Text
.
..
,
fe%q'o
<?
UNITED STATES
~g
!
NUCLEAR REGULATORY COMMISSION
,
g
i
e
REGION 11
p*f
101 MARIETTA ST., N.W SulTE 3100
o,g
ATLANTA. GEORGIA 30303
MAY 181981
6'Y
,
,
'"'
(gNQ j \\)d
Tennessee Valley Authority
Q
,
Qp
'
ATTN:
H. G. Parris
gN
%
9
-
Manager of Power
,
500A Chestnut Street Tower II
A
C
Chattanooga, TN 37401
Li
g
.
s-
%
/ *N M' " g ')
- '
Gentlemen:
of
\\ -
I
Subject: Report No. 50-328/81-18
This refers to the routine inspection conducted by Mr. N. Econt ns of this office
on April 13-16, 1981, of activities authorized by NRC Constrixcion Permit No.
CPPR-73 for the Sequoyah facility and to the discussion of our findings held with
T. B. Northern, Jr. , at the conclusion of the inspection.
Areas examined during the inspection and our findings are discusted in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
-
in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of. Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC's Public Document Room.
If this report
contains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 days to this office
to withhold such information from public disclosure. Any such application must
I
include a full statement of the reasons on the basis of which it is claimed that
I
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document.
If we do not hear from you within the specified period, the report
will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
l
Si
el ,
l
J
,
.l
'vuo
'^;; ,yu1 rec *.or
Division"of, Resident and
Reactor Project Inspection
Enclosure: See Page 2
O
i
\\
l
8105270 M
Q
.
WAY 181981
'
Tennessee Valley Authority
2
4
Enclosure:
Inspection Report No. 50-328/81-18
cc w/ enc 1:
H. J. Green, Division Director
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Bur:ynski, Project Engir;se
H. N. Culver, Chief, Nuclear S.fety
,
Review Staff,
,
4
3
!
!
i