Date Signed Technical Inspection Brar Division of Engineering anc Technical Inspection Inspeccion Summary Areas Inspected: Measurement control program and follow-up on previous inspec-i tion findings.

The insoection involved 29 insoector hours on site by one NRC inspector.

Results: The licensee was found to be in compliailce with NRC requirements in the l

two areas examined during the inspection except for the following item:

Failure of the licensee to control chart replicate measurements.

i S-72 Cop 7 9

c c '7 Ccpies l

g

?.r ? 3 7,13Ocen~;r.t i3r.0% to D IIE.".E*.275IIIFJ 33OY.Td Ie;rC1008I~it'= =%3E**ifi i

810527O M 1

-